Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read Greater Madawaska's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
Questions · 10 so far
Things worth asking about
We read Greater Madawaska's financial reports and meeting minutes, and compared its numbers with 28 similar Ontario towns. These are the things that stood out.
What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer
Needs an answer
These are unusual enough that residents deserve a clear answer from council.
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Greater Madawaska had $1.7M saved at the end of 2025, down from $2.0M in 2019. That is 26% of one year's spending. Only 2 of 28 similar towns had less, compared with what they spend.
Found automatically from the town's financial reports · 2 sources
Worth asking
Worth asking
There may well be a good reason. It is still worth asking what it is.
$4,719,601long-term debt at December 31, 2025, up from $3,332,861 a year earlier
Long-term debt is money the Township has borrowed and is paying back over many years. It stood at $3,332,861 at the end of 2024 and $4,719,601 at the end of 2025, after two new 20-year loans. The Township's 2026 budget sets aside $728,173 for debt payments. In answers to a candidate it published a list of possible new borrowing, including $3.05M in 2030 and $3.28M in 2031, and says these are planning assumptions, not approved debt. The increase we quote ($1,386,740) is worked out by us from the two year-end balances.
Found by reading the town's own documents · 4 sources
$1,533,868yearly funding gap in the Asset Management Plan
The Township's Asset Management Plan says it needs about $2,300,503 a year to replace its roads, buildings, vehicles and equipment as they wear out, and is setting aside about $766,635, a gap of $1,533,868. Its answer is to raise taxes about 3% a year for ten years for this purpose. In September 2026 the Treasurer told Council that the cost pressures she listed for 2027 would, on their own, mean a 9.48% rise, and that staff would work to bring it to a target of 4.72% to 5.32%.
Found by reading the town's own documents · 4 sources
$274,523drop in reserves and reserve funds in 2025, to $1,661,185
Reserves are savings set aside for later costs. The audited statements show them falling from $1,935,708 to $1,661,185 in 2025, because $889,456 was moved out to buy capital assets. Separately, the Township's election page gives a different total for each year: $2,083,876 for 2024 and $1,752,968 for 2025. By our working, each difference is within $2 of the balance of obligatory reserve funds in note 7 of the statements ($148,169 and $91,785). The 2023 totals in the two places match, so the two lists may count different things in different years. We do not know the Township's reason.
Found by reading the town's own documents · 3 sources
$970,239land added to the Township's assets in 2025, which the Township links in part to the Peaks Village lots
The Township says that a developer did not finish the Peaks Village subdivision, so it took eight lots that had been given as security and recorded them as land it owns. Land additions in the 2025 statements were $970,239. The Township says this was not money spent and that it also produced extra accounting revenue, but its answers do not give the value of the lots or say how it was set. The 2027 capital list the Treasurer showed Council on September 17, 2026 has a new line, "Peaks Village", for $330,000.
Found by reading the town's own documents · 3 sources
Greater Madawaska spent $405K on parks, arena and library in 2019 and $795K in 2025. Prices only went up about 21% in that time. Only 5 of 28 similar towns had faster growth here.
Found automatically from the town's financial reports · 3 sources
$7,622,505actual 2025 expenses in the audited statements, against a budget column of $5,858,750
The 2025 statements show expenses of $7,622,505 against a budget column of $5,858,750. The statements' budget column shows no amortization (the yearly wear-and-tear charge on assets, which is an accounting entry, not a payment), while actual amortization was $1,337,317. The Township says the gap should not be called an overrun. By our working, amortization explains about $1.34 million of the roughly $1.76 million gap, and revenue was also higher than budget by more than $1.3 million, partly because of the Peaks Village lots. The Township does not publish a line-by-line list showing the rest.
Found by reading the town's own documents · 3 sources
$1,259,775estimated landfill closure and post-closure liability, against a $340,000 reserve
A landfill has to be capped and watched for years after it closes. The statements count the expected cost, in today's money, at $1,259,775. The reserve set aside for it is $340,000. By our working the difference is $919,775. The statements call it an amount "to be recovered" from taxpayers in later years.
