Council BooksEdwardsburgh-CardinalOntarioSign inSubscribe
Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you
Read by hand. We read Edwardsburgh-Cardinal's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.

The money · 2024

How Edwardsburgh-Cardinal's money works

A town is a bit like a household. Money comes in (mostly taxes and grants), and money goes out to pay for services like roads, fire trucks and the arena. Here is what that looked like in 2024, the latest year the town has reported to the Province.

Why 2024 and not this year? A budget is a plan. These figures are what actually happened, checked by an auditor and reported to Ontario. The 2025 report is not out yet.

Money in: $25.7M

Where the town's money came from in 2024.

Edwardsburgh-Cardinal revenue by source, 2024
  • Property taxes$7.1M28%
  • Grants for specific projects$1.5M6%
  • Fees people pay$14.7M57%
  • Other$1.3M5%
  • Everything else$1.1M4%
Show as a table
CategoryAmountShare
Property taxes$7,108,48927.7%
Grants for specific projects$1,544,0966.0%
Fees people pay$14,663,81557.1%
Other$1,296,1305.0%
Everything else$1,065,6174.1%
Total$25,678,147100%

What each source means

Property taxes
What home and business owners pay each year, based on what their property is worth.
Grants for specific projects
Money from Ontario or Canada that must be spent on a certain thing, often a road or building.
Fees people pay
Water and sewer bills, dump fees, arena rentals, permits and similar charges.
Other
Interest earned, donations, sales of land and equipment.

Money out: $16.1M on services

Day-to-day spending in 2024, by service. On top of this, the town recorded $3.6M of "wear and tear" on things it owns. That is an accounting cost, not cash out the door, so it is left out here.

Edwardsburgh-Cardinal spending by service, 2024
  • Running the town office$1.7M15%
  • Police, fire and safety$2.2M19%
  • Roads and snow$2.4M21%
  • Water, sewers and garbage$2.4M22%
  • Parks, arena and library$2.4M21%
  • Planning and business$253K2%
Show as a table
CategoryAmountShare
Running the town office$1,672,07714.7%
Police, fire and safety$2,171,69219.1%
Roads and snow$2,397,95621.1%
Water, sewers and garbage$2,444,76521.6%
Parks, arena and library$2,402,92721.2%
Planning and business$253,0612.2%
Total$11,342,478100%

Water, sewers and garbage

$2.4M

Clean tap water, the sewer system, garbage pickup, the dump and recycling.

+32% since 2019 (prices rose 18%)

Water, sewers and garbage broken down
  1. Sewer pipes$596K+416%

    The pipes that carry sewage away from homes.

  2. Water treatment$539K+17%

    Making lake or well water safe to drink.

  3. Garbage pickup$412K+17%

    Trucks that collect garbage.

  4. Sewage treatment$306K−44%

    Cleaning sewage before it goes back into nature (Tweed uses lagoons).

  5. Water pipes$257K+77%

    The pipes that bring water to homes.

  6. The dump (landfill)$181K0%

    Running the landfill, and saving up to close it safely one day.

  7. Storm drains$154K+151%

    Drains that carry away rain water.

Show as a table
ItemAmountChange
Sewer pipes$596,167+416.3%
Water treatment$538,912+17.2%
Garbage pickup$412,261+17.1%
Sewage treatment$306,315−43.7%
Water pipes$256,595+77.4%
The dump (landfill)$180,934−0.3%
Storm drains$153,581+150.8%

Parks, arena and library

$2.4M

Parks, the arena, the pool, sports fields, programs and the library.

+27% since 2019 (prices rose 18%)

Parks, arena and library broken down
  1. Arena and buildings$1.7M+37%

    The arena, pool, community centre and halls.

  2. Programs$307K−14%

    Classes, camps and activities.

  3. Parks$242K+33%

    Parks, beaches, trails and green spaces.

  4. Library$186K+43%

    The public library.

Show as a table
ItemAmountChange
Arena and buildings$1,668,268+36.5%
Programs$307,079−13.7%
Parks$241,929+32.6%
Library$185,651+43.5%

Roads and snow

$2.4M

Fixing and paving roads, bridges and culverts, ploughing snow, and street lights.

+30% since 2019 (prices rose 18%)

Roads and snow broken down
  1. Paved roads$912K+62%

    Fixing and repaving paved roads.

  2. Gravel roads$591K+11%

    Grading and fixing gravel roads.

  3. Snow ploughing$482K−11%

    Ploughing, salting and sanding roads in winter.

  4. Roadsides and signs$234K+149%

    Ditches, signs, line painting and roadside brush.

  5. Bridges and culverts$144K+69%

    Keeping bridges and the pipes under roads safe.

  6. Street lights$34,347−1%

    Power and repairs for street lights.

  7. Sidewalk snow$534

    Clearing sidewalks and parking lots.

Show as a table
ItemAmountChange
Paved roads$912,485+61.7%
Gravel roads$590,616+11.2%
Snow ploughing$482,087−10.9%
Roadsides and signs$234,011+149.4%
Bridges and culverts$143,876+69.1%
Street lights$34,347−0.5%
Sidewalk snow$534–

Police, fire and safety

$2.2M

Paying for police, the fire department, building inspectors and by-law officers.

