Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read Tiny's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
Questions · 9 so far
Things worth asking about
We read Tiny's financial reports and meeting minutes, and compared its numbers with 81 similar Ontario towns. These are the things that stood out.
What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer
Needs an answer
These are unusual enough that residents deserve a clear answer from council.
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Tiny had $7.5M saved at the end of 2024, up from $7.4M in 2019. That is 37% of one year's spending. Only 3 of 81 similar towns had less, compared with what they spend.
Found automatically from the town's financial reports · 2 sources
Worth asking
Worth asking
There may well be a good reason. It is still worth asking what it is.
$28 millionestimated project budget and construction loan limit, as stated in the 2024 statements
The Township is building a new administration centre. The 2024 audited statements say the project has an estimated budget of approximately $28 million, paid for first by an interest-only construction loan with a limit of $28 million (the loan is later meant to become a long-term debenture, which is a loan repaid over many years). The 2026 budget book shows the project in two places with different totals: a summary line of $9,741,000, and a detail page with expenses of $15,500,892 and a loan of $14,713,857. The Township's tax sheet says 2 cents of every tax dollar the Township keeps goes to "TTAC (debt financing)". We did not find a total cost, a total loan or a yearly repayment figure that matches across these pages.
Found by reading the town's own documents · 4 sources
$5,038,000cost of two properties, financed by donations and a $4.5 million two-year bank loan
The 2024 statements say that after year-end the Township agreed to buy two properties for $5,038,000, financed by donations and by a two-year bank loan of $4.5 million with monthly instalments of $21,250, including interest at 3.91% a year. Over 24 months those instalments add up to about $510,000 (worked out by us), far less than $4.5 million, so most of the loan would still be owing at the end of the two years unless it is repaid another way. The statements do not say how. The 2026 budget has a capital project called "Axler Block Development" with loan interest of $166,950. The pages we read do not say whether that is the same purchase.
Found by reading the town's own documents · 2 sources
$900,000put into the debt-financing reserve in 2026, against $925,904 of interest taken out (worked out by us)
A reserve is money saved for a set purpose. The Township keeps a debt-financing reserve to pay interest on its building loans. The 2026 budget puts $900,000 into it. The same budget takes out $758,954 for interest on the administration building and $166,950 for the Axler Block Development, which comes to $925,904 (worked out by us), $25,904 more than goes in. The loans are still growing, so the interest bill may grow with them. The Township pays this interest from the reserve rather than directly from the year's taxes.
Found by reading the town's own documents · 1 source
$811,494"Other" revenue in 2024, against a budget of $201,135
The 2024 budget for "Other" revenue was $201,135. The audited actual was $811,494. Investment income was also well above plan: budgeted at $197,000, it came in at $458,696. The notes break down the "other" line: "Donations, rents, sale of publications, etc." was $445,577, up from $61,768 in 2023. Total revenue was $26,859,839 against a budget of $25,839,674. The statements do not say what the donations were for.
Found by reading the town's own documents · 2 sources
$2,468,425general government salaries, wages and benefits in 2024, up from $2,122,334 in 2023
The "general government" part of the budget covers council, human resources and general administration. Its salaries, wages and benefits were $2,468,425 in 2024, up from $2,122,334 in 2023, a rise of about 16.3% (worked out by us). Its operating expenses rose about 16.6% (worked out by us), from $727,640 to $848,685. For the whole Township, salaries, wages and benefits rose about 6.9% (worked out by us), from $9,681,714 to $10,353,154. We did not find the Township's own explanation in the statements or the budget book.
Found by reading the town's own documents · 3 sources
3.99per cent blended tax rate increase for 2026, as stated by the Township
In 2024 "net municipal taxation" (the Township's own share of the tax bill, after what it collects for the County and the school boards) was $17,204,881, up from $15,848,771, a rise of about 8.6% (worked out by us). For 2026 the Township says Council approved a 3.99 per cent increase in the blended rate (Township, County and school taxes together). The 2026 budget also uses $508,000 transferred from prior years' surplus. The Township's own explanation is that the budget is built on its Asset Management Plan, and its web page says the increase may be reduced in the spring once the 2025 surplus is known. We did not find a posted update to say whether it was.