Found by reading the town's own documents · 2 sources
2 claimsdisclosed in the audited 2025 statements, outcomes not known
The 2025 statements say the Township has been named in two claims and the outcomes cannot be known yet. The Township told a candidate that both are being handled through its insurance and its own cost would generally be limited to the deductible, and that it can say no more while they are ongoing.
Found by reading the town's own documents · 2 sources
$122,407moved to a reserve in 2025 from the policing budget, according to the Township
The 2025 budget set aside $863,385 for policing. Actual OPP costs were $730,596 and the new police board cost $19,097. The Township says the Province gave temporary relief on OPP bills, so Council moved the $122,407 difference into a reserve for future policing increases. The reserve schedule shows that reserve rising from $200,000 to $322,407. The Township has explained this. What remains open is how that reserve will be used.
Found by reading the town's own documents · 2 sources
Each question in full
Needs an answerFound automatically from financial reports
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Greater Madawaska had $1.7M saved at the end of 2025, down from $2.0M in 2019. That is 26% of one year's spending. Only 2 of 28 similar towns had less, compared with what they spend.
Does Greater Madawaska have enough saved for repairs and emergencies?
$0$1.0M$2.0M$3.0M
$1.7M
2019202020212022202320242025
Show as a table
Year
Savings (reserves)
2019
$2.0M
2020
$2.6M
2021
$2.3M
2022
$1.9M
2023
$1.6M
2024
$1.9M
2025
$1.7M
Why it matters
With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.
It could be because…
The town spent savings on purpose, on projects that were planned and saved up for.
Some savings were used to match grant money, which brings in more than it costs.
The town has a plan to rebuild its savings.
Questions you could ask
Does the town have a written reserve policy with a target amount?
What were the savings spent on between 2019 and 2025?
What is the plan to rebuild them, and by when?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
$4,719,601long-term debt at December 31, 2025, up from $3,332,861 a year earlier
Long-term debt is money the Township has borrowed and is paying back over many years. It stood at $3,332,861 at the end of 2024 and $4,719,601 at the end of 2025, after two new 20-year loans. The Township's 2026 budget sets aside $728,173 for debt payments. In answers to a candidate it published a list of possible new borrowing, including $3.05M in 2030 and $3.28M in 2031, and says these are planning assumptions, not approved debt. The increase we quote ($1,386,740) is worked out by us from the two year-end balances.
Why it matters
Debt payments come out of the property tax every year before anything else. The more is borrowed now, the less room there is later.
It could be because…
Roads, fire trucks and buildings last for decades, so spreading their cost over 20 years is a normal way to pay for them.
The statements say all the loans have fixed interest rates and the payments are within the Province's yearly repayment limit.
The Township says it adopted its first Debt Management Policy in 2025, with a conservative target for how much of its own revenue goes to debt payments.
Questions you could ask
What share of own-source revenue will debt payments take each year from 2026 to 2030, under the planned borrowing?
Which projects does the $3.05M planned for 2030 pay for?
Will the Debt Management Policy be posted where residents can read it?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
The evidence
Note 5: "The balance of long-term debt of $4,719,601 (2024 - $3,332,861)". Two debentures are new in 2025: "interest at 4.40%, $20,657 plus interest payable semi-annually, maturing July 2045" ($826,261) and "interest at 4.38%, $25,808 ... maturing March 2046" ($1,032,315). Payments due in 2026: principal $529,739, interest $195,678, total $725,417. Note 6: "These payments are within the annual debt repayment limit as prescribed by the Ministry of Municipal Affairs and Housing under Ontario Regulation 403/02."
