Council BooksWasaga BeachOntarioSign inSubscribe
Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you
Read by hand. We read Wasaga Beach's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.

The money · 2025

How Wasaga Beach's money works

A town is a bit like a household. Money comes in (mostly taxes and grants), and money goes out to pay for services like roads, fire trucks and the arena. Here is what that looked like in 2025, the latest year the town has reported to the Province.

Why 2025 and not this year? A budget is a plan. These figures are what actually happened, checked by an auditor and reported to Ontario.

Money in: $105M

Where the town's money came from in 2025.

Wasaga Beach revenue by source, 2025
  • Property taxes$39.5M38%
  • Grants for specific projects$9.0M9%
  • Fees people pay$15.5M15%
  • Other$35.7M34%
  • Everything else$4.5M4%
Show as a table
CategoryAmountShare
Property taxes$39,490,22337.9%
Grants for specific projects$9,046,4558.7%
Fees people pay$15,490,82914.9%
Other$35,661,71834.2%
Everything else$4,472,5364.3%
Total$104,161,761100%

What each source means

Property taxes
What home and business owners pay each year, based on what their property is worth.
Grants for specific projects
Money from Ontario or Canada that must be spent on a certain thing, often a road or building.
Fees people pay
Water and sewer bills, dump fees, arena rentals, permits and similar charges.
Other
Interest earned, donations, sales of land and equipment.

Money out: $52.7M on services

Day-to-day spending in 2025, by service. On top of this, the town recorded $11.2M of "wear and tear" on things it owns. That is an accounting cost, not cash out the door, so it is left out here.

Wasaga Beach spending by service, 2025
  • Running the town office$11M21%
  • Police, fire and safety$13.4M26%
  • Roads and snow$8.5M16%
  • Water, sewers and garbage$6.1M12%
  • Health$409K1%
  • Social services$115K0%
  • Housing$3,6880%
  • Parks, arena and library$10.4M20%
  • Planning and business$2.7M5%
Show as a table
CategoryAmountShare
Running the town office$10,975,15920.8%
Police, fire and safety$13,446,89225.5%
Roads and snow$8,503,79216.1%
Water, sewers and garbage$6,070,86311.5%
Health$408,5500.8%
Social services$114,7770.2%
Housing$3,6880.0%
Parks, arena and library$10,421,60619.8%
Planning and business$2,744,3495.2%
Total$52,689,676100%

Police, fire and safety

$13.4M

Paying for police, the fire department, building inspectors and by-law officers.

+33% since 2019 (prices rose 21%)

Police, fire and safety broken down
  1. Police (OPP contract)$5.7M+18%

    What the town pays for policing.

  2. Fire department$5.2M+36%

    Firefighters, trucks and fire halls.

  3. By-law and animal control$1.2M+100%

    Enforcing town rules, like noise, parking and dogs.

  4. Building permits$991K+51%

    Checking that new buildings are safe.

  5. Conservation authority$352K+44%

    A regional group that manages rivers, flooding and wetlands.

Show as a table
ItemAmountChange
Police (OPP contract)$5,730,439+18.2%
Fire department$5,166,968+36.2%
By-law and animal control$1,207,202+100.0%
Building permits$990,601+51.5%
Conservation authority$351,682+44.0%

Running the town office

$11M

Council, managers, the clerk, accounting, computers, insurance and the town hall itself. Every town needs some of this, but it does not fix a road or put out a fire.

+191% since 2019 (prices rose 21%)

Running the town office broken down
  1. Senior management$7.1M+476%

    The top managers who run the town day to day.

  2. Office and administration$3.4M+60%

    Office staff, finance, IT, insurance, legal and the town hall. Towns share this cost out across other services.

  3. Council$459K+17%

    Pay and expenses for the mayor and councillors, and council meetings.

Show as a table
ItemAmountChange
Senior management$7,099,748+475.5%
Office and administration$3,416,431+59.5%
Council$458,980+17.1%

Parks, arena and library

$10.4M

Parks, the arena, the pool, sports fields, programs and the library.