Found by reading the town's own documents · 3 sources
5recommendations from the Ombudsman, including accurate meeting notices, complete minutes and training
The Ontario Ombudsman is the independent officer who checks whether councils follow the rules for open meetings. In October 2023 the Ombudsman found that the Town of Midland, the Town of Penetanguishene and the Township of Tiny broke the open-meeting rules on April 19, 2022. The public notice for a joint airport task force presentation did not give up-to-date information on how to watch it online, and no minutes were kept. Tiny's council, with Penetanguishene's, disagreed with the Ombudsman's view that the task force was a committee of the municipalities. The Ombudsman made five recommendations, including training for committee members. The Township posts the report on its website.
Found by reading the town's own documents · 3 sources
Each question in full
Needs an answerFound automatically from financial reports
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Tiny had $7.5M saved at the end of 2024, up from $7.4M in 2019. That is 37% of one year's spending. Only 3 of 81 similar towns had less, compared with what they spend.
Does Tiny have enough saved for repairs and emergencies?
$0$2.0M$4.0M$6.0M$8.0M$10M
$7.5M
201920202021202220232024
Show as a table
Year
Savings (reserves)
2019
$7.4M
2020
$7.8M
2021
$7.0M
2022
$8.2M
2023
$7.8M
2024
$7.5M
Why it matters
With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.
It could be because…
The town spent savings on purpose, on projects that were planned and saved up for.
Some savings were used to match grant money, which brings in more than it costs.
The town has a plan to rebuild its savings.
Questions you could ask
Does the town have a written reserve policy with a target amount?
What were the savings spent on between 2019 and 2024?
What is the plan to rebuild them, and by when?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
$28 millionestimated project budget and construction loan limit, as stated in the 2024 statements
The Township is building a new administration centre. The 2024 audited statements say the project has an estimated budget of approximately $28 million, paid for first by an interest-only construction loan with a limit of $28 million (the loan is later meant to become a long-term debenture, which is a loan repaid over many years). The 2026 budget book shows the project in two places with different totals: a summary line of $9,741,000, and a detail page with expenses of $15,500,892 and a loan of $14,713,857. The Township's tax sheet says 2 cents of every tax dollar the Township keeps goes to "TTAC (debt financing)". We did not find a total cost, a total loan or a yearly repayment figure that matches across these pages.
Why it matters
A building of this size is likely the largest single bill in the Township's history, and the loan will be repaid from taxes and fees for years. Residents can only judge it if they can see the full cost, how much has been borrowed so far, and what each year's repayment will be.
It could be because…
The two 2026 figures may be different slices of the same project: new 2026 spending on one page and carried-over spending from earlier years on another. The detail page is labelled as including carry-over.
The $28 million may include things the budget book shows elsewhere, such as the interest on the loan and furniture or equipment.
The project may be expected to come in under the $28 million limit. A loan limit is a ceiling, not the expected cost.
The Township has said the budget is built on its Asset Management Plan, so the debt payments may have been planned for years.
Questions you could ask
What is the current approved total cost of the administration centre, and how much of it has been borrowed as of today?
Why does the 2026 budget book show $9,741,000 on one page and expenses of $15,500,892 on another for the same building?
When the construction loan becomes a long-term debenture, what will the yearly payment be, and for how many years?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
Note 6, Subsequent Events: "Subsequent to year-end, the Township has entered into a contract for the building of the Township of Tiny Administration Centre. The project has an estimated budget of approximately $28 million and subsequent to year-end the Township has utilized an interest-only construction loan which has a limit of $28 million, of which $350,000 has been drawn as of July 15, 2025." The note adds that "When construction is complete the construction loan will be transferred into a debenture."
Capital project summary, General Government: "Municipal Administration Building (PWR-034-23)", 2026 total cost 9,741,000, with funding amounts of (515,000) and (9,226,000) and the note "Debt Financing Reserve, Loan Financing".
Capital detail "02-300 Public Works Admin - Capital", "Municipal Administration Building (PWR-034-23) (Inc. Carry-Over)": contracted services 14,690,478, engineering fees 23,379, bank interest on financing 758,954 (offset by a transfer from the debt-financing reserve of (758,954)), and a loan of (14,713,857). Expenditures 15,500,892, loan (14,713,857). The page does not use the name "TTAC".
