Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read Pelham's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
Questions · 12 so far
Things worth asking about
We read Pelham's financial reports and meeting minutes, and compared its numbers with 35 similar Ontario towns. These are the things that stood out.
What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer
Needs an answer
These are unusual enough that residents deserve a clear answer from council.
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Pelham had $11.9M saved at the end of 2025, up from $5.1M in 2019. That is 40% of one year's spending. Only 1 of 35 similar towns had less, compared with what they spend.
Found automatically from the town's financial reports · 2 sources
Worth asking
Worth asking
There may well be a good reason. It is still worth asking what it is.
$250,000budgeted for supplemental taxes in 2026, against $436,046 collected in 2024
Supplemental taxes are extra property tax bills sent when a new or renovated building is added to the assessment roll part-way through a year. The 2026 budget book shows the Town collected $730,738 of them in 2023 and $436,046 in 2024. Both the 2025 budget and the 2026 budget plan for $250,000. The Treasurer's 2025 report says the 2025 surplus was mostly because supplemental taxes and some other revenues came in above budget. It does not print the 2025 supplemental amount in the pages we could read.
Found by reading the town's own documents · 2 sources
$666,000winter control over budget in 2025, per the annual report
Winter control is snow plowing, salting and sanding. The 2025 annual report says winter control was $666,000 over budget in 2025 and $550,000 over the 2024 actual, because of a record number of callouts. The 2026 budget book shows 2024 winter control cost $851,033 against an approved budget of $727,626, and the 2026 budget is $737,490, up $2,459 from 2025. Adding the 2025 overrun to the 2025 budget gives about $1.4 million, worked out by us: the 2026 budget is about half of that.
Found by reading the town's own documents · 3 sources
$1,591,816actual 2024 net cost of shared administration, against an approved $892,443
Shared administrative overhead is a cost line for things that serve the whole Town, such as insurance, legal fees, WSIB (workers' injury insurance) and postage. The 2025 budget book shows $892,443 approved for 2024 and no money going to reserves. The 2026 budget book shows the 2024 actual cost was $1,591,816, including $887,696 moved to reserves, and $139,617 spent on contract services against $90,000 approved. The difference is $699,373, worked out by us.
Found by reading the town's own documents · 2 sources
$28,268,107total debt obligations planned for the end of 2026, up from $22,199,979
The 2025 annual report celebrates that net debt (what the Town owes less what it holds in financial assets) fell from $7.3 million to $4.6 million, helped by "restraint in taking out debt". The 2026 capital budget then plans $8,000,000 of new borrowing for a rebuilt Fire Station 1, and a further $1.0 million for a hospital contribution, expected in 2027. The debenture schedule shows total debt obligations rising from $22,199,979 to $28,268,107 in 2026. The Town says the station's debt payments will be covered by a debt repayment reserve and development charges, not the tax levy.
Found by reading the town's own documents · 2 sources
$1,479,643planned 2026 shortfall at the Meridian Community Centre, up from $817,889 in 2023
The Town's budget book adds up everything for the Meridian Community Centre (the Town's main arena and recreation building) into one table. After debt and other items it shows a shortfall that taxes cover: $817,889 in 2023, $960,336 in 2024, $1,396,135 budgeted for 2025 and $1,479,643 budgeted for 2026. Staff pay and benefits for the centre rise from $1,758,642 in 2023 to $2,523,672 in 2026. Revenues are planned to rise from $1,632,654 to $1,811,500. Worked out by us, the shortfall is up about 81% and staff cost about 43% over those years.
Found by reading the town's own documents · 2 sources
$135Kfor new positions and position changes, as the 2026 budget notes put it
The 2026 budget book explains a $618,065 rise in salaries and wages. One piece reads: "$135K for new positions and position changes not approved by Council". Other notes mention a new part-time and a new full-time position. Separately, the Town's Mayoral decisions page says the Mayor has the power to "establish or amend the organizational structure" of the Town, and lists a Mayoral decision delegating organizational structure and employment matters to the CAO.
