Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read East Ferris's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
Questions · 9 so far
Things worth asking about
We read East Ferris' financial reports and meeting minutes, and compared its numbers with 22 similar Ontario towns. These are the things that stood out.
What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer
Needs an answer
These are unusual enough that residents deserve a clear answer from council.
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. East Ferris had $1.4M saved at the end of 2024, down from $2.0M in 2019. That is 16% of one year's spending. Only 1 of 22 similar towns had less, compared with what they spend.
Found automatically from the town's financial reports · 2 sources
Worth asking
Worth asking
There may well be a good reason. It is still worth asking what it is.
$6,102,696the Cassellholme redevelopment commitment at December 31, 2025
Cassellholme is the long-term care home that East Ferris and other municipalities fund together. Its rebuild is paid for by a loan, and each municipality is responsible for its share. The 2025 statements say the Municipality "identified that a financial liability related to the East Nipissing District Home for the Aged redevelopment commitment should have been recognized in prior periods." To fix this, the 2024 numbers were restated (changed after they were first published). Municipal debt for 2024 went from $6,864,846 to $12,704,733, and the accumulated surplus (everything the Municipality owns less what it owes) went from $25,263,318 to $19,423,431. At the end of 2025 the commitment is $6,102,696. The Municipality also guarantees part of the loan, up to $4,298,322.
Found by reading the town's own documents · 4 sources
$3,250,000municipal debt issued in 2025, against $190,000 in the budget reconciliation
The 2025 cash flow statement shows $3,250,000 of municipal debt issued. The budget reconciliation in the same statements lists "Municipal debt issued" of $190,000. Three new term loans, all ending in 2030, carry interest of 4.41%, 4.37% and 4.02%. The statements also show $1,540,000 held in guaranteed investment certificates (a bank savings product that pays a fixed rate) earning 2.50% to 2.80%. Cash at the start of 2025 was $185,706, and $600,000 of short-term borrowing was repaid during the year.
Found by reading the town's own documents · 4 sources
$495,146deficit before capital grants in 2025 (budget: $803,451)
Before capital grants, the statements show a deficit (spending more than revenue) in each of the last three years: $15,535 in 2023, $640,879 in 2024 and $495,146 in 2025. Each year ends in a surplus only because government grants for building projects are added below that line: $548,183 from the province and $425,409 from the federal government in 2025. The Municipality's own budget for 2025 also planned a deficit before these grants, of $803,451. Part of the deficit is amortization (the yearly wear on roads, buildings and equipment, which is a bookkeeping cost, not cash paid), at $1,571,913 in 2025.
Found by reading the town's own documents · 3 sources
A reserve is money a town sets aside for a later purpose. At the end of 2025 East Ferris's reserves total $1,479,907, spread over nine funds. The largest, for future capital (building and replacing things), holds $503,437. The "Fire and emergency services equipment" reserve holds $69,217. The Mayor's 2026 newsletter says land for a new fire hall was bought in 2025 and that design is the next step. The statements show net debt (what the Municipality owes less its financial assets) of $14,425,727 at the end of 2025.
Found by reading the town's own documents · 3 sources
October 5, 2026date of the auditor's report on the 2025 statements
The auditor's report is dated October 5, 2026 for the year ending December 31, 2025. The 2024 statements carry an auditor's report dated July 8, 2025. The 2023 statements, as posted, carry an auditor's report dated May 27, 2025, which is more than a year after that year ended. Dates this late mean residents had no audited picture of the Municipality's finances for most of each following year.
Found by reading the town's own documents · 3 sources
2021the only budget heading on the Budget page, with no document under it
The Municipality's Budget page says "Each year, Council approves a balanced budget" and explains the operating and capital budgets, but the only heading under it is "2021 Budget", with nothing inside. We did not find a 2025 or 2026 budget on the site. The Mayor's 2026 newsletter says "the Municipality's 2026 Budget is in the final stages of approval." Without the budget, the budget columns in the audited statements cannot be checked against what Council passed.
Found by reading the town's own documents · 2 sources
No amount giventhe statements do not estimate the cost of the contaminated site
The 2025 statements list two possible costs that are not counted in the numbers. The Municipality says it has identified a possible liability for a contaminated site known as the St. Theresa School Site, and that it "is not possible at this time to determine the amount, if any." It also says it is involved in "certain legal matters and litigations" whose results cannot yet be known, and Council's view is that any liability is unlikely to be material.
Found by reading the town's own documents · 1 source
$535,391landfill closure and care obligation at December 31, 2025
The Municipality records a $535,391 obligation to close and care for its landfill (a rubbish dump) after it is full. It estimates 65% of capacity remains (226,000 m3) and about 58 years of life. The notes say the most recent waste capacity study for the landfill site was performed in a report dated February 2014.
