Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read Hearst's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
Questions · 12 so far
Things worth asking about
We read Hearst's financial reports and meeting minutes, and compared its numbers with 21 similar Ontario towns. These are the things that stood out.
What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer
Needs an answer
These are unusual enough that residents deserve a clear answer from council.
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Hearst had $3.2M saved at the end of 2024, down from $4.8M in 2019. That is 13% of one year's spending. None of the 21 similar towns had less, compared with what they spend.
Found automatically from the town's financial reports · 2 sources
Worth asking
Worth asking
There may well be a good reason. It is still worth asking what it is.
2022the latest year of audited statements we found on the Town's Finance page
Audited statements are the yearly accounts that an outside accounting firm has checked. On the Finance page of the Town's website, the only statements we found are for 2022, and the auditor's report on them is dated September 19, 2023. We did not find later years. The 2026 budget does print 2023 and 2024 'actual' numbers and 2025 numbers marked 'unaudited', so the Town is tracking its results. The open question is whether the checked statements for those years are public.
Found by reading the town's own documents · 3 sources
$401,500interest from Hearst Connect budgeted for 2026, against $52,500 received in 2024
The Town owns Hearst Connect Corporation, a company that sells internet and telephone service. At the end of 2022 the Town's statements show a long-term receivable (money owed to the Town) of $3,900,000 from Hearst Connect, and the company's own condensed results show a net deficit of $(12,655) with net income of $398,142 for the year. The Town's budget line 'INTEREST - Hearst Connect' was $45,000 in 2023 and $52,500 in 2024, was budgeted at $200,500 for 2025, and is budgeted at $401,500 for 2026. The budget's summary page says only that income from 'Government Business Enterprises' goes from $294,500 to $480,000.
Found by reading the town's own documents · 3 sources
$454,301bank interest in 2025 (unaudited), against a budget of $308,800
The Town earned $690,378 in interest on its bank accounts in 2023 and $649,059 in 2024. The 2025 budget expected $308,800 and the 2025 unaudited result is $454,301, which is $145,501 more than budgeted (worked out by us). The 2026 budget expects $313,300. A budget set below what usually arrives leaves room for a surplus, which can then be spent on something else.
Found by reading the town's own documents · 3 sources
$320,089non-routine commercial and industrial spending over 2023 to 2025, with no budget (worked out by us)
The 'Com. & Ind. - Non-routine expenses' line had a budget of 0 for 2025 and no budget behind it in the earlier years either. Spending on it was $47,242 in 2023, $169,789 in 2024 and $103,058 in 2025 (unaudited), which adds to $320,089 (worked out by us). The whole commercial and industrial section had a 2025 budget of $58,900 and a 2025 result of $141,732. Separately, the department's net cost in the 2026 budget rises 95%, from $159,500 to $311,100.
Found by reading the town's own documents · 2 sources
$502,788spent on waste supplies and services in 2022, against a budget of $254,800
In 2022 the Town budgeted $254,800 for supplies and services in waste collection, disposal and recycling, and spent $502,788. The statements give part of the answer. The Town's landfill closure and clean-up liability (money it must set aside for closing the landfill one day) rose from $483,000 to $686,000 in 2022, and the cash flow statement shows a change of $203,000. The 2026 budget includes $105,000 to start an environmental assessment for the landfill.
Found by reading the town's own documents · 3 sources
$300,000a year estimated for repaying the recreation centre reserve, in year 4 of 15
A reserve is a savings account a town sets aside for a purpose. The 2026 budget says Council passed a resolution to repay the reserve used for the recreation centre rehabilitation. The estimate is $300,000 a year over 15 years, and the Town is in year 4. That is about $4.5 million in total (worked out by us), but the budget says the amount will be recalculated when the project is finished. The 2022 statements list commitments of $4,959,650 for recreation in 2023.
