We read Cockburn Island's financial reports and meeting minutes. These are the things that stood out.

What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Worth asking

Worth asking

There may well be a good reason. It is still worth asking what it is.

Worth askingMoney health

Why did the auditor give a qualified opinion on the 2024 statements, more than a year after the year ended?

Qualifiedopinion on the 2024 statements, signed February 27, 2026

The Township's auditor, BDO Canada LLP, said the 2024 statements are fair except for one thing it could not measure. The Township has not yet worked out what it will cost to retire its old assets (a rule called an asset retirement obligation, or ARO). The auditor's report is dated February 27, 2026, about 14 months after the year ended on December 31, 2024 (worked out by us). Council accepted the statements on March 11, 2026.

Found by reading the town's own documents · 6 sources

Worth askingMoney health

Why did the estimated cost of closing the landfill drop to $95,126, and is $10,000 set aside enough?

$95,126estimated present value of landfill closure and care, 2024 statements (2023: $240,830)

The 2024 statements say the present value of closing and caring for the landfill is $95,126. The year before, the same note said $240,830. The Township has recorded $76,200 of it so far. Council has since started saving, with a $10,000 term deposit, and has set a goal of at least $150,000 within 15 years. The note also says the landfill is expected to be full in 13 years.

Found by reading the town's own documents · 7 sources

Worth askingSpending level

What will the main dock repairs cost in total, when the 2026 budget set aside $20,000?

$60,000.00estimated cost of soil testing, the first step in the dock repairs (2026 budget line: $20,000)

At the July 8, 2026 meeting, council heard that the first step for the dock repairs, soil testing with boreholes, is estimated at $60,000.00. About $10,000 had already been spent on engineering fees, and another $20,000 to $25,000 would be needed in the next 6 to 8 months. Council then authorized a member to proceed with the repairs and soil sampling. The 2026 budget has $20,000 for dock rehabilitation.

Found by reading the town's own documents · 5 sources

Good to know

Good to know

Background that helps make sense of the rest.

Good to knowSpending level

Were other machines or quotes compared before council spent about $130,756 on a used boom mower?

$130,756.10total approved on February 4, 2026 for a used boom mower, including parts and tax

On February 4, 2026, council approved buying a used 120 HP boom mower for $105,000 plus about $10,700 of parts, a total of $130,756.10 with tax, and a used dump trailer for $22,600. Both were to be paid from a $150,000 term deposit. The minutes we read do not record other quotes or a call for tenders for either machine. The two purchases together are $153,356.10, which is $3,356.10 more than the $150,000 deposit (worked out by us from $130,756.10, $22,600 and $150,000). The 2026 budget shows $130,000 for the mower and we did not find a line for a trailer.

Found by reading the town's own documents · 5 sources

Good to knowMoney health

How much of the Township's own income depends on one voluntary payment from a conservation charity?

$40,000yearly payment agreed with NCC in 2026 dollars (2026 budget line: 38,000)

The 2026 budget counts on 38,000 from the Nature Conservancy of Canada (NCC), next to a general tax levy of 106,398 on homes and 1,002 on managed forest. We worked out that the NCC line is about 26 percent of those three lines together. The Township's minutes call part of this payment voluntary. Separately, the 2024 statements say about 46 percent of total taxation came from two ratepayers. We do not say who they are, and we do not link the two facts.

Found by reading the town's own documents · 4 sources

Good to knowOpenness

Are the Township's key documents posted and easy to find?

The Township posts its minutes, by-laws and the 2024 audited statements. We did not find the 2025 audited statements, the earlier-year budgets, a council pay statement, agendas, or a conflict-of-interest registry on its site. The link for the October 8, 2025 minutes returned 'Not Found' when we opened it on October 7, 2026. The 2025 asset management plan is not posted; only a 2018 one is.

Found by reading the town's own documents · 4 sources

Good to knowHow decisions are made

Were all building permit fees owed since 2019 collected, and are the buildings assessed?