Found by reading the town's own documents · 1 source
Each question in full
Needs an answerFound automatically from financial reports
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. East Ferris had $1.4M saved at the end of 2024, down from $2.0M in 2019. That is 16% of one year's spending. Only 1 of 22 similar towns had less, compared with what they spend.
Does East Ferris have enough saved for repairs and emergencies?
$0$500K$1.0M$1.5M$2.0M$2.5M
$1.4M
201920202021202220232024
Show as a table
Year
Savings (reserves)
2019
$2.0M
2020
$1.5M
2021
$1.4M
2022
$1.5M
2023
$1.4M
2024
$1.4M
Why it matters
With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.
It could be because…
The town spent savings on purpose, on projects that were planned and saved up for.
Some savings were used to match grant money, which brings in more than it costs.
The town has a plan to rebuild its savings.
Questions you could ask
Does the town have a written reserve policy with a target amount?
What were the savings spent on between 2019 and 2024?
What is the plan to rebuild them, and by when?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
$6,102,696the Cassellholme redevelopment commitment at December 31, 2025
Cassellholme is the long-term care home that East Ferris and other municipalities fund together. Its rebuild is paid for by a loan, and each municipality is responsible for its share. The 2025 statements say the Municipality "identified that a financial liability related to the East Nipissing District Home for the Aged redevelopment commitment should have been recognized in prior periods." To fix this, the 2024 numbers were restated (changed after they were first published). Municipal debt for 2024 went from $6,864,846 to $12,704,733, and the accumulated surplus (everything the Municipality owns less what it owes) went from $25,263,318 to $19,423,431. At the end of 2025 the commitment is $6,102,696. The Municipality also guarantees part of the loan, up to $4,298,322.
Why it matters
A debt that is not on the books makes a town look richer than it is. Here the debt was added back with a full explanation, and the auditor's opinion is clean, which is how a correction should look. What residents may still want to know is how big the bill is, when it arrives and how it will be paid for, because it is now the largest piece of the Municipality's debt.
It could be because…
Accounting rules for shared debts of this kind are not simple. Finding the gap and fixing it openly, with a clean audit opinion, is what the process is for.
The payments do not start until 2026 and building is expected to finish in 2028 (according to the note), so the money is not due all at once.
The 2024 statements already described the guarantee in a note, so the commitment was disclosed, even if it was not counted as a debt.
Questions you could ask
What are the yearly payments East Ferris expects to make to Cassellholme from 2026 on, and how will they be paid for?
How did the Municipality find that the liability was missing, and what has been done so the same kind of gap does not happen again?
Is the $6,102,696 a fixed number, or does it change if the rebuild finishes later or costs more?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Note 3, Prior Period Adjustment: "During the year, the Municipality identified that a financial liability related to the East Nipissing District Home for the Aged redevelopment commitment should have been recognized in prior periods." For 2024: Municipal debt as previously stated $6,864,846, adjustment $5,839,887, restated $12,704,733. Accumulated surplus as previously stated 25,263,318, adjustment (5,839,887), restated 19,423,431.
Note 10, Municipal Debt: "East Nipissing District Home for the Aged redevelopment commitment (i)" 6,102,696 in 2025 and 5,839,887 in 2024. Total municipal debt $15,862,014 (2024: $12,704,733). The note says the Municipality will pay its share of interest during construction and of principal and interest after, and that the present value of the expected payments is $6,102,696.
Note 20, Guarantor: the total construction cost of $57,695,599 is financed by Ontario Infrastructure and Lands Corporation. If the Board of Management for the District of Nipissing East fails to pay, the nine participating municipalities are each responsible up to their share. "The Municipality's guaranteed proportion of this debt is $4,298,322 (7.45%)."
As first published, the 2024 statements showed "Accumulated surplus, end of year" of $25,263,318, and the same guarantee note ($4,298,322) was already printed.
$3,250,000municipal debt issued in 2025, against $190,000 in the budget reconciliation
The 2025 cash flow statement shows $3,250,000 of municipal debt issued. The budget reconciliation in the same statements lists "Municipal debt issued" of $190,000. Three new term loans, all ending in 2030, carry interest of 4.41%, 4.37% and 4.02%. The statements also show $1,540,000 held in guaranteed investment certificates (a bank savings product that pays a fixed rate) earning 2.50% to 2.80%. Cash at the start of 2025 was $185,706, and $600,000 of short-term borrowing was repaid during the year.