Question 27 (what long-term debt will be at December 31, 2026): the Township lists "potential new borrowing", with "Potential New Debt" of $3.05M in 2030 and $3.28M in 2031, and says "These amounts are long-term planning assumptions, not approved or issued debt." It also says its Debt Management Policy sets "a conservative internal debt-servicing target of approximately 15% of own-source revenues".
$1,533,868yearly funding gap in the Asset Management Plan
The Township's Asset Management Plan says it needs about $2,300,503 a year to replace its roads, buildings, vehicles and equipment as they wear out, and is setting aside about $766,635, a gap of $1,533,868. Its answer is to raise taxes about 3% a year for ten years for this purpose. In September 2026 the Treasurer told Council that the cost pressures she listed for 2027 would, on their own, mean a 9.48% rise, and that staff would work to bring it to a target of 4.72% to 5.32%.
Why it matters
Residents pay for the gap in one of two ways: higher taxes now, or worn-out roads and buildings later. The plan only works if the tax increase it assumes can actually be held.
It could be because…
The plan is a snapshot and says it is based on the best data available. Grants, savings and growth in the tax base can narrow the gap.
The 9.48% is a total of selected pressures before staff look for savings. The Directive says it does not show the whole budget.
Contributions to reserves are already rising, which is what the plan asks for.
Questions you could ask
If the 2027 increase lands above 5.32%, which part of the 10-year plan gives way: the reserve contributions, the road work or the debt target?
How much of the $766,635 counted as yearly funding depends on grants that could end?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
The evidence
"The average annual investment requirement for the above categories is $2,300,503. Annual revenue currently allocated to these assets for capital purposes is $766,635, leaving an annual deficit of $1,533,868." The same page says these assets "are currently funded at 33.3% of their long-term requirements." The funding counted includes OCIF of 100,000, which the plan says "may be discontinued in future years" (page 97).
"Key Pressures alone result in a 9.48% tax rate increase. However, the budget directive will aim to have staff will work to bring this down to the targeted 4.72% to 5.32% through finding revenue sources and cost saving efficiencies." Contribution to Reserves: $148,680, 28.6%. The slide adds that these pressures "do not represent the total change to the municipal budget."
$274,523drop in reserves and reserve funds in 2025, to $1,661,185
Reserves are savings set aside for later costs. The audited statements show them falling from $1,935,708 to $1,661,185 in 2025, because $889,456 was moved out to buy capital assets. Separately, the Township's election page gives a different total for each year: $2,083,876 for 2024 and $1,752,968 for 2025. By our working, each difference is within $2 of the balance of obligatory reserve funds in note 7 of the statements ($148,169 and $91,785). The 2023 totals in the two places match, so the two lists may count different things in different years. We do not know the Township's reason.
Why it matters
Reserves are what the Township would use first for a big repair or a lawsuit. Two different totals for the same date make it hard to tell how much is really set aside.
It could be because…
Reserves exist to be spent. The money moved to capital paid for roads and equipment that are now assets.
The Township's list may include reserve funds that the audited schedule leaves out, as the matching balances suggest.
The Township says contributions to reserves are rising in the budget.
Questions you could ask
Which reserve total should residents use, and which funds does each one count?
What is the plan for rebuilding the capital works reserve after the 2025 drawdown?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
The evidence
Schedule of reserves and reserve funds, 2025: "To tangible capital acquisitions" 889,456 (2024: 14,795); "Changes in reserves and reserve funds balance" (274,523); "Reserves and reserve funds at end of year" $1,661,185, against $1,935,708 the year before. "Capital works" 494,567 (2024: 647,732). "Total reserves" $1,661,185.
$970,239land added to the Township's assets in 2025, which the Township links in part to the Peaks Village lots
The Township says that a developer did not finish the Peaks Village subdivision, so it took eight lots that had been given as security and recorded them as land it owns. Land additions in the 2025 statements were $970,239. The Township says this was not money spent and that it also produced extra accounting revenue, but its answers do not give the value of the lots or say how it was set. The 2027 capital list the Treasurer showed Council on September 17, 2026 has a new line, "Peaks Village", for $330,000.