Of the 48 cents per dollar that the Township receives, the sheet lists "TTAC (debt financing): 2 cents". Elsewhere the Township describes "the continuation of the construction of the new Township of Tiny Administrative Centre (TTAC)" as a 2026 budget highlight.
$5,038,000cost of two properties, financed by donations and a $4.5 million two-year bank loan
The 2024 statements say that after year-end the Township agreed to buy two properties for $5,038,000, financed by donations and by a two-year bank loan of $4.5 million with monthly instalments of $21,250, including interest at 3.91% a year. Over 24 months those instalments add up to about $510,000 (worked out by us), far less than $4.5 million, so most of the loan would still be owing at the end of the two years unless it is repaid another way. The statements do not say how. The 2026 budget has a capital project called "Axler Block Development" with loan interest of $166,950. The pages we read do not say whether that is the same purchase.
Why it matters
A short loan with small monthly payments usually ends in a large final payment. Residents should know where that money is coming from (donations, the sale of land, reserves or a new loan) before it comes due.
It could be because…
The donations mentioned in the note may be large enough to repay most of the loan when they are received.
The Township may plan to sell some of the land, or to turn the loan into longer-term debt before it comes due.
The $21,250 may be a payment on the early part of the loan only, with a different schedule to follow.
The Axler Block project may be a different property altogether.
Questions you could ask
What is the plan to repay the $4.5 million loan when it comes due, and how much of it has been repaid so far?
Is the Axler Block Development the same purchase as the two properties in the 2024 statements?
How much donation money has been received for the purchase, and where is it held?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
Note 6, Subsequent Events: "Subsequent to year-end the Township entered an agreement to purchase two properties at a cost of $5,038,000 to be financed by donations as well as a two year bank loan of $4.5 million to TD Canada Trust with repayments in monthly instalments of $21,250, including interest at 3.91% per annum."
Capital detail "Axler Block Development" (02-110-2140): loan interest 166,950, consulting fees 44,000, contracted services 61,500, legal fees 3,000, funded by a transfer from the capital reserve of (108,500) and from the debt-financing reserve of (166,950). The capital summary lists it at 275,450, funded from "Capital Reserve, Debt Financing Reserve".
Township of Tiny 2026 Budget · Capital detail, 02-110 General Government (Admin) - Capital, PDF page 67; summary on PDF page 64
$900,000put into the debt-financing reserve in 2026, against $925,904 of interest taken out (worked out by us)
A reserve is money saved for a set purpose. The Township keeps a debt-financing reserve to pay interest on its building loans. The 2026 budget puts $900,000 into it. The same budget takes out $758,954 for interest on the administration building and $166,950 for the Axler Block Development, which comes to $925,904 (worked out by us), $25,904 more than goes in. The loans are still growing, so the interest bill may grow with them. The Township pays this interest from the reserve rather than directly from the year's taxes.
Why it matters
Paying interest from a reserve keeps this year's tax bill lower, but a reserve can run out. If the loans keep growing, the amount that has to come from the tax levy later will grow too.
It could be because…
The reserve may have a large balance from earlier years, so a small draw-down in one year may be planned.
Council may plan to raise the yearly transfer as the loans grow.
Interest on a construction loan is a cost of building the asset, and Councils often pay it from a dedicated reserve until the loan becomes a long-term debenture.
Questions you could ask
What is the balance of the debt-financing reserve today, and how long will it last at the planned rate of draw-down?
When the building loan becomes a debenture, will its payments come from the tax levy, and by how much will the levy have to rise?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
Capital summary: "110-6000-80028 Debt-Financing Reserve Allocation" 900,000. Administration building detail: bank interest on financing 758,954 with a transfer from the debt-financing reserve of (758,954). Axler Block Development: loan interest 166,950 with a transfer from the debt-financing reserve of (166,950).
Township of Tiny 2026 Budget · Capital summary PDF page 64; Municipal Administration Building detail PDF page 71; Axler Block Development detail PDF page 67
$811,494"Other" revenue in 2024, against a budget of $201,135
The 2024 budget for "Other" revenue was $201,135. The audited actual was $811,494. Investment income was also well above plan: budgeted at $197,000, it came in at $458,696. The notes break down the "other" line: "Donations, rents, sale of publications, etc." was $445,577, up from $61,768 in 2023. Total revenue was $26,859,839 against a budget of $25,839,674. The statements do not say what the donations were for.