+120% since 2019 (prices rose 21%)

Parks, arena and library broken down
  1. Arena and buildings$4.8M+152%

    The arena, pool, community centre and halls.

  2. Parks$2.3M+86%

    Parks, beaches, trails and green spaces.

  3. Library$1.7M+138%

    The public library.

  4. Programs$1.6M+84%

    Classes, camps and activities.

  5. Arts and culture$21,289

    Festivals, arts and heritage.

Show as a table
ItemAmountChange
Arena and buildings$4,752,902+151.6%
Parks$2,343,142+85.6%
Library$1,720,236+138.3%
Programs$1,584,037+83.8%
Arts and culture$21,289–

Roads and snow

$8.5M

Fixing and paving roads, bridges and culverts, ploughing snow, and street lights.

+51% since 2019 (prices rose 21%)

Roads and snow broken down
  1. Paved roads$4.5M+62%

    Fixing and repaving paved roads.

  2. Snow ploughing$1.7M+55%

    Ploughing, salting and sanding roads in winter.

  3. Public transit$783K+13%

    Buses.

  4. Roadsides and signs$466K+32%

    Ditches, signs, line painting and roadside brush.

  5. Parking$452K+43%

    Town parking lots and meters.

  6. Street lights$285K+6%

    Power and repairs for street lights.

  7. Accessible transit$162K

    Rides for people who cannot use regular buses.

  8. Bridges and culverts$54,263

    Keeping bridges and the pipes under roads safe.

  9. Other transportation$51,935+17%

    Other transportation costs.

Show as a table
ItemAmountChange
Paved roads$4,517,606+61.8%
Snow ploughing$1,732,766+54.8%
Public transit$782,560+12.8%
Roadsides and signs$465,620+32.4%
Parking$452,034+43.0%
Street lights$284,692+6.4%
Accessible transit$162,316–
Bridges and culverts$54,263–
Other transportation$51,935+17.2%

Water, sewers and garbage

$6.1M

Clean tap water, the sewer system, garbage pickup, the dump and recycling.

+44% since 2019 (prices rose 21%)

Water, sewers and garbage broken down
  1. Sewer pipes$2.3M+45%

    The pipes that carry sewage away from homes.

  2. Water pipes$1.9M+95%

    The pipes that bring water to homes.

  3. Sewage treatment$1.1M+36%

    Cleaning sewage before it goes back into nature (Tweed uses lagoons).

  4. Water treatment$563K+20%

    Making lake or well water safe to drink.

  5. Garbage pickup$135K+52%

    Trucks that collect garbage.

  6. Rural drainage$108K−60%

    Ditches and drains in the countryside.

  7. Recycling$11,646

    Recycling and composting.

Show as a table
ItemAmountChange
Sewer pipes$2,307,948+44.8%
Water pipes$1,876,573+94.5%
Sewage treatment$1,068,202+36.2%
Water treatment$562,952+20.1%
Garbage pickup$135,438+51.8%
Rural drainage$108,104−60.0%
Recycling$11,646–

Planning and business

$2.7M

Deciding what can be built where, and trying to bring businesses and visitors to town.

+22% since 2019 (prices rose 21%)

Planning and business broken down
  1. Planning and zoning$1.5M+62%

    Deciding what can be built where.

  2. Business and tourism$1.2M−6%

    Attracting businesses and visitors, and helping local shops.

Show as a table
ItemAmountChange
Planning and zoning$1,519,683+61.8%
Business and tourism$1,224,666−6.3%

Health

$409K

Public health, ambulances and cemeteries.

+100% since 2019 (prices rose 21%)

Health broken down
  1. Public health$337K+86%

    Health inspections and programs.

  2. Cemeteries$71,701

    Looking after town cemeteries.