Found by reading the town's own documents · 2 sources
$1,569,252CWELCC grant received in 2025 (unaudited), against a budget of $407,500
In the 2025 budget, the child care centre's 'Operating Grant' was $1,200,400 and its 'CWELCC' grant was $407,500. The 2025 unaudited results show the reverse: $51,240 and $1,569,252. Together the lines are $1,607,900 budgeted and $1,620,492 received (worked out by us), so the total is close. The 2026 budget has $52,000 and $1,917,200, matching the new pattern.
Found by reading the town's own documents · 1 source
$269,900total 2026 budget for Members of Council, down 2% from 2025
Ontario towns must publish a yearly statement of what each member of council was paid and what expenses were repaid. We did not find one on the Finance page, the council page or the budget documents we read. The 2026 budget gives one total for the cost of Council: $269,900, down 2% from $274,600 in 2025.
Found by reading the town's own documents · 1 source
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Hearst had $3.2M saved at the end of 2024, down from $4.8M in 2019. That is 13% of one year's spending. None of the 21 similar towns had less, compared with what they spend.
Does Hearst have enough saved for repairs and emergencies?
$0$2.0M$4.0M$6.0M
$3.2M
201920202021202220232024
Show as a table
Year
Savings (reserves)
2019
$4.8M
2020
$5.1M
2021
$5.4M
2022
$4.3M
2023
$2.3M
2024
$3.2M
Why it matters
With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.
It could be because…
The town spent savings on purpose, on projects that were planned and saved up for.
Some savings were used to match grant money, which brings in more than it costs.
The town has a plan to rebuild its savings.
Questions you could ask
Does the town have a written reserve policy with a target amount?
What were the savings spent on between 2019 and 2024?
What is the plan to rebuild them, and by when?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
2022the latest year of audited statements we found on the Town's Finance page
Audited statements are the yearly accounts that an outside accounting firm has checked. On the Finance page of the Town's website, the only statements we found are for 2022, and the auditor's report on them is dated September 19, 2023. We did not find later years. The 2026 budget does print 2023 and 2024 'actual' numbers and 2025 numbers marked 'unaudited', so the Town is tracking its results. The open question is whether the checked statements for those years are public.
Why it matters
Audited statements are the independent check on what the Town reports about its own money. Residents voting on October 26, 2026 would normally be able to see the last few years of them.
It could be because…
The later statements may be posted somewhere we did not look, such as the meeting portal, which we could not read.
The Town may post the statements only after council receives them, and the website may simply be behind.
The Town may have filed them with the province without adding them to its website.
Questions you could ask
Are the audited statements for 2023, 2024 and 2025 complete, and when will they be posted?
Where can residents find the auditor's letters to council about those years?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
The Finance page lists "2026 Operating and Capital Budget", "2025 Operating and Capital Budget", "2024 Operating and Capital Budget" and "2022 Consolidated Financial Statements". We did not find a statements link for 2023, 2024 or 2025 on the page.
The 2022 consolidated financial statements carry an auditor's report dated "September 19, 2023" and say the statements "present fairly, in all material respects" the Town's financial position.
$401,500interest from Hearst Connect budgeted for 2026, against $52,500 received in 2024
The Town owns Hearst Connect Corporation, a company that sells internet and telephone service. At the end of 2022 the Town's statements show a long-term receivable (money owed to the Town) of $3,900,000 from Hearst Connect, and the company's own condensed results show a net deficit of $(12,655) with net income of $398,142 for the year. The Town's budget line 'INTEREST - Hearst Connect' was $45,000 in 2023 and $52,500 in 2024, was budgeted at $200,500 for 2025, and is budgeted at $401,500 for 2026. The budget's summary page says only that income from 'Government Business Enterprises' goes from $294,500 to $480,000.
Why it matters
A town that lends millions to a company it owns is taking a risk with taxpayers' money. A budget that counts on more income from that company each year depends on the company being able to pay it. We did not find later statements for the company or an explanation of the change.
It could be because…
The company may have grown its income since 2022, and a bigger payment may be affordable. The statements show it earned $398,142 in 2022, up from $319,974 in 2021.
The Town may have changed the loan terms or the interest rate, which would explain a higher budget line.