In May 2025 council was told there were only five closed building permits since 2019. It then asked staff to find out which permits since 2019 had been paid for and to work with MPAC (the province's assessment agency) so the properties' assessments are updated. By September 2025 the minutes say all but one fee had been collected. In August 2026 council agreed to send letters asking for proof of a permit when none is on file.

Found by reading the town's own documents · 4 sources

Good to knowMoney health

Cockburn Island went from having money in the bank to owing more than it has. What changed?

−$110Knet financial position, 2024

In 2019, Cockburn Island had $116K more in cash and money owed to it than it owed to others. By 2024 it was −$110K. About 34% of that change ($76,200) is a new accounting rule from 2023: towns must now record the future cost of closing things like a landfill. That is not new spending or borrowing. Even leaving that out, only 0 of 0 similar towns are in a weaker position.

Found automatically from the town's financial reports · 2 sources

Each question in full

Worth askingFound by reading the town's documents

Why did the auditor give a qualified opinion on the 2024 statements, more than a year after the year ended?

Qualifiedopinion on the 2024 statements, signed February 27, 2026

The Township's auditor, BDO Canada LLP, said the 2024 statements are fair except for one thing it could not measure. The Township has not yet worked out what it will cost to retire its old assets (a rule called an asset retirement obligation, or ARO). The auditor's report is dated February 27, 2026, about 14 months after the year ended on December 31, 2024 (worked out by us). Council accepted the statements on March 11, 2026.

Why it matters

The audit is the main outside check on whether the Township's yearly numbers can be trusted. A qualified opinion means the auditor could not say how much the missing piece changes the expenses, assets and surplus. The Township's own minutes show it has started work on the fix, so the useful question is when the fix will be finished.

It could be because…

  • The ARO rule is new for small municipalities, and the Township's minutes say only its landfill is affected, so the fix may be one engineering study.
  • The Township is on an island reached by boat, which can slow site visits and the work that follows.
  • A very small township with part-time administration may simply take longer to hand its records to the auditor.

Questions you could ask

  1. Has the engineering work on the landfill been finished, and when will the asset retirement obligation be recorded in the statements?
  2. Will the 2025 statements still carry a qualified opinion, and when will they be posted?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. The auditor wrote that the statements present fairly "except for the possible effects of the matter described in the Basis for Qualified Opinion section of our report". The basis section says: "Management has not completed its assessment of the tangible capital assets for potential asset retirement obligations."

    Consolidated Financial Statements, year ended December 31, 2024 (Township of Cockburn Island) · Independent Auditor's Report, PDF page 4

  2. The report is signed at Sault Ste. Marie, Ontario and dated February 27, 2026. The statements are for the year ended December 31, 2024.

    Consolidated Financial Statements, year ended December 31, 2024 (Township of Cockburn Island) · Independent Auditor's Report (continued), PDF page 5

  3. Council passed a motion: "That we accept with appreciation the 2024 audited financial statements as prepared by the township's municipal auditors, BDO LLP."

    Council minutes, March 11, 2026 (Township of Cockburn Island) · Action Items, 2024 audit, PDF page 1

  4. For the year before, council passed a motion: "That Council accepts with appreciation the 2023 municipal financial audit provided by BDO LLP of Sault Ste. Marie." This was on February 12, 2025.

    Council minutes, February 12, 2025 (Township of Cockburn Island) · Action Items, 2023 Audited Financials Presentation, PDF page 2

  5. The Township's own answer: council resolved to "begin the process to achieve compliance by soliciting a quote from Tulloch Engineering" for work its auditor described, including the estimated date of closure of the landfill and the cost of closure.

    Council minutes, July 9, 2025 (Township of Cockburn Island) · Action Items, Province's Asset Retirement Obligation (ARO), PDF page 4

  6. The 2026 budget has a line "Land Fill - ARO, TULLOCH" of 7,000.

    By-law 2026-04, 2026 estimates and tax rates (Township of Cockburn Island) · Estimates, expenses, PDF page 3

↑ All questions

Worth askingFound by reading the town's documents

Why did the estimated cost of closing the landfill drop to $95,126, and is $10,000 set aside enough?