Why it matters
Borrowing at about 4% while holding savings that earn about 2.5% costs a little each year. It can also be sensible, for example when a lender requires the money to be taken up before it is spent. The size of the gap between the budget and the real loans is what stands out, and the budget the Municipality adopted is not posted.
It could be because…
Council may have approved extra borrowing by a separate by-law after the budget was set, for projects such as roads or the fire hall land bought in 2025.
The loans may have been taken to repay the $600,000 short-term borrowing and to keep cash on hand while the roads and building projects were paid for over the next year.
A lender may need the money to be borrowed at one time, with the unspent part held in short-term certificates until it is used.
Questions you could ask
Which projects were the three 2030 term loans taken for, and when did Council approve them?
Why were $1,540,000 of the borrowed funds held in certificates at lower rates than the loans cost?
Is the adopted 2025 budget available to the public?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Statement of Cash Flows 2025: "Municipal debt issued" 3,250,000 (2024: -). "Temporary borrowings repaid" (600,000). "Municipal debt repaid" (355,528). "Acquisition of other investments" (1,514,000). "Cash and cash equivalents, beginning of year" 185,706.
Note 10: a term loan at 4.41% maturing August 22, 2030 with a balance of 2,078,093; a term loan at 4.37% maturing August 22, 2030 with 486,626; a term loan at 4.02% maturing December 8, 2030 with 650,000. All three show no balance for 2024.
Note 5, Other Investments: Guaranteed Investment Certificates maturing January 30, 2026 to December 30, 2026, bearing interest ranging from 2.50% to 2.80%, $1,540,000 (2024: $26,000).
$495,146deficit before capital grants in 2025 (budget: $803,451)
Before capital grants, the statements show a deficit (spending more than revenue) in each of the last three years: $15,535 in 2023, $640,879 in 2024 and $495,146 in 2025. Each year ends in a surplus only because government grants for building projects are added below that line: $548,183 from the province and $425,409 from the federal government in 2025. The Municipality's own budget for 2025 also planned a deficit before these grants, of $803,451. Part of the deficit is amortization (the yearly wear on roads, buildings and equipment, which is a bookkeeping cost, not cash paid), at $1,571,913 in 2025.
Why it matters
Capital grants can only be spent on building and replacing things, not on running costs. If the cost of running the Municipality keeps growing and tax revenue does not, the gap has to be closed by higher taxes or fewer services, or by finding more grants.
It could be because…
The deficit is smaller than the $1,571,913 of amortization, and the Municipality also had $2,757,930 of cash from operations in 2025, so it is still bringing in more cash than it spends running things.
Budgets here are set for taxes to cover cash costs, not amortization, so a deficit on these statements is expected.
Spending was below budget in 2025 and taxation matched the budget closely, which suggests the plan was followed.
Questions you could ask
How does Council plan to pay for running costs as amortization and Cassellholme payments grow?
How much of the yearly tax increase over the last three years went to running costs, and how much to saving for replacements?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Statement of Operations 2025: "Annual deficit before other" budget (803,451), actual (495,146), 2024 actual (640,879). "Net taxation" budget 7,443,161, actual 7,445,552. "Total expenses" budget 10,713,008, actual 10,555,234. Grants related to capital, Provincial 548,183 and Federal 425,409 (2024: 937,672 and 1,028,719). "Annual surplus" 215,637.
Statement of Cash Flows 2025: "Amortization of tangible capital assets" 1,571,913. "Cash and cash equivalents provided by operating transactions" 2,757,930 (2024: 1,660,488).
A reserve is money a town sets aside for a later purpose. At the end of 2025 East Ferris's reserves total $1,479,907, spread over nine funds. The largest, for future capital (building and replacing things), holds $503,437. The "Fire and emergency services equipment" reserve holds $69,217. The Mayor's 2026 newsletter says land for a new fire hall was bought in 2025 and that design is the next step. The statements show net debt (what the Municipality owes less its financial assets) of $14,425,727 at the end of 2025.
Why it matters
Small reserves mean large one-time costs are usually paid by borrowing or by a tax increase in the same year. Residents deciding how much to pay for a building they will use for decades may want to know how it will be paid for.
It could be because…
Much of what a town owns is in roads, buildings and equipment (about $33.8 million) rather than cash, so low reserves do not mean low assets.
Grants may pay for a share of a fire hall, so reserves may not need to cover all of it.
The fire reserve grew in 2025 from nothing, so a plan to build it up may already exist.
Questions you could ask
What is the expected cost of the new fire hall, and how much of it does the Municipality expect grants and borrowing to cover?
Does Council have a target size for its reserves?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
Statement of Change in Net Debt: "Net debt, end of year" (14,425,727) in 2025 and (13,943,139) in 2024 (restated); "Acquisition of tangible capital assets" budget (1,993,550), actual (2,426,971).