The 2025 'actual' of $200,500 equals the 2025 budget exactly, so the line may be a planned payment rather than a measured amount.
Questions you could ask
What are the terms of the $3,900,000 owed by Hearst Connect (rate, repayment dates, what happens if it cannot pay)?
Why does the 2026 budget expect $401,500 in interest from Hearst Connect, against $52,500 in 2024?
Will the Town post Hearst Connect's own statements for 2023 to 2025?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
Hearst Connect, December 31, 2022: "Long-term receivable $ 3,900,000 $ 3,900,000" (2022 and 2021). Condensed results: "Net deficit $ (12,655)" at year end (2021: $ (410,797)); "Net income $ 398,142" for 2022 (2021: $ 319,974). Related interest paid to the Town: "Interest 75,569" in 2022.
General fund detail, "INTEREST - Hearst Connect": 2023 actual (45,000), 2024 actual (52,500), 2025 budget (200,500), 2025 actual (unaudited) (200,500), 2026 budget (401,500). Brackets mark revenue in this report.
Summary of non-program revenue: "Government Business Enterprises" 294,500 in 2025 and 480,000 in 2026 (63%). The capital financing plan also lists "Hearst Connect Dividend 245,000" as a source for 2026 capital projects.
$454,301bank interest in 2025 (unaudited), against a budget of $308,800
The Town earned $690,378 in interest on its bank accounts in 2023 and $649,059 in 2024. The 2025 budget expected $308,800 and the 2025 unaudited result is $454,301, which is $145,501 more than budgeted (worked out by us). The 2026 budget expects $313,300. A budget set below what usually arrives leaves room for a surplus, which can then be spent on something else.
Why it matters
Interest rates move up and down, so some drop can be expected. But if the budget is set well under what the Town is earning, the tax increase (3.00% for 2026) may be larger than it needs to be, or the surplus may be used without a public vote on it.
It could be because…
Interest rates may fall, and the Town may be prudently budgeting for a drop.
Cash balances were high in 2023 and 2024 because capital projects were delayed, and may be lower going forward.
The Town may use any 2025 surplus for one-time capital costs. The capital financing plan lists "Surplus from operation 2025" of 890,000.
Questions you could ask
How did the Town choose $313,300 as the 2026 interest budget, given $454,301 earned in 2025?
What are the Town's average cash and investment balances, and where are they held?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
General fund detail, "INTEREST - Bank accounts": 2023 actual (690,378), 2024 actual (649,059), 2025 budget (308,800), 2025 actual (unaudited) (454,301), 2026 budget (313,300). Brackets mark revenue in this report.
$320,089non-routine commercial and industrial spending over 2023 to 2025, with no budget (worked out by us)
The 'Com. & Ind. - Non-routine expenses' line had a budget of 0 for 2025 and no budget behind it in the earlier years either. Spending on it was $47,242 in 2023, $169,789 in 2024 and $103,058 in 2025 (unaudited), which adds to $320,089 (worked out by us). The whole commercial and industrial section had a 2025 budget of $58,900 and a 2025 result of $141,732. Separately, the department's net cost in the 2026 budget rises 95%, from $159,500 to $311,100.
Why it matters
Money spent that was never in the budget did not get a council vote beforehand. The budget does not say what the 2024 and 2025 spending was for, so a resident cannot tell if it was a one-time cost or a recurring one.
It could be because…
Council may have approved the spending separately during the year, for example for a grant match or a study, and the budget lines were not updated.
Some of it may be paid back by grants or partners that appear in a different revenue line.
The 2026 increase may be a planned change in staffing or programs. The 2026 page lists salaries of $212,600 inside a department total expense of $350,400.
Questions you could ask
What were the 2024 ($169,789) and 2025 ($103,058) non-routine commercial and industrial costs for, and did council approve them?
What explains the 95% rise in the department's 2026 net cost?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
General fund detail, "Com. & Ind. - Non-routine expenses": 2023 actual 47,242, 2024 actual 169,789, 2025 budget 0, 2025 actual (unaudited) 103,058, 2026 budget 0. "Total 66.Commercial & industrial": 85,507; 207,526; 2025 budget 58,900; 2025 actual 141,732; 2026 budget 42,900.