$95,126estimated present value of landfill closure and care, 2024 statements (2023: $240,830)

The 2024 statements say the present value of closing and caring for the landfill is $95,126. The year before, the same note said $240,830. The Township has recorded $76,200 of it so far. Council has since started saving, with a $10,000 term deposit, and has set a goal of at least $150,000 within 15 years. The note also says the landfill is expected to be full in 13 years.

Why it matters

A landfill has to be closed and watched for years, and a small township with about $107,400 of yearly property tax (the 2026 by-law's $106,398 residential and $1,002 managed forest levies, worked out by us) cannot easily pay a big surprise. A large change in the estimate also changes the yearly surplus, so residents should know what it rests on.

It could be because…

  • The earlier figure may have used older assumptions, such as a 2002 engineering report the minutes mention, and the new figure may reflect a newer method or a lower discount rate.
  • The savings goal of $150,000 also covers moving or enlarging the site, not only closing it, so it is not meant to match the closing estimate.
  • An engineer's study ordered in 2025 may soon replace both numbers.

Questions you could ask

  1. What changed between the $240,830 estimate and the $95,126 estimate, and which engineer or report is each based on?
  2. Will the Tulloch Engineering study replace the estimate, and will council publish the result?
  3. Who will pay if the province, as owner of the land, asks the Township to move or close the site sooner?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. Note 4 says: "It is estimated that the total net present value of the closure and post-closure care is $95,126 (2023 - $240,830), of which $76,200 (2023 - $70,400) has been recognized to December 31, 2024." It also says the landfill is expected to reach its capacity in 13 years (2023 - 14 years).

    Consolidated Financial Statements, year ended December 31, 2024 (Township of Cockburn Island) · Note 4, Solid waste closure and post-closure liabilities, PDF page 13

  2. Note 6 splits each year's surplus into parts. The part called 'Unfunded landfill liabilities' is (5,800) for 2024 and 111,300 for 2023, out of annual surpluses of $38,708 and $200,860.

    Consolidated Financial Statements, year ended December 31, 2024 (Township of Cockburn Island) · Note 6, Accumulated surplus, Allocation of annual surplus (deficit), PDF page 14

  3. Council resolved to save for landfill work "by investing instead in a series of Term Deposits with a notional goal of having no less than $150,000 saved for this purpose within 15 years."

    Council minutes, September 17, 2025 (Township of Cockburn Island) · Action Items, Close landfill Account?, PDF page 2

  4. The minutes say the land the dump is on is owned by the Ministry of Natural Resources and Forestry, and that council would leave the question until the Ministry gives direction, while it continues to make transfers to the landfill fund.

    Council minutes, August 2, 2025 (Township of Cockburn Island) · Council Members' Concerns, PDF page 4

  5. The November 2025 bank list shows a "LANDFILL GIC 403" (a one-year term deposit) of $10,000.00.

    Council minutes, November 19, 2025 (Township of Cockburn Island) · Financial Report, PDF page 5

  6. The 2026 budget's capital list has a line "Land Fill Site CLOSURE SAVINGS ACC'T" of 10,000.

    By-law 2026-04, 2026 estimates and tax rates (Township of Cockburn Island) · Estimates, capital, PDF page 4

  7. By-law 2026-04, section 1: "there shall be levied and collected upon the assessable lands $106,398 Residential and $ 1,002 Managed Forest for the General Purposes of the Municipality."

    By-law 2026-04, 2026 estimates and tax rates (Township of Cockburn Island) · section 1, PDF page 1

↑ All questions

Worth askingFound by reading the town's documents

What will the main dock repairs cost in total, when the 2026 budget set aside $20,000?