Found by reading the town's own documents · 2 sources
36 daysthe longest the Town says its 2026 budget process can take under the strong-mayor rules
Under strong-mayor rules the Mayor proposes the budget and council may amend it. The Town's page says council can pass amendments within 30 days, and that Pelham has shortened the later steps so the whole process takes at most 36 days. The 2026 schedule shows draft budgets available to council on October 29, 2025, the Finance and Audit Committee review on November 6 and the presentation to council on November 17. A Mayoral decision dated November 18, 2025 says no amendments were proposed or passed, so the budget was deemed adopted as presented.
Found by reading the town's own documents · 2 sources
$16.8 million vs $17.4 millioncapital projects carried forward to 2026, as stated on two pages of the same report
The Treasurer's message says $16.8 million of capital projects are carried forward to 2026. The accumulated surplus page says about $17.4 million is carrying forward. One page says the Town acquired $9.0 million of tangible capital assets (buildings, roads and equipment) in 2025 and another says $7.9 million. The Treasurer's message also says 59 grant applications totalling $5.4 million led to 10 approvals worth $17.1 million, and the financial overview describes the position at "December 31, 2024" in a report on 2025.
Found by reading the town's own documents · 1 source
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Pelham had $11.9M saved at the end of 2025, up from $5.1M in 2019. That is 40% of one year's spending. Only 1 of 35 similar towns had less, compared with what they spend.
Does Pelham have enough saved for repairs and emergencies?
$0$5.0M$10M$15M
$11.9M
2019202020212022202320242025
Show as a table
Year
Savings (reserves)
2019
$5.1M
2020
$10.1M
2021
$13.9M
2022
$13.1M
2023
$10.0M
2024
$10.8M
2025
$11.9M
Why it matters
With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.
It could be because…
The town spent savings on purpose, on projects that were planned and saved up for.
Some savings were used to match grant money, which brings in more than it costs.
The town has a plan to rebuild its savings.
Questions you could ask
Does the town have a written reserve policy with a target amount?
What were the savings spent on between 2019 and 2025?
What is the plan to rebuild them, and by when?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
$250,000budgeted for supplemental taxes in 2026, against $436,046 collected in 2024
Supplemental taxes are extra property tax bills sent when a new or renovated building is added to the assessment roll part-way through a year. The 2026 budget book shows the Town collected $730,738 of them in 2023 and $436,046 in 2024. Both the 2025 budget and the 2026 budget plan for $250,000. The Treasurer's 2025 report says the 2025 surplus was mostly because supplemental taxes and some other revenues came in above budget. It does not print the 2025 supplemental amount in the pages we could read.
Why it matters
A budget is the promise made to taxpayers about what the year will cost. If a revenue line is set well below what it has brought in for years, the tax rate can be higher than it needed to be, and the extra shows up later as a surplus.
It could be because…
Supplemental taxes depend on when the assessment agency (MPAC) finishes its work, so the Town may budget a low number on purpose because it cannot predict the timing.
The Town may use the extra money for one-time costs and for reserves, which the 2025 report says went up by about $1.07 million.
The 2025 report says the Town budgets on a modified cash basis, which differs from the statements, so some of the 2025 surplus is accounting rather than cash.
Questions you could ask
What did the Town collect in supplemental taxes in 2025, and how much of the 2025 surplus did it make up?
Why was the 2026 supplemental taxes line kept at $250,000 after three years of larger amounts?
How was the extra supplemental tax money used: reserves, debt, or lower taxes the next year?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
Finance Services page: "Supplemental Taxation Revenue" 2023 actual $730,738, 2024 actual $436,046, 2025 approved budget $250,000, 2026 approved budget $250,000. The summary of major revenues also shows "Supplemental Taxation Revenue" of 250,000 in both years.
The Treasurer's message says the financial statement surplus of $4.7 million "exceeded budget, and is primarily a result supplemental taxation, interest, and recreation program revenues which exceeded budget, and unbudgeted grants." The overview adds: "Property tax revenue was higher than budget because of supplemental taxation revenue, which is a result of growth in the Town", it says. It prints the annual surplus as $ 4,720,490 and does not print the 2025 supplemental taxation amount.
