Council BooksBlandford - BlenheimOntarioSign inSubscribe
Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you
Read by hand. We read Blandford - Blenheim's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.

Questions · 8 so far

Things worth asking about

We read Blandford - Blenheim's financial reports and meeting minutes, and compared its numbers with 38 similar Ontario towns. These are the things that stood out.

What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer

Needs an answer

These are unusual enough that residents deserve a clear answer from council.

Needs an answerRising costs

Why did the cost of roads and snow grow 140% in 6 years?

+140%roads and snow, 2019 to 2025

Blandford - Blenheim spent $2.3M on roads and snow in 2019 and $5.5M in 2025. Prices only went up about 21% in that time. Only 0 of 38 similar towns had faster growth here.

Found automatically from the town's financial reports · 3 sources

Needs an answerMoney health

Does Blandford - Blenheim have enough saved for repairs and emergencies?

$4.5Min savings at the end of 2025

Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Blandford - Blenheim had $4.5M saved at the end of 2025, down from $4.6M in 2019. That is 42% of one year's spending. Only 1 of 38 similar towns had less, compared with what they spend.

Found automatically from the town's financial reports · 2 sources

Worth asking

Worth asking

There may well be a good reason. It is still worth asking what it is.

Worth askingMoney health

How will the Township pay for the Princeton Fire Hall, and what is the $3,000,000 of "Other Revenue" in the 2026 fire budget?

$2.0Mdebenture the Township says it will issue for the Princeton Fire Hall once construction is complete

Debt is money borrowed and paid back with interest. At the end of 2025 the Township owed $1,583,776 in long-term debt, and the interest it paid in the year rose from $3,934 to $69,456. The Township's own development charges report says the Princeton Fire Hall cost $2,177,836.30 in 2025 and that a $2.0M debenture (a loan the Township issues, paid back over years) is to be issued when construction is complete. The 2026 budget book shows $3,000,000 of one-time "Other Revenue" in the fire department and does not say what it is. The 2025 budget book had $2,000,000 in the same place, and the 2025 "Actual YTD" column shows only $116,807 of Other Revenue.

Found by reading the town's own documents · 4 sources

Worth askingRising costs

Why do the 2025 statements show $7,303,464 spent on transportation services when the budget column says $2,875,960?

$7,303,464spent on transportation services in 2025, against a budget column of $2,875,960

Transportation services means roads, bridges and winter control. In the audited Statement of Operations the 2025 budget for it is $2,875,960 and the actual is $7,303,464 (2024: $6,319,071). The Township's note on the budget says the operating budget is the one shown in that statement, and that capital work is budgeted project by project. The statements do not say how much of the $7,303,464 was capital-type work, or how much was non-cash amortization (the yearly wearing-out of roads and bridges on the books).

Found by reading the town's own documents · 4 sources

Worth askingMoney health

Why have the Township's net financial assets fallen from $2,748,633 to $69,882 in two years?

$69,882net financial assets at the end of 2025, down from $2,748,633 at the start of 2024

Net financial assets is what the Township has in cash and money owed to it, minus what it owes. The Township's own note says it "explains the Township's overall future revenue requirements and its ability to finance activities and meet its obligations." It was $2,748,633 at the start of 2024, $718,691 at the end of 2024 and $69,882 at the end of 2025, against a 2025 budget for $257,396. Cash fell from $4,950,695 to $3,046,140 in 2025, and reserves (savings set aside for later) fell from $4,981,289 to $4,459,184.

Found by reading the town's own documents · 3 sources

Good to know

Good to know

Background that helps make sense of the rest.

Good to knowMoney health

Why is the Township's development charges money $26,639 in the red at the end of 2025?

$(26,639)development charges balance at the end of 2025, down from $205,764

Development charges are fees on new buildings that pay for the roads, fire protection and parks that growth needs. The Township collected $52,539.00 in 2025 and moved $288,434.00 out to capital projects. The balance went from $205,764 held at the end of 2024 to minus $26,639, meaning the Township spent growth money it has not yet collected. The Township explains this in its own report: it says growth projects are sometimes finished before the fees have been collected, and the gap is covered by borrowing that future fees will repay.