$60,000.00estimated cost of soil testing, the first step in the dock repairs (2026 budget line: $20,000)

At the July 8, 2026 meeting, council heard that the first step for the dock repairs, soil testing with boreholes, is estimated at $60,000.00. About $10,000 had already been spent on engineering fees, and another $20,000 to $25,000 would be needed in the next 6 to 8 months. Council then authorized a member to proceed with the repairs and soil sampling. The 2026 budget has $20,000 for dock rehabilitation.

Why it matters

The dock is the only way on and off the island, so repairs matter to everyone. The numbers in the minutes are already several times the budget line, and no total for the whole job is printed in the documents we read.

It could be because…

  • The Township had about $346,981.82 in its operating account at the end of July 2026, so it may be able to pay from cash and savings.
  • Council is applying for outside money, including a provincial accessibility grant of up to $60,000 for the marina, so the Township's own share may be small.
  • Council has said the dock repairs are its first priority, and the cost may have grown as engineers looked at the concrete and the ground under it.
  • Last year's dock project came in at an estimated $45,000 against $55,000 approved, so the Township has finished a dock job under budget before.

Questions you could ask

  1. What is the total expected cost of the dock repairs, including engineering, soil testing and construction?
  2. How will it be paid for, and how much of it depends on grants that have not yet been awarded?
  3. Will council set a spending limit before the work is awarded, and will the engineer's report be posted?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. The minutes say: "The first step required for the dock repairs is to soil test through boreholes at an estimated cost of $60,000.00." They also say "approximately $10,000 already spent on engineering fees" and "An additional $20,000 to $25,000 will be needed in the next 6-8 months." Council authorized a member to proceed with the dock repairs and soil sampling.

    Council minutes, July 8, 2026 (Township of Cockburn Island) · Council Members' Concerns, PDF page 4

  2. The 2026 capital list has a line "DOCKS REHABILITATION - CAPITAL DOCK" of 20,000.

    By-law 2026-04, 2026 estimates and tax rates (Township of Cockburn Island) · Estimates, capital, PDF page 4

  3. Council authorized an application to the provincial EASE grant, which "awards up to $60,000" for small capital projects, for access improvements at the marina (lighting, dock ramps and dock resurfacing).

    Council minutes, April 8, 2026 (Township of Cockburn Island) · Action Items, EASE grant, PDF page 4

  4. The operating account balance was $346,981.82 as of July 28, 2026. The minutes also say the soil-sample drilling is "progressing slower than expected".

    Council minutes, August 1, 2026 (Township of Cockburn Island) · Financial Report and Council Members' Concerns, PDF page 3

  5. In 2025 a member reported that "the 2025 estimate cost for the dock project is $45,000 instead of $55,000".

    Council minutes, August 2, 2025 (Township of Cockburn Island) · Council Members' Concerns, PDF page 4

↑ All questions

Worth askingFound automatically from financial reports

Why did the cost of running the town office grow 102% in 5 years?

+102%running the town office, 2019 to 2024

Cockburn Island spent $81,369 on running the town office in 2019 and $164K in 2024. Prices only went up about 18% in that time.

Why did the cost of running the town office grow 102% in 5 years?
+102%
Show as a table
YearRunning the town officePrices (inflation)
2019+0%+0%
2020−3%+1%
2021+18%+4%
2022+52%+11%
2023+58%+16%
2024+102%+18%

Change since the first year shown. The grey line is how much prices rose overall, for comparison.

Why it matters

Money spent running the office is money not spent on roads, water or safety. When office costs grow much faster than the services people see, it is fair to ask what the extra money is buying.

It could be because…

  • The town added a service, a building or staff that residents asked for.
  • Costs were moved from another area, so the total did not really change.
  • Accounting rules changed how costs are sorted.
  • Large one-time costs, like a study, lawsuit or repair, landed in one year.

Questions you could ask

  1. What did the extra $82,598 a year pay for?
  2. Why did council go from $19,832 to $159K?
  3. Was each increase approved by council as a separate decision, or did it happen through the yearly budget?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. Running the town office: 2019 $81,369, 2020 $79,195, 2021 $96,389, 2022 $123K, 2023 $129K, 2024 $164K.