+15% since 2019 (prices rose 18%)

Police, fire and safety broken down
  1. Police (OPP contract)$1.2M+1%

    What the town pays for policing.

  2. Fire department$685K+29%

    Firefighters, trucks and fire halls.

  3. Building permits$201K+84%

    Checking that new buildings are safe.

  4. Conservation authority$62,104+32%

    A regional group that manages rivers, flooding and wetlands.

  5. By-law and animal control$58,673+36%

    Enforcing town rules, like noise, parking and dogs.

  6. Emergency planning$2,280

    Getting ready for floods, storms and other emergencies.

Show as a table
ItemAmountChange
Police (OPP contract)$1,162,952+0.5%
Fire department$684,891+29.2%
Building permits$200,792+84.4%
Conservation authority$62,104+32.5%
By-law and animal control$58,673+36.0%
Emergency planning$2,280–

Running the town office

$1.7M

Council, managers, the clerk, accounting, computers, insurance and the town hall itself. Every town needs some of this, but it does not fix a road or put out a fire.

+53% since 2019 (prices rose 18%)

Running the town office broken down
  1. Senior management$1.5M+55%

    The top managers who run the town day to day.

  2. Council$140K+41%

    Pay and expenses for the mayor and councillors, and council meetings.

Show as a table
ItemAmountChange
Senior management$1,532,189+54.6%
Council$139,888+40.8%

Planning and business

$253K

Deciding what can be built where, and trying to bring businesses and visitors to town.

+43% since 2019 (prices rose 18%)

Planning and business broken down
  1. Planning and zoning$236K+376%

    Deciding what can be built where.

  2. Farms and forests$16,932

    Programs for farms and forests.

Show as a table
ItemAmountChange
Planning and zoning$236,129+375.7%
Farms and forests$16,932–

What the money bought

The same 2024 spending, sorted by what it paid for rather than which service.

Spending by type
  1. Staff pay and benefits$7.6M

    Wages, benefits and pensions for town workers.

  2. Supplies and utilities$4.7M

    Gravel, salt, fuel, electricity, heating, office supplies and repairs.

  3. Outside companies$2.8M

    Work the town pays other companies to do, like policing, paving or consultants.

  4. Rent and money costs$806K

    Renting equipment or space, bank fees, and some accounting costs.

  5. Interest on loans$316K

    The extra money paid to lenders for money the town borrowed.

Show as a table
ItemAmount
Staff pay and benefits$7,551,707
Supplies and utilities$4,701,361
Outside companies$2,757,487
Rent and money costs$806,151
Interest on loans$316,212

Staff

People on the town's payroll at the end of each year, as reported to the Province.

YearFull-timePart-timeSeasonal
201931177
202031177
202132167
2022331618
2023331618
2024341546

How things have changed since 2019

Money in compared with day-to-day spending, each year. When the orange line is above the blue one, the town spent more than it took in and made up the difference from savings or loans. Grants for big projects arrive in some years and not others, which makes "money in" jump around. In 2024, the town recorded an unusually large accounting entry for wear and tear (mostly for the landfill), so day-to-day spending looks lower that year than it really was.

Money in and day-to-day spending by year
$25.7M
Show as a table
YearMoney inDay-to-day spending
2019$15.3M$8.8M
2020$14.9M$8.6M
2021$15.1M$8.6M
2022$16.5M$9.5M
2023$21.3M$11.8M
2024$25.7M$16.1M

Town property tax

Up 23% since 2019. Prices rose 18%.

Town property tax by year
$7.1M
Show as a table
YearTown property tax
2019$5.8M
2020$6.1M
2021$6.2M
2022$6.5M
2023$6.8M
2024$7.1M

Savings (reserves)

Money set aside for repairs, equipment and emergencies.

Reserves by year
$6.5M
Show as a table
YearSavings
2019$7.3M
2020$7.9M
2021$9.2M
2022$9.9M
2023$9.0M
2024$6.5M

What the town owes

Long-term loans plus short-term (temporary) loans at year end.

Debt by year
$9.1M
Show as a table
YearLong-term loansTemporary loans
2019$5.8M$0
2020$5.6M$0
2021$5.7M$0
2022$6.5M$0
2023$6.2M$0
2024$9.1M$0

Building new things

Spending on new or rebuilt roads, pipes, buildings and equipment, compared with how fast existing ones wear out.

Capital spending and wear by year
$12.3M
Show as a table
YearBuilt or boughtWore out (amortization)
2019$2.5M$1.7M
2020$1.7M$1.8M
2021$1.5M$1.7M
2022$4.0M$1.7M
2023$5.2M$1.7M
2024$12.3M$3.6M

Source: Ontario Financial Information Return (FIR), Schedules 10, 40, 51, 60, 70, 74 and 80 (archived copy). Ontario Ministry of Municipal Affairs and Housing. Retrieved 2026-10-01. Figures are what the municipality reported to the Province for each year, prepared on the same basis as its audited financial statements.