Found by reading the town's own documents · 3 sources

Good to knowRising costs

Why did capital grants come in $2,675,333 below the budget column in 2025, and what is the $6,235,931 of unfinished work?

$6,235,931capital work in progress at the end of 2025, up from $3,546,038

Capital means roads, buildings and equipment that last years. In the audited statements the 2025 budget column expected $7,065,589 in government transfers for capital and the actual was $4,390,256 (a gap of $2,675,333, worked out by us). The statements also planned to buy $12,248,832 of capital assets and bought $5,770,715. Capital work in progress (projects not yet finished) grew from $3,546,038 to $6,235,931. The Township says capital budgets are set project by project, which fits projects that run across more than one year. The 2026 budget book shows the same pattern for roads: grants budgeted at 3,810,356 for 2025 against 718,425 in the year-to-date column.

Found by reading the town's own documents · 3 sources

Good to knowMoney health

Why did investment income and user fees come in well above budget in 2025?

$228,699investment income in 2025, against a budget of $106,802

The audited 2025 statements show investment income of $228,699 against a budget of $106,802, and user charges (fees for things like the arena and permits) of $902,240 against a budget of $709,613. Taxation was close to budget: $7,691,012 against $7,623,476. The Township does not explain the difference in the statements.

Found by reading the town's own documents · 1 source

Each question in full

Needs an answerFound automatically from financial reports

Why did the cost of roads and snow grow 140% in 6 years?

+140%roads and snow, 2019 to 2025

Blandford - Blenheim spent $2.3M on roads and snow in 2019 and $5.5M in 2025. Prices only went up about 21% in that time. Only 0 of 38 similar towns had faster growth here.

Why did the cost of roads and snow grow 140% in 6 years?
+140%
Show as a table
YearRoads and snowPrices (inflation)
2019+0%+0%
2020+3%+1%
2021+0%+4%
2022+8%+11%
2023+96%+16%
2024+97%+18%
2025+140%+21%

Change since the first year shown. The grey line is how much prices rose overall, for comparison.

Why it matters

When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.

It could be because…

  • The town added a service, a building or staff that residents asked for.
  • Costs were moved from another area, so the total did not really change.
  • Accounting rules changed how costs are sorted.
  • Large one-time costs, like a study, lawsuit or repair, landed in one year.

Questions you could ask

  1. What did the extra $3.2M a year pay for?
  2. Why did paved roads go from $328K to $3.2M?
  3. Was each increase approved by council as a separate decision, or did it happen through the yearly budget?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Roads and snow: 2019 $2.3M, 2020 $2.4M, 2021 $2.3M, 2022 $2.5M, 2023 $4.5M, 2024 $4.6M, 2025 $5.5M.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 40 · archived copy

  2. Biggest driver: Paved roads, from $328K to $3.2M.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 40 · archived copy

  3. Typical growth among similar towns: 43%. Blandford - Blenheim ranks 1st of 39.

    Ontario Financial Information Return (FIR), 2025, 38 similar municipalities · Schedule 40 · archived copy

↑ All questions

Needs an answerFound automatically from financial reports

Does Blandford - Blenheim have enough saved for repairs and emergencies?

$4.5Min savings at the end of 2025

Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Blandford - Blenheim had $4.5M saved at the end of 2025, down from $4.6M in 2019. That is 42% of one year's spending. Only 1 of 38 similar towns had less, compared with what they spend.

Does Blandford - Blenheim have enough saved for repairs and emergencies?
$4.5M
Show as a table
YearSavings (reserves)
2019$4.6M
2020$4.6M
2021$3.7M
2022$5.7M
2023$3.8M
2024$5.0M
2025$4.5M

Why it matters

With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.

It could be because…

  • The town spent savings on purpose, on projects that were planned and saved up for.
  • Some savings were used to match grant money, which brings in more than it costs.
  • The town has a plan to rebuild its savings.