    Ontario Financial Information Return (FIR), 2019 to 2024 · Schedule 40 · archived copy

  2. Biggest driver: Council, from $19,832 to $159K.

    Ontario Financial Information Return (FIR), 2019 to 2024 · Schedule 40 · archived copy

↑ All questions

Good to knowFound by reading the town's documents

Were other machines or quotes compared before council spent about $130,756 on a used boom mower?

$130,756.10total approved on February 4, 2026 for a used boom mower, including parts and tax

On February 4, 2026, council approved buying a used 120 HP boom mower for $105,000 plus about $10,700 of parts, a total of $130,756.10 with tax, and a used dump trailer for $22,600. Both were to be paid from a $150,000 term deposit. The minutes we read do not record other quotes or a call for tenders for either machine. The two purchases together are $153,356.10, which is $3,356.10 more than the $150,000 deposit (worked out by us from $130,756.10, $22,600 and $150,000). The 2026 budget shows $130,000 for the mower and we did not find a line for a trailer.

Why it matters

This was about 40 percent of the 2026 capital list, and most of the Township's savings in term deposits. The Township asked for quotes on other jobs, such as the street lights. Residents can reasonably ask how this price was checked.

It could be because…

  • Used machines of this kind are sold one at a time, so there may be little to compare, and council may have looked at others without recording it.
  • The asking price of $110,000 was brought down to $105,000, so some bargaining did happen.
  • The old machine was failing and needed frequent repairs, so council may have judged that waiting was costly.
  • The Township sold its old tractor and trailer by tender in July 2026, so it does use tenders for some sales.

Questions you could ask

  1. Did the Township compare other machines or ask for other quotes for the mower and the trailer? If so, can the comparison be posted?
  2. Does the Township have a written rule for when quotes or tenders are required, and at what dollar amount?
  3. Where in the 2026 budget does the $22,600 trailer sit, and how was the $3,356.10 above the $150,000 term deposit covered (interest on the deposit may account for it)?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. A member of council described a 2018 John Deere 120 HP boom mower, saying the old brush-hog tractor needs frequent repairs. The minutes say: "Current asking price is $110,000 which he would try to have reduced." Council authorized that member to investigate and possibly proceed on council's behalf, subject to finances and a test run.

    Council minutes, January 14, 2026 (Township of Cockburn Island) · Council Members' Concerns, PDF page 3

  2. Council approved a purchase price of $105,000 plus about $10,700 for parts, "for a total before tax of $115,713.36 (Taxes= $15,042.74 Grand Total= $130,756.10)", and authorized staff to redeem the township's $150,000 GIC (a term deposit) at NCU for it.

    Council minutes, February 4, 2026 (Township of Cockburn Island) · Action Items, Report on New Boom Mower (Brush Hog) Purchase, PDF page 2

  3. Council also approved a used 2016 tandem axle dump trailer for $20,000 plus HST ($2600), "Grand Total = $22,600", using what was left of the $150,000 term deposit.

    Council minutes, February 4, 2026 (Township of Cockburn Island) · Action Items, dump trailer resolution, PDF page 3

  4. The 2026 capital list has "JOHN DEERE BOOM MOWER, 120 HP" at 130,000, a total capital of 325,500, and a net of "FROM RESERVES (GIC)" of 121,639. We did not find a dump trailer line.

    By-law 2026-04, 2026 estimates and tax rates (Township of Cockburn Island) · Estimates, capital, PDF page 4

  5. For the street lights, council recorded that "two (2) quotes were received for the repair of streetlights" and noted that the bids "were both well over the Township's budget".

    Council minutes, June 11, 2025 (Township of Cockburn Island) · Action Items, Update on Streetlights tender, PDF pages 2 and 3

↑ All questions

Good to knowFound by reading the town's documents

How much of the Township's own income depends on one voluntary payment from a conservation charity?