Why it matters
A land value on the books can look like money in the bank without being cash. Residents should know what the lots are worth, and whether finishing the roads will fall on taxpayers or on the security the Township holds.
It could be because…
Accounting rules require land received this way to be recorded at its value, and the value can be well above what the Township paid, which was nothing.
The $330,000 may be paid for by other security the Township holds or by selling the lots.
The Township says its Council authorized the other land purchase in Calabogie by resolution.
Questions you could ask
What value was recorded for the eight lots, and how was it set?
What does the $330,000 pay for, and how much of it comes from the security the Township holds?
Does the Township plan to sell the lots, and where would the money go?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
Schedule of tangible capital assets, 2025, column "Land": additions 970,239; balance at end of year 1,567,740, against 597,501 at the start of the year.
Question 14: the land purchase "relates to the Peaks Village subdivision and the purchase of land for future community services". The developer "did not complete the subdivision" and the Township "took ownership of eight (8) subdivision lots provided as security". "An asset addition is not necessarily an expenditure." Question 15 says miscellaneous income "over budget by some $1.1M" is explained by recognizing the Peaks Village lands. The page does not give the value of the lots or how it was set.
Greater Madawaska spent $405K on parks, arena and library in 2019 and $795K in 2025. Prices only went up about 21% in that time. Only 5 of 28 similar towns had faster growth here.
Why did the cost of parks, arena and library grow 96% in 6 years?
Parks, arena and library
Prices (inflation)
−20%+0%+20%+40%+60%+80%+100%
+96%
2019202020212022202320242025
Show as a table
Year
Parks, arena and library
Prices (inflation)
2019
+0%
+0%
2020
−16%
+1%
2021
−13%
+4%
2022
+18%
+11%
2023
+49%
+16%
2024
+68%
+18%
2025
+96%
+21%
Change since the first year shown. The grey line is how much prices rose overall, for comparison.
Why it matters
When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.
It could be because…
The town added a service, a building or staff that residents asked for.
Costs were moved from another area, so the total did not really change.
Accounting rules changed how costs are sorted.
Large one-time costs, like a study, lawsuit or repair, landed in one year.
Questions you could ask
What did the extra $389K a year pay for?
Why did arena and buildings go from $270K to $477K?
Was each increase approved by council as a separate decision, or did it happen through the yearly budget?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
$7,622,505actual 2025 expenses in the audited statements, against a budget column of $5,858,750
The 2025 statements show expenses of $7,622,505 against a budget column of $5,858,750. The statements' budget column shows no amortization (the yearly wear-and-tear charge on assets, which is an accounting entry, not a payment), while actual amortization was $1,337,317. The Township says the gap should not be called an overrun. By our working, amortization explains about $1.34 million of the roughly $1.76 million gap, and revenue was also higher than budget by more than $1.3 million, partly because of the Peaks Village lots. The Township does not publish a line-by-line list showing the rest.
Why it matters
People who compare the budget with the audited results will see a large gap. A published bridge between the two would show that it is accounting and not overspending.
It could be because…
The Township says its budget leaves out amortization, debt payments and transfers to reserves, which the statements treat differently.
The statements say the budget figures are unaudited and were reclassified to fit accounting standards.
Some expenses may have been paid by grants or by contributions that also raised revenue.
Questions you could ask
Will the Township publish a table that turns each budget line into its audited result, with the amortization and other accounting items shown separately?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
Statement of operations, 2025: "Annual surplus" budget $1,155,604, actual $737,802. Total expenses budget 5,858,750, actual 7,622,505. Total revenue budget 7,014,354, actual 8,360,307.
Statement of changes in net debt: "Amortization of tangible capital assets" budget "-", actual 1,337,317 (2024: 1,267,935). Note 11: "The budgeted figures are unaudited."