Town of Pelham 2025 Annual Report · Message from the Treasurer, PDF page 23; Consolidated Statement of Operations overview, PDF page 32
$666,000winter control over budget in 2025, per the annual report
Winter control is snow plowing, salting and sanding. The 2025 annual report says winter control was $666,000 over budget in 2025 and $550,000 over the 2024 actual, because of a record number of callouts. The 2026 budget book shows 2024 winter control cost $851,033 against an approved budget of $727,626, and the 2026 budget is $737,490, up $2,459 from 2025. Adding the 2025 overrun to the 2025 budget gives about $1.4 million, worked out by us: the 2026 budget is about half of that.
Why it matters
When a cost goes over budget two years in a row and the next budget does not change, council is either counting on mild winters or planning to cover another overrun from reserves. Residents should know which.
It could be because…
The Town says 2025 had a record number of callouts, so it may be treating it as an unusual year.
Winter weather is hard to predict, and the Town may prefer to pay overruns from a reserve instead of taxing for them every year.
The annual report works on a different basis from the budget book, so the two overrun amounts may not line up exactly.
Questions you could ask
What did winter control cost in 2025, and how was the overrun paid for?
Why is the 2026 winter control budget $737,490, when the last two years cost well above that?
Does the Town have a winter control reserve, and what is in it?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
Transportation services "are higher than budget mainly due to high demand for winter control services, leading to a record number of operational callouts. The total winter control amount over budget was $666,000 and $550,000 over from 2024 actual."
Winter Control, Total Expenditures: 2023 actual 690,283; 2024 actual 851,033; 2025 approved budget 735,031; 2026 approved budget 737,490. 2024 "Transfer from Reserve" $123,406. The page's note says nothing about the 2025 overrun.
$1,591,816actual 2024 net cost of shared administration, against an approved $892,443
Shared administrative overhead is a cost line for things that serve the whole Town, such as insurance, legal fees, WSIB (workers' injury insurance) and postage. The 2025 budget book shows $892,443 approved for 2024 and no money going to reserves. The 2026 budget book shows the 2024 actual cost was $1,591,816, including $887,696 moved to reserves, and $139,617 spent on contract services against $90,000 approved. The difference is $699,373, worked out by us.
Why it matters
A reserve transfer in the middle of an operating line is easy to miss. Residents can only tell whether it was a planned saving or an unplanned cost if the Town says what the $887,696 was.
It could be because…
Council may have moved year-end surplus money into reserves under the Town's reserve policy, and this line is where the transfer was recorded.
The extra contract services may be legal or consulting costs that came up during the year.
The budget book may have grouped the transfer here for convenience and it may have been planned in another line.
Questions you could ask
What was the $887,696 transferred to reserves in 2024, and which reserve received it?
Was the transfer planned when the 2024 budget was approved?
What legal and consulting work made up the 2024 contract services?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
Shared Administrative Overhead, 2024 actual: Contract Services $139,617; "Transfer to Reserve" 887,696; Total Expenditures 1,792,346; Net Levy Requirements $ 1,591,816. For 2025 the approved budget shows Contract Services 90,000 and no transfer to reserve.
Shared Administrative Overhead, 2024 approved budget: Contract Services 90,000; Transfer to Reserve shown as a dash; Total Expenditures 1,092,443; Net Levy Requirements $ 892,443.
$28,268,107total debt obligations planned for the end of 2026, up from $22,199,979
The 2025 annual report celebrates that net debt (what the Town owes less what it holds in financial assets) fell from $7.3 million to $4.6 million, helped by "restraint in taking out debt". The 2026 capital budget then plans $8,000,000 of new borrowing for a rebuilt Fire Station 1, and a further $1.0 million for a hospital contribution, expected in 2027. The debenture schedule shows total debt obligations rising from $22,199,979 to $28,268,107 in 2026. The Town says the station's debt payments will be covered by a debt repayment reserve and development charges, not the tax levy.
Why it matters
Debt payments come out of future budgets. Even if reserves cover them for now, residents should know how long the reserve lasts and what happens when it runs out.
It could be because…
Net debt and debenture debt are different measures, so both statements can be true at once.
The Town says the tax levy part of the Fire Station 1 debt is fully covered by the debt repayment reserve, which is being built up as older debts are paid off.