$40,000yearly payment agreed with NCC in 2026 dollars (2026 budget line: 38,000)

The 2026 budget counts on 38,000 from the Nature Conservancy of Canada (NCC), next to a general tax levy of 106,398 on homes and 1,002 on managed forest. We worked out that the NCC line is about 26 percent of those three lines together. The Township's minutes call part of this payment voluntary. Separately, the 2024 statements say about 46 percent of total taxation came from two ratepayers. We do not say who they are, and we do not link the two facts.

Why it matters

When a small share of payers covers most of the bill, a change by one of them can move the whole budget. The Township has already written down a plan to make the NCC amount more predictable.

It could be because…

  • The payment replaces tax that is lower because forest land was changed from residential to managed forest or exempt, so it is a way to keep the Township whole.
  • The Township and NCC have agreed on a fixed amount that rises each year by the Township's tax increase, which makes it steadier.
  • On a small island, a few large landowners are expected to carry much of the levy.

Questions you could ask

  1. Is the NCC agreement in writing, and how long does it last?
  2. What would the Township do if either the NCC payment or one of its largest tax accounts changed?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. The 2026 budget lists "NCC Levy Contribution est'd" at 38,000, "Gen Levy Res. & Farm" at 106,398 and "Levy on Managed Forest" at 1,002.

    By-law 2026-04, 2026 estimates and tax rates (Township of Cockburn Island) · Estimates, revenue, PDF page 2

  2. Council wrote that NCC "has, for years, voluntarily provided a support grant" and set out a plan for NCC, which "would continue to provide annual payments of $40,000 (in 2026 dollars)".

    Council minutes, November 19, 2025 (Township of Cockburn Island) · Action Items, NCC Support Grant, PDF page 3

  3. Council agreed to continue with the arrangement, with the base fixed at $40,000 and adjusted yearly by the tax increase.

    Council minutes, May 13, 2026 (Township of Cockburn Island) · Action Items, NCC Support Grant, PDF pages 2 and 3

  4. Note 2 says: "Approximately 46% (2023 - 51%) of total taxation was levied upon two ratepayers."

    Consolidated Financial Statements, year ended December 31, 2024 (Township of Cockburn Island) · Note 2, Taxation, PDF page 13

↑ All questions

Good to knowFound by reading the town's documents

Are the Township's key documents posted and easy to find?

The Township posts its minutes, by-laws and the 2024 audited statements. We did not find the 2025 audited statements, the earlier-year budgets, a council pay statement, agendas, or a conflict-of-interest registry on its site. The link for the October 8, 2025 minutes returned 'Not Found' when we opened it on October 7, 2026. The 2025 asset management plan is not posted; only a 2018 one is.

Why it matters

Residents mostly live elsewhere and follow the Township online. Documents they cannot find are documents they cannot check.

It could be because…

  • The Township has very little staff, and staff turned over on May 1, 2026, so posting may lag.
  • Some items may be posted somewhere we did not look, or can be had by asking staff.
  • The broken link may be a simple filing error.

Questions you could ask

  1. When will the 2025 audited statements and the 2025 asset management plan be posted?
  2. Will the Township post the yearly council pay statement and the October 8, 2025 minutes?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. The Council/Minutes page lists "Council Minutes: Oct 8, 2025" with a link to docs/2025/Minutes_251008.pdf. That link returned 'Not Found' when we opened it on October 7, 2026.

    Council page (Township of Cockburn Island website) · Council Minutes table, row dated 2025/10/08

  2. The minutes say the 2025 asset management plan "has been submitted to the Ontario Ministry of Infrastructure" and ask whether to upload it to the website.

    Council minutes, September 17, 2025 (Township of Cockburn Island) · Staff report, item e, PDF page 5

  3. The December 2025 minutes record: "The council honorarium report has been distributed." We did not find a council pay statement on the website.

    Council minutes, December 10, 2025 (Township of Cockburn Island) · Staff report, item c, PDF page 4

  4. The April 2026 handover notes list the 2025 audit as still to be done, with the audit box still to be sent to the auditor.