Why it matters
Money that arrives far above the budget can be a sign of a cautious budget or of a one-time gift. Either way, residents deserve to know whether it was spent on what the donors intended and whether it will repeat.
It could be because…
A one-time donation, for example toward the property purchase described in the statements' note on events after year-end, could explain most of the jump.
Municipalities often budget investment income cautiously, because interest rates and markets are hard to predict.
"Sampling and recoveries" were $309,517 and may vary a lot from year to year.
Questions you could ask
What were the donations of $445,577 in 2024 for, and has the money been used as the donors intended?
Does the Township expect donations and recoveries at this level again, and is that built into the 2026 budget?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
The evidence
Statement of operations: "Investment income" budget 197,000, actual 458,696 (2023 actual 469,021). "Other (Note 15)" budget 201,135, actual 811,494 (2023 actual 278,105). "TOTAL REVENUE" budget 25,839,674, actual 26,859,839 (2023 actual 24,377,453).
$2,468,425general government salaries, wages and benefits in 2024, up from $2,122,334 in 2023
The "general government" part of the budget covers council, human resources and general administration. Its salaries, wages and benefits were $2,468,425 in 2024, up from $2,122,334 in 2023, a rise of about 16.3% (worked out by us). Its operating expenses rose about 16.6% (worked out by us), from $727,640 to $848,685. For the whole Township, salaries, wages and benefits rose about 6.9% (worked out by us), from $9,681,714 to $10,353,154. We did not find the Township's own explanation in the statements or the budget book.
Why it matters
Pay and benefits are the largest cost in most municipal budgets. A jump in one department that is much faster than the Township's overall rise is worth a plain explanation, such as new positions, a new pay scale or one-time costs.
It could be because…
The Township may have added positions in the department as its work grew, including work on the new administration centre.
A new pay scale, job evaluation or pay-equity adjustment could raise the cost across many staff at once.
Costs may have moved between departments in how the statements divide them up, and the statements say some comparative figures were reclassified.
OMERS pension contributions also rose about 9.5% (worked out by us), from $640,588 to $701,379, which suggests pay rose across the Township.
Questions you could ask
What accounts for the rise in general government salaries, wages and benefits between 2023 and 2024: new positions, a new pay scale or one-time costs?
How many full-time positions did the Township have at the end of 2023 and 2024?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
The evidence
Schedule 2, 2024, General Government: "Salaries, wages and benefits" 2,468,425; "Operating expenses" 848,685; total salaries, wages and benefits for all segments 10,353,154.
Schedule 3, 2023, General Government: "Salaries, wages and benefits" 2,122,334; "Operating expenses" 727,640; total salaries, wages and benefits for all segments 9,681,714.
Note 11: "The amount contributed to OMERS for the current year was $701,379 (2023 $640,588) for current service and is included as an expense on the Consolidated Statement of Operations."
3.99per cent blended tax rate increase for 2026, as stated by the Township
In 2024 "net municipal taxation" (the Township's own share of the tax bill, after what it collects for the County and the school boards) was $17,204,881, up from $15,848,771, a rise of about 8.6% (worked out by us). For 2026 the Township says Council approved a 3.99 per cent increase in the blended rate (Township, County and school taxes together). The 2026 budget also uses $508,000 transferred from prior years' surplus. The Township's own explanation is that the budget is built on its Asset Management Plan, and its web page says the increase may be reduced in the spring once the 2025 surplus is known. We did not find a posted update to say whether it was.
Why it matters
Paying for a $28 million building while keeping tax increases low is a balancing act. Using surplus from past years to lower this year's increase helps now, but the same money cannot be used again next year.
It could be because…
Part of the 2024 rise may come from new homes and supplementary assessments, not from higher rates.
The 2024 and 2026 figures measure different things: 2024 is a share of the whole bill after the County and school boards are taken out, and 2026 is the blended rate for everything on the bill.
Using surplus to lower a tax increase is a common choice, and the Township says it may reduce the increase further.
Questions you could ask
What was the final 2026 tax rate increase after the 2025 surplus was known, and how much of the 2025 surplus was used?