The Town says its debt payments will stay below the provincial 25% repayment limit and its own 12% limit.
A fire station replacement may be needed for safety, and the Town says the existing building has structural and operational issues.
Questions you could ask
How much is in the debt repayment reserve, and for how many years does it cover the Fire Station 1 payments?
What does the Town's own repayment limit calculation show once the new debt is added?
What is the hospital contribution for, and who decided on a 15 year debt for it?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
Facilities page: project FAC 01-26 Fire Station #1 - Expansion and Rehabilitation, approved budget 8,000,000, financed by DC Debenture 1,871,400 and Debenture 6,128,600. Debenture schedule: "2026 Total Debt Obligations" $22,199,979 beginning balance, $8,000,000 2026 debt, $28,268,107 year end balance. The Debentures and Debt page says the tax levy part is "fully covered by contributions from the debt repayment reserve", that "The $1.0 million debt for the Hospital contribution is an operating debt" with payments of $90,571 for 15 years, and that debt costs are "not projected to exceed" the 25% provincial limit or the Town's 12% limit.
The Treasurer's message says net debt "decreased from $7.3 million to $4.6 million" and that this "is primarily the result of increased transfers to reserves, restraint in taking out debt, and some delays in capital projects." The financial overview says "Long-term debt decreased by $2.07 million due to principal payments on debt, while no new debt was issued in the year."
$1,479,643planned 2026 shortfall at the Meridian Community Centre, up from $817,889 in 2023
The Town's budget book adds up everything for the Meridian Community Centre (the Town's main arena and recreation building) into one table. After debt and other items it shows a shortfall that taxes cover: $817,889 in 2023, $960,336 in 2024, $1,396,135 budgeted for 2025 and $1,479,643 budgeted for 2026. Staff pay and benefits for the centre rise from $1,758,642 in 2023 to $2,523,672 in 2026. Revenues are planned to rise from $1,632,654 to $1,811,500. Worked out by us, the shortfall is up about 81% and staff cost about 43% over those years.
Why it matters
A community centre does not have to pay for itself, but residents who fund the shortfall through taxes should know how large it is meant to be and what the pay increase buys.
It could be because…
The Town says staffing rose because of pay grid movement, cost of living increases and more part-time staff for more activity.
Part of the cost may be for services that did not exist in 2023, such as concession operations, which the 2025 report says brought $162,000 of revenue against $219,000 of costs.
The table includes debt payments and costs from before the centre opened, so the shortfall is not all about running the building.
Questions you could ask
How many positions at the centre were added between 2023 and 2026, and how many are part-time?
How much of the planned shortfall is debt payments and how much is running costs?
Once the donation pledges run out in 2026, how much more of the debt will taxes pay?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
Meridian Community Centre Consolidated Budget: Total Revenues 1,632,654 (2023 actual), 1,637,298 (2024 actual), 1,679,000 (2025 approved), 1,811,500 (2026 approved). Salaries and Benefits 1,758,642, 1,979,657, 2,387,807, 2,523,672. "NET SURPLUS (DEFICIT)" $ (817,889), $ (960,336), $ (1,396,135), $ (1,479,643). Note (3): "Salary Grid movement, COLA, and increase in part-time staff due to increase in activity."
Debenture schedule note 2: "Debt will be funded by MCC capital donations pledged for future years until they are no longer able to cover the debt payments, at which time it will become operating debt. This is estimated to occur in 2026." The schedule shows MCC donation pledge debt of $ 2,710,475 at the start of 2026.
$135Kfor new positions and position changes, as the 2026 budget notes put it
The 2026 budget book explains a $618,065 rise in salaries and wages. One piece reads: "$135K for new positions and position changes not approved by Council". Other notes mention a new part-time and a new full-time position. Separately, the Town's Mayoral decisions page says the Mayor has the power to "establish or amend the organizational structure" of the Town, and lists a Mayoral decision delegating organizational structure and employment matters to the CAO.
Why it matters
Residents expect council to see and vote on new staff positions. If the phrase is a slip, it should be fixed. If positions were added by another route, residents should know who decides.