Question 13: "These amounts should not be characterized as 'overruns.' They reflect reporting methods prescribed by Public Sector Accounting Standards (PSAS)." The answer for the "$1.76M Operating Costs Variance" lists amortization, changes in tangible capital assets, deferred revenue, debt payments and contributions to reserves, with no amounts.
$1,259,775estimated landfill closure and post-closure liability, against a $340,000 reserve
A landfill has to be capped and watched for years after it closes. The statements count the expected cost, in today's money, at $1,259,775. The reserve set aside for it is $340,000. By our working the difference is $919,775. The statements call it an amount "to be recovered" from taxpayers in later years.
Why it matters
If the cost is not saved for as it builds, future taxpayers pay it all at once or the Township borrows.
It could be because…
The cost falls over a long time. The statements give the remaining life of the sites as 33 years and care after closing as 25 years.
The statements say some closure costs are paid each year through the operating budget.
The number is an estimate and falls as the discount rate and cost estimates change. It fell from $1,296,975 in 2024.
Questions you could ask
Does the Township plan to add to the $340,000 post-closure reserve each year?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
The evidence
Note 9: "The estimated total liability of $1,259,775 (2024 - 1,296,975)". "There is currently $340,000 in reserves set aside for either closure or post closure activities." "Landfill sites' remaining useful life in years 33"; "Expected years of post-closure care 25". "Some closure costs are incurred on an ongoing basis and are included in the yearly fiscal operating budget."
Note 2: "Amounts to be recovered represent the requirement of the Township to raise funds in subsequent periods to finance unfunded liabilities", including "the ARO for the landfill closure and post closure costs $1,259,775".
2 claimsdisclosed in the audited 2025 statements, outcomes not known
The 2025 statements say the Township has been named in two claims and the outcomes cannot be known yet. The Township told a candidate that both are being handled through its insurance and its own cost would generally be limited to the deductible, and that it can say no more while they are ongoing.
Why it matters
An open claim can turn into a cost. The Township has said what it can, and residents may still want to know how big the deductible is.
It could be because…
Claims against a municipality are common and are usually passed to its insurer.
The Township may be barred from sharing details while the matters are before the courts.
Questions you could ask
What is the insurance deductible for each claim, and will the Township report the outcome when they close?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
The evidence
Note 10: "The Township of Greater Madawaska is aware of two claims as at December 31, 2025, for which they have been named the defendant. The outcomes are not determinable as at the financial reporting date."
Question 17: "both matters are being handled through the Township's insurance coverage. The Township's direct financial cost would generally be limited to the applicable insurance deductible." "As these matters remain ongoing, the Township is limited in the details it can publicly provide."
$122,407moved to a reserve in 2025 from the policing budget, according to the Township
The 2025 budget set aside $863,385 for policing. Actual OPP costs were $730,596 and the new police board cost $19,097. The Township says the Province gave temporary relief on OPP bills, so Council moved the $122,407 difference into a reserve for future policing increases. The reserve schedule shows that reserve rising from $200,000 to $322,407. The Township has explained this. What remains open is how that reserve will be used.
Why it matters
Money collected in tax for one purpose and held in reserve for another is a normal tool, but residents should know when it is being done and what it is for.
It could be because…
The OPP billing was not final when the budget was set, and the Province later gave relief.
The Township says the relief was temporary, so keeping the money guards against a later bill.
Questions you could ask
Under what rules can the contingency reserve be drawn on, and will Council be told when it is?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Greater Madawaska?Send us your answer and we will publish it with this question.
The evidence
Question 16: the 2025 budget "included $863,385 for Police Services"; the $122,407 "difference was transferred to the General Operating Contingency Reserve/Levy Stabilization to help with future policing cost increases"; "the reserve increased from $200,000 to $322,407".
Note 14: the OPP cost for 2025 "was $730,596 (2024 - $710,871)"; Police Services Board costs "The cost for 2025 was $19,097 (2024 - $nil)". Schedule of reserves: "General operating contingency" 322,407 (2024: 200,000).