Show as a table
ItemAmountChange
Public health$336,849+86.0%
Cemeteries$71,701–

Social services

$115K

Help for people and families who need it, and child care.

+1% since 2019 (prices rose 21%)

Social services broken down
  1. Seniors$114K+5%

    Long-term care and seniors programs.

  2. Other social$1,264

    Other social services.

Show as a table
ItemAmountChange
Seniors$113,513+5.0%
Other social$1,264–

Housing

$3,688

Affordable and social housing.

+43% since 2019 (prices rose 21%)

Housing broken down
  1. Other housing$3,688

    Other housing costs.

Show as a table
ItemAmountChange
Other housing$3,688–

What the money bought

The same 2025 spending, sorted by what it paid for rather than which service.

Spending by type
  1. Staff pay and benefits$26.8M

    Wages, benefits and pensions for town workers.

  2. Outside companies$13.8M

    Work the town pays other companies to do, like policing, paving or consultants.

  3. Supplies and utilities$9.5M

    Gravel, salt, fuel, electricity, heating, office supplies and repairs.

  4. Rent and money costs$1.4M

    Renting equipment or space, bank fees, and some accounting costs.

  5. Money given to others$769K

    Grants and payments to other groups, like the conservation authority.

  6. Interest on loans$420K

    The extra money paid to lenders for money the town borrowed.

Show as a table
ItemAmount
Staff pay and benefits$26,793,223
Outside companies$13,801,954
Supplies and utilities$9,516,717
Rent and money costs$1,388,154
Money given to others$769,297
Interest on loans$420,331

Staff

People on the town's payroll at the end of each year, as reported to the Province.

YearFull-timePart-timeSeasonal
20191363466
20201472769
20211642460
20221662268
20231823979
20241854669
20251874976

How things have changed since 2019

Money in compared with day-to-day spending, each year. When the orange line is above the blue one, the town spent more than it took in and made up the difference from savings or loans. Grants for big projects arrive in some years and not others, which makes "money in" jump around.

Money in and day-to-day spending by year
$105M
Show as a table
YearMoney inDay-to-day spending
2019$52.6M$31.1M
2020$49.6M$32.3M
2021$64.5M$34.1M
2022$66.1M$37M
2023$65.6M$40.9M
2024$79M$49.2M
2025$105M$52.7M

Town property tax

Up 65% since 2019. Prices rose 21%.

Town property tax by year
$39.5M
Show as a table
YearTown property tax
2019$23.9M
2020$25.7M
2021$28.1M
2022$29M
2023$33.1M
2024$36.9M
2025$39.5M

Savings (reserves)

Money set aside for repairs, equipment and emergencies.

Reserves by year
$45.9M
Show as a table
YearSavings
2019$40.7M
2020$42.5M
2021$48.7M
2022$42.4M
2023$39M
2024$38.5M
2025$45.9M

What the town owes

Long-term loans plus short-term (temporary) loans at year end.

Debt by year
$12.9M
Show as a table
YearLong-term loansTemporary loans
2019$13.4M$0
2020$13.2M$0
2021$12.3M$3.0M
2022$14.2M$5.0M
2023$12.7M$17M
2024$11.3M$17M
2025$12.9M$17M

Building new things

Spending on new or rebuilt roads, pipes, buildings and equipment, compared with how fast existing ones wear out.

Capital spending and wear by year
$52.9M
Show as a table
YearBuilt or boughtWore out (amortization)
2019$23.6M$7.2M
2020$6.5M$7.2M
2021$22.6M$7.5M
2022$15.5M$7.6M
2023$69.8M$9.0M
2024$14.5M$10.4M
2025$52.9M$11.2M

Source: Ontario Financial Information Return (FIR), Schedules 10, 40, 51, 60, 70, 74 and 80 (archived copy). Ontario Ministry of Municipal Affairs and Housing. Retrieved 2026-10-01. Figures are what the municipality reported to the Province for each year, prepared on the same basis as its audited financial statements.