It could be because…
It may be a typing slip for "now approved by Council".
The positions may have been added by the CAO under the powers the Mayor delegated, as strong-mayor rules allow.
Council may have approved the positions as part of the whole budget without voting on each one.
Questions you could ask
Which positions make up the $135,000, and what was the date and form of the approval for each?
Does the Town report new positions to council when the CAO adds them?
Is "not approved by Council" a typing error in the budget book?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
Summary of Major Expenditures, Salaries and Wages $ 8,495,364 (2025) to $ 9,113,429 (2026), change $ 618,065. Note (1): "$376K in increases for cost of living adjustments, salary grid movements, and minimum/living wage increases for existing staff; $135K for new positions and position changes not approved by Council; $85K for volunteer firefighter points."
The Mayor's special powers include to "Hire and dismiss certain Town officials and establish or amend the organizational structure of the Town of Pelham". The page lists "MD 2025-01 - Delegation of Organizational Structure, Employment Matters to CAO". We did not read that decision: its PDF is a picture with no text layer.
Pelham spent $1.6M on police, fire and safety in 2019 and $2.5M in 2025. Prices only went up about 21% in that time.
Why did the cost of police, fire and safety grow 57% in 6 years?
Police, fire and safety
Prices (inflation)
+0%+20%+40%+60%
+57%
2019202020212022202320242025
Show as a table
Year
Police, fire and safety
Prices (inflation)
2019
+0%
+0%
2020
+6%
+1%
2021
+18%
+4%
2022
+24%
+11%
2023
+37%
+16%
2024
+54%
+18%
2025
+57%
+21%
Change since the first year shown. The grey line is how much prices rose overall, for comparison.
Why it matters
When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.
It could be because…
The town added a service, a building or staff that residents asked for.
Costs were moved from another area, so the total did not really change.
Accounting rules changed how costs are sorted.
Large one-time costs, like a study, lawsuit or repair, landed in one year.
Questions you could ask
What did the extra $896K a year pay for?
Why did fire department go from $966K to $1.5M?
Was each increase approved by council as a separate decision, or did it happen through the yearly budget?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
Police, fire and safety: 2019 $1.6M, 2020 $1.7M, 2021 $1.8M, 2022 $2.0M, 2023 $2.2M, 2024 $2.4M, 2025 $2.5M.
Pelham spent $4.0M on water, sewers and garbage in 2019 and $7.5M in 2025. Prices only went up about 21% in that time.
Why did the cost of water, sewers and garbage grow 88% in 6 years?
Water, sewers and garbage
Prices (inflation)
+0%+20%+40%+60%+80%+100%
+88%
2019202020212022202320242025
Show as a table
Year
Water, sewers and garbage
Prices (inflation)
2019
+0%
+0%
2020
+10%
+1%
2021
+14%
+4%
2022
+25%
+11%
2023
+42%
+16%
2024
+49%
+18%
2025
+88%
+21%
Change since the first year shown. The grey line is how much prices rose overall, for comparison.
Why it matters
When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.
It could be because…
The town added a service, a building or staff that residents asked for.
Costs were moved from another area, so the total did not really change.
Accounting rules changed how costs are sorted.
Large one-time costs, like a study, lawsuit or repair, landed in one year.
Questions you could ask
What did the extra $3.5M a year pay for?
Why did sewer pipes go from $1.6M to $3.6M?
Was each increase approved by council as a separate decision, or did it happen through the yearly budget?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
36 daysthe longest the Town says its 2026 budget process can take under the strong-mayor rules
Under strong-mayor rules the Mayor proposes the budget and council may amend it. The Town's page says council can pass amendments within 30 days, and that Pelham has shortened the later steps so the whole process takes at most 36 days. The 2026 schedule shows draft budgets available to council on October 29, 2025, the Finance and Audit Committee review on November 6 and the presentation to council on November 17. A Mayoral decision dated November 18, 2025 says no amendments were proposed or passed, so the budget was deemed adopted as presented.
Why it matters
A budget with no changes can mean council agreed with it, or that there was too little time or too little debate. Residents cannot tell which from the documents we could read, because the meeting minutes were not available to us.
