Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read South Huron's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
A clear, checkable guide to South Huron's budget, taxes and council decisions. A municipality in Huron County in southwestern Ontario, with Exeter as its urban ward, two rural wards (Stephen and Usborne), a mayor, a deputy mayor and five councillors. Every figure links back to the public record.
$6.7 millionthe yearly gap between what the 2025 asset plan says is needed and what is being committed
Every few years a municipality has to write an asset management plan: a list of everything it owns (roads, bridges, water and sewer pipes, buildings, vehicles), what each is worth to replace and how much it needs to save each year to replace it in time. South Huron's 2025 plan, prepared with a consultant, says the Municipality needs to put away or spend about $13.8 million a year on this but is committing about $7.1 million. That leaves a yearly gap of $6.7 million. The plan says the gap should be closed over 10 to 20 years, not at once.
Found by reading the town's own documents · 2 sources
$1,563 to $2,615annual water and sewer bill for a home using 150 m3 on the Stephen rates, 2025 to 2036, in the consultant's proposed plan
A consultant, Watson and Associates, presented a 2026 to 2036 rate plan for water and sewer to council. It proposes raising the fixed base charge by 6.2% a year for water and 6.1% a year for sewer, and the per-cubic-metre charge by 2.1% a year, every year for eleven years. For a home using 150 cubic metres of water a year, the total annual bill on the Stephen rates goes from $1,563 in 2025 to $2,615 in 2036 as printed. The plan pays for about $70.9 million of pipes, plants and meters over 2026 to 2036 (worked out by us: $32,158,789 for water plus $38,816,518 for sewer, in today's dollars).
Found by reading the town's own documents · 4 sources
$11,186,288new debt in the sewer capital plan for 2026 to 2036, as printed in the consultant's slide
The consultant's sewer capital plan for 2026 to 2036 totals $51,033,673 in inflated dollars. Of that, $31,290,481 comes from the sewer reserve, $3,511,618 from grants and $5,045,286 from development charges (money builders pay when they build). The rest, $11,186,288, is new debt: $4,598,469 for upgrades to existing sewers and $6,587,819 for growth. The water plan, by contrast, shows no new debt.
Found by reading the town's own documents · 1 source
$5,964,526two arena loans due on demand at the end of 2023 (worked out by us from $4,706,969 and $1,257,557)
At the end of 2023 South Huron owed $22,787,155 in total, up from $22,020,588 a year earlier. Two of the loans were interest-only, at the bank's prime rate, and due on demand: $4,706,969 for the Exeter arena and $1,257,557 for the Stephen arena. Together that is $5,964,526 (worked out by us). The notes say $5,958,400 of principal would be recovered in 2024. These are the 2023 statements, the newest we could read. The 2024 statements are posted but our download was refused.
Found by reading the town's own documents · 2 sources
$27.7 milliontotal 2026 capital budget, of which about $12.6 million is paid from reserves (worked out by us)
The adopted 2026 capital budget has two parts. The tax-supported part is $12,730,024, paid from $2,459,164 of general levy (property tax), $4,102,002 from reserves (savings) and $6,168,856 from grants and other sources. The water, sewer and garbage part is $14,999,778, paid from $8,532,528 of reserves and $6,467,250 of grants and other sources. Together that is about $27.7 million, of which about $12.6 million is reserves (worked out by us). At the end of 2023 all reserves and reserve funds together stood at $28,460,577, which is the newest balance we could read.
Found by reading the town's own documents · 3 sources
$534,318increase in the general levy once the 2026 budget was deemed adopted on January 14, 2026
Since May 1, 2025 South Huron's Mayor has the power to propose the budget, and council can amend it, the Mayor can veto an amendment, and council can override. The Municipality's list of mayoral decisions includes "Veto of Budget Amendment" dated December 19, 2025. The 2026 budget was deemed adopted on January 14, 2026, with a general levy increase of $534,318. We could not read the veto document, because it is a scan with no text. The page also links the amendments council proposed, which sit on the meeting portal that refused our download. So we can say that a veto took place but not what the amendment was or how much it was worth.
Found by reading the town's own documents · 2 sources
$175,129landfill reserve at the end of 2023, against a landfill closure liability of $7,531,800
Since 2023 the audited statements show a liability for closing and looking after the landfill sites. At the end of 2023 it was $7,531,800. The reserve set aside for it held $175,129. The statements say the rest is expected to come from yearly budget amounts over the remaining life of the landfill, and that the costs fall over 165 years.
Found by reading the town's own documents · 1 source
An estimate. It uses the residential tax rate, and splits South Huron's share by what each service cost in 2024 after its own fees and grants (for example, water bills pay for much of a water system). Real bills also depend on your property class, local charges and any rebates.