Questions you could ask

  1. Does the town have a written reserve policy with a target amount?
  2. What were the savings spent on between 2019 and 2025?
  3. What is the plan to rebuild them, and by when?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Savings (reserves and reserve funds): 2019 $4.6M, 2020 $4.6M, 2021 $3.7M, 2022 $5.7M, 2023 $3.8M, 2024 $5.0M, 2025 $4.5M.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 70, line 6420 · archived copy

  2. Typical among similar towns: savings equal to 100% of a year's spending. Blandford - Blenheim: 42%.

    Ontario Financial Information Return (FIR), 2025, 38 similar municipalities · Schedules 40 and 70 · archived copy

↑ All questions

Worth askingFound by reading the town's documents

How will the Township pay for the Princeton Fire Hall, and what is the $3,000,000 of "Other Revenue" in the 2026 fire budget?

$2.0Mdebenture the Township says it will issue for the Princeton Fire Hall once construction is complete

Debt is money borrowed and paid back with interest. At the end of 2025 the Township owed $1,583,776 in long-term debt, and the interest it paid in the year rose from $3,934 to $69,456. The Township's own development charges report says the Princeton Fire Hall cost $2,177,836.30 in 2025 and that a $2.0M debenture (a loan the Township issues, paid back over years) is to be issued when construction is complete. The 2026 budget book shows $3,000,000 of one-time "Other Revenue" in the fire department and does not say what it is. The 2025 budget book had $2,000,000 in the same place, and the 2025 "Actual YTD" column shows only $116,807 of Other Revenue.

Why it matters

A loan has to be paid back by taxpayers or by future growth fees, for years. The Township says future development charges will help pay the debentures, but growth fees have been thin: see the question on development charges. Residents can fairly ask how big the new debt will be and what each year's payment will cost.

It could be because…

  • The "Other Revenue" in the budget book may simply be the planned loan. The report says the debenture is issued after construction, so the money would show up in a later year than the one it was budgeted for.
  • The Township says the Development Charges Act allows borrowing to build growth-related projects before the fees are collected, repaid from future fees.
  • The $3,000,000 in 2026 may be a different source, such as a donation, a grant or a second loan. The budget book does not say.
  • The "Actual YTD 2025" column in the budget book is the Township's year-to-date number when the book was made, not the audited figure.

Questions you could ask

  1. Has the $2.0M debenture for the Princeton Fire Hall been issued, at what interest rate, over how many years, and what is the yearly payment?
  2. What is the $3,000,000 of one-time "Other Revenue" in the 2026 fire budget, and is the 2025 figure of $2,000,000 the same money moving a year?
  3. How much of the yearly payment is to come from development charges and how much from property taxes?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The records that would answer this can be requested: Princeton Fire Hall debenture and financing, with wording you can copy.

The evidence

  1. Report to council, Financial Considerations: "external debt is permitted under the Development Charges Act, (1997) to cash flow the capital costs of the project and is repaid by the future DC collections. This is the case for both the Princeton Drainage project as well as the Princeton Fire Hall. Future DCs collected will assist in funding debenture payments for both of these projects." Project funding table: Princeton Fire Hall, 2025 project costs $2,177,836.30, with the note "**$2.0M debenture to be issued when construction is complete".

    Township of Blandford-Blenheim, 2025 Development Charges Annual Report (report to council, March 25, 2026) · PDF page 2 (Financial Considerations) and PDF page 5 (2025 Capital Project Funding Including Development Charges, Princeton Fire Hall row and footnote)

  2. Fire Department detail, "Other Revenue": Budget 2025 (2,039,700); 2026 One Time Impact (3,000,000); 2026 Proposed Budget (3,056,350); Actual YTD 2025 (116,807). "Capital Expenditures": Budget 2025 2,717,600; 2026 Proposed Budget 3,743,118. The page does not say what "Other Revenue" is.

    Township of Blandford-Blenheim, 2026 Approved Capital and Operation Budgets · PDF page 13 (Total Fire Department detail)

  3. Fire Department detail, "Other Revenue": Budget 2025 One Time Impact (2,000,000), Proposed Budget (2,039,700). "Capital Expenditures" 2,717,600.