It could be because…
Council had the draft from October 29 and a committee review on November 6, so members may have had about three weeks and simply agreed.
Council chose, by resolution, to shorten the steps, as the Town's page says.
Any disagreements may have been settled at the November 6 committee review, before the formal amendment step.
Questions you could ask
On what date did the review period for council amendments start and end?
Did any member ask staff or the Mayor for changes to the 2026 budget during the Finance and Audit Committee review?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
"After the budget is proposed, Council has the authority to pass resolutions amending the proposed budget within 30 days of its receipt." "As a result, the complete budget process has a maximum duration of 36 days and may proceed even faster if veto powers are not exercised." Schedule: Wednesday, October 29, 2025 draft capital and operating budgets available for Council and the Finance and Audit Committee; Thursday, November 6, 2025 Finance and Audit Committee review; Monday, November 17, 2025 Special Meeting presentation at Committee of the Whole.
Mayoral Decision 2025-02, November 18, 2025: "no amendments to the 2026 Capital and Operating Budget were proposed or passed by Council during the review period." It adds that the 2026 Budget is "deemed adopted as originally presented."
$16.8 million vs $17.4 millioncapital projects carried forward to 2026, as stated on two pages of the same report
The Treasurer's message says $16.8 million of capital projects are carried forward to 2026. The accumulated surplus page says about $17.4 million is carrying forward. One page says the Town acquired $9.0 million of tangible capital assets (buildings, roads and equipment) in 2025 and another says $7.9 million. The Treasurer's message also says 59 grant applications totalling $5.4 million led to 10 approvals worth $17.1 million, and the financial overview describes the position at "December 31, 2024" in a report on 2025.
Why it matters
These are small differences, and may well have simple causes, but readers rely on this report. Figures that disagree inside one document make it harder to trust the rest.
It could be because…
The two carry-forward figures may count different things (for example, with and without water and wastewater, or at different dates).
The $9.0 million and $7.9 million may be before and after amounts paid for but not yet received.
The grants sentence explains that some approvals were for applications made in 2024, so the $5.4 million and $17.1 million may not match by design.
"December 31, 2024" may simply be a typing slip.
Questions you could ask
Which carry-forward figure is right, $16.8 million or $17.4 million, and what does each include?
Will the Town publish a corrected version of the 2025 annual report if any of these are slips?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
Treasurer's message: "The Town has $16.8 million of capital projects being carried forward to 2026." "59 grant applications were submitted in 2025, totalling $5.4 million. Of which 10 were approved in the amount of $17.1 million. These included grants applied in 2024 but received approval in 2025". Accumulated surplus page: "The Town has approximately $17.4 million in projects carrying forward to be completed in 2026 which were budgeted in prior years, of which $12.7 million will be funded from these reserves." Tangible capital assets page: "the Town of Pelham acquired $9.0 million of tangible capital assets." Change in net debt page: "the acquisition of tangible capital assets of $7.9 million". Financial position overview: "at December 31, 2024".
Town of Pelham 2025 Annual Report · Message from the Treasurer, PDF page 23; Financial Overview, PDF page 26; Tangible Capital Assets, PDF page 29; Accumulated Surplus, PDF page 30; Change in Net Debt, PDF page 36
Pelham spent about $177 per home on snow ploughing in 2025. The typical similar town spent $118. Only 5 of 35 similar towns spent more.
Why it matters
Spending more than neighbours is not wrong by itself. It might buy better service. But it is the first place to look for costs that could be lower, such as contracts that were not competitively bid.
It could be because…
Geography: more roads, more snow, a bigger area or a landfill of its own.
Accounting: some towns record the same cost in a different category.
A one-time cost in this year.
Questions you could ask
What makes this cost higher here than in similar towns?
When were the main contracts in this area last put out to competitive tender?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Pelham?Send us your answer and we will publish it with this question.
The evidence
Snow ploughing per home: Pelham $177; typical similar town $118; ranked 6th highest of 36.
Can we count your visit? With your OK, we use Google Analytics to see which pages help people. It sets cookies and sends visit data to Google. Nothing loads unless you say yes. Privacy