Department page, Commercial & Industrial Development: "DEPARTMENT COST 2026 : $ 311,100", "2025 : $ 159, 500", "95 % from 2025". No reason for the change is printed on the page.
Hearst spent $1.8M on water, sewers and garbage in 2019 and $2.6M in 2024. Prices only went up about 18% in that time.
Why did the cost of water, sewers and garbage grow 45% in 5 years?
Water, sewers and garbage
Prices (inflation)
+0%+10%+20%+30%+40%+50%
+45%
201920202021202220232024
Show as a table
Year
Water, sewers and garbage
Prices (inflation)
2019
+0%
+0%
2020
+7%
+1%
2021
+21%
+4%
2022
+21%
+11%
2023
+29%
+16%
2024
+45%
+18%
Change since the first year shown. The grey line is how much prices rose overall, for comparison.
Why it matters
When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.
It could be because…
The town added a service, a building or staff that residents asked for.
Costs were moved from another area, so the total did not really change.
Accounting rules changed how costs are sorted.
Large one-time costs, like a study, lawsuit or repair, landed in one year.
Questions you could ask
What did the extra $821K a year pay for?
Why did the dump (landfill) go from $184K to $551K?
Was each increase approved by council as a separate decision, or did it happen through the yearly budget?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
$502,788spent on waste supplies and services in 2022, against a budget of $254,800
In 2022 the Town budgeted $254,800 for supplies and services in waste collection, disposal and recycling, and spent $502,788. The statements give part of the answer. The Town's landfill closure and clean-up liability (money it must set aside for closing the landfill one day) rose from $483,000 to $686,000 in 2022, and the cash flow statement shows a change of $203,000. The 2026 budget includes $105,000 to start an environmental assessment for the landfill.
Why it matters
Landfills are an expensive, long-term obligation. Setting money aside each year is the responsible way to meet it, but the budget did not include it. The 2022 budget was off by about $248,000 on this line.
It could be because…
The landfill liability increase of $203,000 may be most of the difference. The Town's budget is on a cash basis and the statements are not, as Note 24 says.
Waste costs for a one-time cleanup or hauling may have been added in the year.
The Ministry of the Environment, Conservation and Parks was reviewing the landfill's expected life, which can change the estimate.
Questions you could ask
How much of the 2022 waste overspend was the landfill liability, and how much was other cost?
What is the full expected cost of the landfill assessment and of closing the site?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
Analysis of expenses, Environmental Services, supplies and services: "Waste collection, disposal and recycling 254,800 502,788 629,679" (2022 budget, 2022 actual, 2021 actual).
Statement of financial position: "Solid waste landfill closure and post-closure (Note 18) 686,000 483,000". Note 18 says "an amount of $686,000 (2021 - $483,000) with respect to landfill closure and post-closure liabilities has been accrued" and "The expected remaining life of the landfill is currently being reviewed by the Ministry of the Environment, Conservation and Parks." Cash flow statement: "Solid waste landfill closure and post-closure 203,000 357,000".
2026 capital projects: "01. Consultant Fees - Landfill 105,000", described as "Consultation fees to start the Environmental Assessment per the approved Terms of Reference."
$300,000a year estimated for repaying the recreation centre reserve, in year 4 of 15
A reserve is a savings account a town sets aside for a purpose. The 2026 budget says Council passed a resolution to repay the reserve used for the recreation centre rehabilitation. The estimate is $300,000 a year over 15 years, and the Town is in year 4. That is about $4.5 million in total (worked out by us), but the budget says the amount will be recalculated when the project is finished. The 2022 statements list commitments of $4,959,650 for recreation in 2023.
Why it matters
A payment that lasts 15 years is a promise on every future budget. Residents should know the total, the years left, and what happens to the figure if the project cost changes.
It could be because…
The amount is deliberately an estimate until the project is finished, as the budget says.