    Township of Blandford-Blenheim, 2025 Approved Capital and Operation Budgets · PDF page 19 (Total Fire Department detail)

  4. Statement of Financial Position: "Net long-term liabilities (note 7)" 1,583,776 (2024: 1,630,200). Note 7e: "The Township paid interest on its long-term liabilities of $69,456 (2024 - $3,934)."

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 5 (Statement of Financial Position) and PDF page 15 (Note 7e)

↑ All questions

Worth askingFound by reading the town's documents

Why do the 2025 statements show $7,303,464 spent on transportation services when the budget column says $2,875,960?

$7,303,464spent on transportation services in 2025, against a budget column of $2,875,960

Transportation services means roads, bridges and winter control. In the audited Statement of Operations the 2025 budget for it is $2,875,960 and the actual is $7,303,464 (2024: $6,319,071). The Township's note on the budget says the operating budget is the one shown in that statement, and that capital work is budgeted project by project. The statements do not say how much of the $7,303,464 was capital-type work, or how much was non-cash amortization (the yearly wearing-out of roads and bridges on the books).

Why it matters

Roads are the biggest part of the Township's spending. A reader who compares the two columns sees a gap of more than four million dollars. The statements give part of the reason (different kinds of budget) but not enough for a resident to tell planned work from a cost overrun.

It could be because…

  • The Township says the budget column is the operating budget only, and capital work has separate project budgets. Much of the roads work in 2025 may be capital work paid for by grants and reserves.
  • Amortization (the yearly cost of using up roads and bridges) is a large non-cash part of the figure and may not be in the operating budget.
  • Work that is a repair, not a new asset, must be counted as spending in the year, even when it was planned as a capital project.

Questions you could ask

  1. Of the $7,303,464 spent on transportation services in 2025, how much was operating work, how much was repairs counted as spending, and how much was amortization?
  2. Which road and bridge projects make up the 2025 capital spending, and what did each cost against its budget?
  3. Could the audited statements show the capital budget beside the capital actual, so residents can compare like with like?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Statement of Operations, EXPENDITURES, "Transportation services": Budget 2025 2,875,960; Actual 2025 7,303,464; Actual 2024 6,319,071.

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 6 (Statement of Operations and Accumulated Surplus, printed page 4)

  2. Note 1.k Budget: "The approved operating budget for 2025 is reflected on the Statement of Operations and Accumulated Surplus. For capital spending, budgets are set for individual projects and funding for these activities is determined annually".

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 11 (Note 1.k)

  3. Schedule 2, segmented information, transportation column: salaries and benefits 1,231,062; materials, goods and services 4,253,262; rent and financial expenses 59,520; amortization 1,759,620; total 7,303,464 (the four lines add to the total).

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 18 (Schedule 2)

  4. Public Works - Roads, "Capital Expenditures": Budget 2025 11,745,232; Actual YTD 2025 7,958,946. "Total Public Works - Roads": Budget 2025 4,095,040; Actual YTD 2025 8,101,586.

    Township of Blandford-Blenheim, 2026 Approved Capital and Operation Budgets · PDF page 19 (Total Public Works - Roads detail)

↑ All questions

Worth askingFound by reading the town's documents

Why have the Township's net financial assets fallen from $2,748,633 to $69,882 in two years?

$69,882net financial assets at the end of 2025, down from $2,748,633 at the start of 2024

Net financial assets is what the Township has in cash and money owed to it, minus what it owes. The Township's own note says it "explains the Township's overall future revenue requirements and its ability to finance activities and meet its obligations." It was $2,748,633 at the start of 2024, $718,691 at the end of 2024 and $69,882 at the end of 2025, against a 2025 budget for $257,396. Cash fell from $4,950,695 to $3,046,140 in 2025, and reserves (savings set aside for later) fell from $4,981,289 to $4,459,184.

Why it matters

When this number reaches zero the Township has no cushion left beyond what it owns in roads, buildings and equipment, which cannot be spent. A fall can be a sign of building things the Township will use for years. It can also mean taxes or fees will have to rise or more debt will follow.