"Planning will also move forward for the design of our new Fire Hall. Land for this facility was purchased in 2025, and the design phase is the next step."
October 5, 2026date of the auditor's report on the 2025 statements
The auditor's report is dated October 5, 2026 for the year ending December 31, 2025. The 2024 statements carry an auditor's report dated July 8, 2025. The 2023 statements, as posted, carry an auditor's report dated May 27, 2025, which is more than a year after that year ended. Dates this late mean residents had no audited picture of the Municipality's finances for most of each following year.
Why it matters
Audited statements are the check on whether a town's own numbers can be trusted. The sooner they are signed after year end, the more useful they are to voters and to Council while it is deciding a budget.
It could be because…
The 2025 statements had to be redone to add the Cassellholme debt, which could explain a later date.
The 2023 report date may be a printing error, because the same file is dated for the year before 2024's report. We cannot tell from the document.
A small municipality may have a hard time finding an auditor to start early.
Questions you could ask
When did Council receive and approve the audited 2025 statements?
Is the May 27, 2025 date on the 2023 report correct?
What is Council's target date for audited statements each year?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Independent Auditor's Report, North Bay, Ontario: "October 5, 2026". The management report is also dated October 5, 2026.
2021the only budget heading on the Budget page, with no document under it
The Municipality's Budget page says "Each year, Council approves a balanced budget" and explains the operating and capital budgets, but the only heading under it is "2021 Budget", with nothing inside. We did not find a 2025 or 2026 budget on the site. The Mayor's 2026 newsletter says "the Municipality's 2026 Budget is in the final stages of approval." Without the budget, the budget columns in the audited statements cannot be checked against what Council passed.
Why it matters
The budget is the promise to taxpayers about the year's spending. When it is not posted, residents cannot compare it with what happened, as the audited statements do each year.
It could be because…
The budget may be posted somewhere we did not look, such as in council agendas, which we could not find.
The page may simply not have been updated after the site was last redesigned.
Questions you could ask
Will the adopted 2025 and 2026 budgets be posted on the Budget page?
Does the Municipality publish the yearly statement of council pay and expenses?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Budget page: "Each year, Council approves a balanced budget that is split into two areas: operating and capital." The only collapsible section is headed "2021 Budget" and has no content.
No amount giventhe statements do not estimate the cost of the contaminated site
The 2025 statements list two possible costs that are not counted in the numbers. The Municipality says it has identified a possible liability for a contaminated site known as the St. Theresa School Site, and that it "is not possible at this time to determine the amount, if any." It also says it is involved in "certain legal matters and litigations" whose results cannot yet be known, and Council's view is that any liability is unlikely to be material.
Why it matters
A cleanup of contaminated land can run to a large sum, and the Municipality could be responsible for it. Residents are entitled to know how the Municipality would pay and whether anyone else shares the cost.
It could be because…
The site may never need cleanup, or the cost may fall on someone else.
Accounting rules say a cost is only counted once it can be estimated, so leaving it out is normal while studies continue.
Questions you could ask
What studies have been done at the site, and when are the results expected?
Could the Municipality or another party be required to pay for the cleanup?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Note 15, Contingencies: "The Municipality has identified a potential liability for a contaminated site known as the St. Theresa School Site. It is not possible at this time to determine the amount, if any, of any liability or remediation costs that may be required." Legal Matters: "The Municipality is involved in certain legal matters and litigations, the outcomes of which are not presently determinable."
$535,391landfill closure and care obligation at December 31, 2025
The Municipality records a $535,391 obligation to close and care for its landfill (a rubbish dump) after it is full. It estimates 65% of capacity remains (226,000 m3) and about 58 years of life. The notes say the most recent waste capacity study for the landfill site was performed in a report dated February 2014.
Why it matters
The closing cost and the date the dump is full both depend on how much space is left. A twelve-year-old study may not match how much is actually being dumped now.
It could be because…
The Municipality may update the estimate each year from its own records of what goes in, even if the full study is old.
The landfill is small and slow to fill, so a newer study may not change the answer much.
Questions you could ask
When will the landfill's capacity be studied again?
What is the estimated closing cost in today's dollars?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for East Ferris?Send us your answer and we will publish it with this question.
The evidence
Note 12, Asset Retirement Obligations: Landfill 535,391 (2024: 595,907). "The most recent waste capacity study for the landfill site was performed in a report dated February 2014." East Ferris 2025: 65% (226,000 m3), 58 years, 25 years post-closure care.
Can we count your visit? With your OK, we use Google Analytics to see which pages help people. It sets cookies and sends visit data to Google. Nothing loads unless you say yes. Privacy