    Council minutes, April 8, 2026 (Township of Cockburn Island) · Staff report, handover files, PDF page 6

↑ All questions

Good to knowFound by reading the town's documents

Were all building permit fees owed since 2019 collected, and are the buildings assessed?

In May 2025 council was told there were only five closed building permits since 2019. It then asked staff to find out which permits since 2019 had been paid for and to work with MPAC (the province's assessment agency) so the properties' assessments are updated. By September 2025 the minutes say all but one fee had been collected. In August 2026 council agreed to send letters asking for proof of a permit when none is on file.

Why it matters

Permit fees belong to the Township, and unpermitted buildings may not be assessed, which affects taxes. The Township has already acted on this, so we raise it as context.

It could be because…

  • Many island buildings are small seasonal ones, and the inspector can only visit between May 15 and October 31 and when the weather allows.
  • The Township had no permit by-law and no steady inspector for some years and has since fixed both.
  • One unpaid fee out of the list is a good result and may be closed soon.

Questions you could ask

  1. Has the last unpaid fee been collected, and have all the affected properties been reported to MPAC?
  2. How many buildings with no permit on file have been found since the Township began asking?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. The meeting notes say that the township was told there are "five closed permits since 2019" and that inspections run "May 15 to October 31 only".

    Council minutes, May 28, 2025 (special meeting) (Township of Cockburn Island) · Building Permit Discussion, notes, PDF page 2

  2. Council directed staff to determine which building permits since 2019 had been paid for, and to work with MPAC to make sure the properties' assessments have been updated.

    Council minutes, June 11, 2025 (Township of Cockburn Island) · Action Items, building permit update, PDF page 3

  3. The minutes say: "Building Permit update - all but one has been collected."

    Council minutes, September 17, 2025 (Township of Cockburn Island) · Staff report, item k, PDF page 5

  4. In August 2026 council directed staff to send a letter asking a ratepayer for proof of a building permit when none can be found on file.

    Council minutes, August 1, 2026 (Township of Cockburn Island) · Staff report, building permits, PDF page 4

↑ All questions

Good to knowFound automatically from financial reports

Cockburn Island went from having money in the bank to owing more than it has. What changed?

−$110Knet financial position, 2024

In 2019, Cockburn Island had $116K more in cash and money owed to it than it owed to others. By 2024 it was −$110K. About 34% of that change ($76,200) is a new accounting rule from 2023: towns must now record the future cost of closing things like a landfill. That is not new spending or borrowing. Even leaving that out, only 0 of 0 similar towns are in a weaker position.

Cockburn Island went from having money in the bank to owing more than it has. What changed?
−$110K
Show as a table
YearNet financial position
2019$116K
2020$116K
2021$147K
2022−$51,560
2023−$230K
2024−$110K

Why it matters

This number is one of the clearest signs of whether a town is living within its means. The accounting-rule part is a bill that will come due when the landfill closes, not money already spent. The rest is real borrowing and spending of savings.

It could be because…

  • A new accounting rule (asset retirement obligations, from 2023) added a large future cost to the books all at once.
  • Borrowing for a planned project, such as sewage lagoons, which is paid back over many years.

Questions you could ask

  1. What is the plan and timeline for paying the landfill closing cost?
  2. Without the accounting change, is the town's position getting better or worse?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Cockburn Island? Send us your answer and we will publish it with this question.

The evidence

  1. Net financial assets: 2019 $116K, 2020 $116K, 2021 $147K, 2022 −$51,560, 2023 −$230K, 2024 −$110K.

    Ontario Financial Information Return (FIR), 2019 to 2024 · Schedule 70, line 9945 · archived copy

  2. Future landfill and similar closing costs recorded: $76,200. Long-term debt: $282K. Temporary loans: $0.

    Ontario Financial Information Return (FIR), 2019 to 2024 · Schedule 70, lines 2920, 2699, 2099 · archived copy