How much of each year's tax increase over the next five years is for paying the administration centre loan?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
The evidence
Note 13, Net municipal taxation: taxation revenue 37,118,247 (2023: 35,289,415), less amounts levied and remitted to school boards (6,916,036) and to the County of Simcoe (12,997,330), equals net municipal taxation 17,204,881 (2023: 15,848,771).
"The Township of Tiny Council approved the 2026 Budget at its Regular Meeting on January 7, 2026, resulting in a 3.99 per cent blended tax rate increase"; for an average home assessed at $350,000 this is "approximately $7.11 per month on the municipal portion of the tax bill." The page adds: "Following 2025 year-end surplus calculations, the budget may be further reduced in the spring leading to a lower final tax rate increase for 2026."
Tiny spent $1.7M on water, sewers and garbage in 2019 and $2.9M in 2024. Prices only went up about 18% in that time.
Why did the cost of water, sewers and garbage grow 75% in 5 years?
Water, sewers and garbage
Prices (inflation)
+0%+20%+40%+60%+80%
+75%
201920202021202220232024
Show as a table
Year
Water, sewers and garbage
Prices (inflation)
2019
+0%
+0%
2020
+12%
+1%
2021
+24%
+4%
2022
+40%
+11%
2023
+56%
+16%
2024
+75%
+18%
Change since the first year shown. The grey line is how much prices rose overall, for comparison.
Why it matters
When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.
It could be because…
The town added a service, a building or staff that residents asked for.
Costs were moved from another area, so the total did not really change.
Accounting rules changed how costs are sorted.
Large one-time costs, like a study, lawsuit or repair, landed in one year.
Questions you could ask
What did the extra $1.3M a year pay for?
Why did other environment go from $119K to $686K?
Was each increase approved by council as a separate decision, or did it happen through the yearly budget?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
5recommendations from the Ombudsman, including accurate meeting notices, complete minutes and training
The Ontario Ombudsman is the independent officer who checks whether councils follow the rules for open meetings. In October 2023 the Ombudsman found that the Town of Midland, the Town of Penetanguishene and the Township of Tiny broke the open-meeting rules on April 19, 2022. The public notice for a joint airport task force presentation did not give up-to-date information on how to watch it online, and no minutes were kept. Tiny's council, with Penetanguishene's, disagreed with the Ombudsman's view that the task force was a committee of the municipalities. The Ombudsman made five recommendations, including training for committee members. The Township posts the report on its website.
Why it matters
Open-meeting rules are how residents see what their council is doing. An official finding is a reason to ask what has changed, even though this was one meeting held jointly with two other councils, three years ago.
It could be because…
The three councils shared the finding. The notice was prepared jointly, and the town of Penetanguishene took the lead in arranging the broadcast.
The Ombudsman reported full co-operation during the investigation, and Tiny's council may already have acted on the recommendations.
The television network told Penetanguishene staff on the day that it would not broadcast, so the failure of the advertised link was partly outside the councils' control. The Ombudsman's fourth recommendation is about checking on third parties for this reason.
Questions you could ask
What did Council do to carry out the Ombudsman's five recommendations, and is that written down in a public report?
Do notices for committee meetings now say how the public can attend, and are minutes kept for every committee?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Tiny?Send us your answer and we will publish it with this question.
The evidence
The Ombudsman "determined that the Town of Midland, Town of Penetanguishene, and Township of Tiny contravened the open meeting rules on April 19, 2022, by failing to ensure that the public notice for the Huronia Airport Task Force's meeting provided up-to-date information about how the public could access the virtual meeting." The report also found that "the three municipalities failed to record meeting minutes."
"In their responses, the councils for the Town of Penetanguishene and the Township of Tiny both disagreed with my finding that the Task Force was a committee of each of the municipalities, and instead felt the Task Force was a committee of the Commission." The Ombudsman replied that the meeting records "clearly" show the Task Force "was originally conceived of and created by the three municipalities."
Recommendations 2 to 5: accurate and up-to-date information on how the public can attend all meetings including committee meetings; complete and accurate records of all meetings; procedures to confirm a third party will fulfil open-meeting duties; and training for committee and local board members on the open meeting requirements.