It could be because…

  • The Township spent $5,770,715 on capital assets in 2025 (and $5,230,790 in 2024). Money spent on roads, buildings and equipment leaves net financial assets but shows up as something the Township owns.
  • Accounts receivable (money owed to the Township) rose from $3,459,920 to $4,030,511, which may be grants not yet paid. When they arrive, net financial assets would rise.
  • Reserves are meant to be used. Drawing them down for planned projects is what they are for.

Questions you could ask

  1. What level of net financial assets and reserves does the Township aim to keep, and does it have a written policy?
  2. How much of the 2025 fall was spending on projects that grants will later repay, and how much came from the Township's own money?
  3. What does the 2026 budget expect net financial assets to be at the end of 2026, including the new fire hall debenture?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Statement of Change in Net Financial Assets: "NET FINANCIAL ASSETS, BEGINNING OF YEAR" 2024 actual 2,748,633; "NET FINANCIAL ASSETS, END OF YEAR" budget 2025 257,396, actual 2025 $ 69,882, actual 2024 $ 718,691. "Change in net financial assets" (648,809) in 2025 and (2,029,942) in 2024. "Acquisition of tangible capital assets" (5,770,715) in 2025 and (5,230,790) in 2024.

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 8 (Statement of Change in Net Financial Assets)

  2. Statement of Financial Position: "Cash" $ 3,046,140 (2024: $ 4,950,695). "Accounts receivable" 4,030,511 (2024: 3,459,920).

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 5 (Statement of Financial Position)

  3. Note 8 Accumulated Surplus: "Reserves" 4,459,184 (2024: 4,981,289).

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 15 (Note 8)

↑ All questions

Good to knowFound by reading the town's documents

Why is the Township's development charges money $26,639 in the red at the end of 2025?

$(26,639)development charges balance at the end of 2025, down from $205,764

Development charges are fees on new buildings that pay for the roads, fire protection and parks that growth needs. The Township collected $52,539.00 in 2025 and moved $288,434.00 out to capital projects. The balance went from $205,764 held at the end of 2024 to minus $26,639, meaning the Township spent growth money it has not yet collected. The Township explains this in its own report: it says growth projects are sometimes finished before the fees have been collected, and the gap is covered by borrowing that future fees will repay.

Why it matters

If growth is slower than hoped, the fees may not arrive, and the gap falls to existing taxpayers. This is allowed and common, so we rate it as context, not a concern. Residents can still ask how large the gap is expected to get.

It could be because…

  • The Township says the Development Charges Act allows this, and that it is the case for the Princeton Drainage project and the Princeton Fire Hall.
  • A small negative total at one date may reverse quickly as new homes pay their fees.
  • The Township says it is in compliance with the Act.

Questions you could ask

  1. How much growth-related debt is the Township carrying today, and how much new building must happen before it is repaid?
  2. Does the Township's development charges background study expect enough new homes to cover the debenture payments?
  3. What happens to the repayments if growth is slower than the study assumed?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Note 6 Deferred revenue: "Development charges" $ (26,639) (2024: $ 205,764).

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 13 (Note 6)

  2. Report to council: "The total amount of Development Charges collected in 2025 was $52,539.00." "The total amount transferred from Development Charges in 2025 was $288,434.00, all funding towards capital projects." Reserve fund table, "Balance at Year End", totals column: ($26,638.43).

    Township of Blandford-Blenheim, 2025 Development Charges Annual Report (report to council, March 25, 2026) · PDF page 2 (Analysis & Discussion) and PDF page 4 (Development Charges Reserve Funds, totals)

  3. Report to council: "In some cases, growth-related capital projects are completed prior to having fully collected the necessary DCs to fund the project. In these situations, external debt is permitted under the Development Charges Act, (1997) to cash flow the capital costs of the project and is repaid by the future DC collections."

    Township of Blandford-Blenheim, 2025 Development Charges Annual Report (report to council, March 25, 2026) · PDF page 2 (Financial Considerations)

↑ All questions

Good to knowFound by reading the town's documents

Why did capital grants come in $2,675,333 below the budget column in 2025, and what is the $6,235,931 of unfinished work?