The repayment may already be part of the tax rate, so the 3.00% increase for 2026 already covers it.
Questions you could ask
What is the final cost of the recreation centre rehabilitation, and how much of the reserve has been repaid?
When does the repayment end, and where is the schedule published?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
"Council has passed a resolution to repay the reserve used for the recreation centre rehabilitation project. An initial amount of $300,000 per year is estimated, and this will be recalculated upon completion of the project. We are currently in year 4 of the 15-year repayment period."
$1,569,252CWELCC grant received in 2025 (unaudited), against a budget of $407,500
In the 2025 budget, the child care centre's 'Operating Grant' was $1,200,400 and its 'CWELCC' grant was $407,500. The 2025 unaudited results show the reverse: $51,240 and $1,569,252. Together the lines are $1,607,900 budgeted and $1,620,492 received (worked out by us), so the total is close. The 2026 budget has $52,000 and $1,917,200, matching the new pattern.
Why it matters
A budget line that is far from its result for a whole year means the budget was split the wrong way. The total is close, so little money seems to be missing, but it is a sign of how carefully the budget was checked.
It could be because…
The funding rules or the way the funder (DCSSAB) pays may have changed during 2025, moving money from one line to the other.
The 2026 budget corrects the split, which would show the Town fixed it.
Questions you could ask
Why did the 2025 budget split the two child care grants differently from the way they were received?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
General fund detail, "CCC - DCSSAB - Operating Grant CCC": (541,823) 2023, (734,462) 2024, (1,200,400) 2025 budget, (51,240) 2025 actual (unaudited), (52,000) 2026 budget. "CCC - DCSSAB - CWELCC": (292,876), (352,722), (407,500), (1,569,252), (1,917,200). Brackets mark revenue.
$269,900total 2026 budget for Members of Council, down 2% from 2025
Ontario towns must publish a yearly statement of what each member of council was paid and what expenses were repaid. We did not find one on the Finance page, the council page or the budget documents we read. The 2026 budget gives one total for the cost of Council: $269,900, down 2% from $274,600 in 2025.
Why it matters
The statement is how residents see what their representatives cost. We have not filled in a pay table for Hearst, because there is no statement we could read.
It could be because…
The statements may be posted on the meeting portal, which we could not read, or on a page we did not find.
The Town may publish it as part of a council meeting report rather than as a separate page.
Questions you could ask
Where is the Town's statement of council remuneration and expenses for 2022 to 2025 posted?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
Members of Council, summary budget: "Members of Council 274,600 - 274,600 269,900 - 269,900 (4,700) -2%" (2025 net budget, 2026 net budget, change).
Hearst spent about $397 per home on garbage, dump and recycling in 2024. The typical similar town spent $304. Only 2 of 21 similar towns spent more.
Why it matters
Spending more than neighbours is not wrong by itself. It might buy better service. But it is the first place to look for costs that could be lower, such as contracts that were not competitively bid.
It could be because…
Geography: more roads, more snow, a bigger area or a landfill of its own.
Accounting: some towns record the same cost in a different category.
A one-time cost in this year.
Questions you could ask
What makes this cost higher here than in similar towns?
When were the main contracts in this area last put out to competitive tender?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
Garbage, dump and recycling per home: Hearst $397; typical similar town $304; ranked 3rd highest of 22.
Hearst spent about $213 per home on snow ploughing in 2024. The typical similar town spent $101. Only 1 of 21 similar towns spent more.
Why it matters
Spending more than neighbours is not wrong by itself. It might buy better service. But it is the first place to look for costs that could be lower, such as contracts that were not competitively bid.
It could be because…
Geography: more roads, more snow, a bigger area or a landfill of its own.
Accounting: some towns record the same cost in a different category.
A one-time cost in this year.
Questions you could ask
What makes this cost higher here than in similar towns?
When were the main contracts in this area last put out to competitive tender?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Hearst?Send us your answer and we will publish it with this question.
The evidence
Snow ploughing per home: Hearst $213; typical similar town $101; ranked 2nd highest of 22.