$6,235,931capital work in progress at the end of 2025, up from $3,546,038

Capital means roads, buildings and equipment that last years. In the audited statements the 2025 budget column expected $7,065,589 in government transfers for capital and the actual was $4,390,256 (a gap of $2,675,333, worked out by us). The statements also planned to buy $12,248,832 of capital assets and bought $5,770,715. Capital work in progress (projects not yet finished) grew from $3,546,038 to $6,235,931. The Township says capital budgets are set project by project, which fits projects that run across more than one year. The 2026 budget book shows the same pattern for roads: grants budgeted at 3,810,356 for 2025 against 718,425 in the year-to-date column.

Why it matters

When grants arrive later than planned, the Township may pay first from its own savings or borrow. That ties back to the fall in net financial assets. It also means the budget is a rough guide to what will happen in a year.

It could be because…

  • Large projects such as the Princeton drainage and street work and the fire hall run for more than one year, so grants and spending land in later years than the budget.
  • Grants are often paid only after the work is done and the Township has submitted its claims.
  • The 2026 budget book's "Actual YTD 2025" column is not the audited figure.

Questions you could ask

  1. Which grants were expected in 2025 and have they since been paid or lost?
  2. Which projects make up the $6,235,931 in unfinished work, and when are they due to finish?
  3. When a grant is late, how does the Township pay for the work in the meantime?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Statement of Operations, "Government transfers related to capital": Budget 2025 7,065,589; Actual 2025 4,390,256; Actual 2024 2,503,811.

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 6 (Statement of Operations and Accumulated Surplus, printed page 4)

  2. Statement of Change in Net Financial Assets, "Acquisition of tangible capital assets": Budget 2025 (12,248,832); Actual 2025 (5,770,715). Statement of Financial Position, "Capital work in progress" 6,235,931 (2024: 3,546,038).

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 8 (Statement of Change in Net Financial Assets) and PDF page 5 (Statement of Financial Position)

  3. Public Works - Roads detail, "Federal / Provincial Grants": Budget 2025 (3,810,356); Actual YTD 2025 (718,425). "Contribution from Reserves": Budget 2025 (3,403,957); Actual YTD 2025 (878,480).

    Township of Blandford-Blenheim, 2026 Approved Capital and Operation Budgets · PDF page 19 (Total Public Works - Roads detail)

↑ All questions

Good to knowFound by reading the town's documents

Why did investment income and user fees come in well above budget in 2025?

$228,699investment income in 2025, against a budget of $106,802

The audited 2025 statements show investment income of $228,699 against a budget of $106,802, and user charges (fees for things like the arena and permits) of $902,240 against a budget of $709,613. Taxation was close to budget: $7,691,012 against $7,623,476. The Township does not explain the difference in the statements.

Why it matters

A budget that keeps coming in low on revenue can make the year look tighter than it is, and can lead to higher taxes than needed. It may also reflect caution.

It could be because…

  • Interest rates and cash balances are hard to predict, and cautious budgeting is common.
  • User fees depend on how much people use the arena, halls and permits, which can vary from year to year.
  • The 2024 actuals (investment income $272,646, user charges $937,165) were also well above the 2025 budget, so the budget may have been set before those results were known.

Questions you could ask

  1. How does the Township set the investment income and user fee budgets, and was the 2025 budget based on 2024 results?
  2. Will the 2026 budget for these lines be raised to match recent actuals?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Blandford - Blenheim? Send us your answer and we will publish it with this question.

The evidence

  1. Statement of Operations, REVENUE: "Investment income" Budget 2025 106,802; Actual 2025 228,699; Actual 2024 272,646. "User charges" Budget 2025 709,613; Actual 2025 902,240; Actual 2024 937,165. "Taxation revenue" Budget 2025 $ 7,623,476; Actual 2025 $ 7,691,012.

    Township of Blandford-Blenheim, Financial Statements, December 31, 2025 (auditor's report dated June 3, 2026) · PDF page 6 (Statement of Operations and Accumulated Surplus, printed page 4)

↑ All questions