$210 millionshortfall the Township reports between 10-year growth costs and expected development charge and grant revenue
Development charges are fees builders pay so that growth pays for new roads, pipes and fire halls. The 2026 budget says the 10-year growth costs in the 2024 study "exceed $330 million" against expected development charge and grant revenue of $115 million, "which leaves a $210 million shortfall". It says that level of spending "simply could not be supported". The development charge accounts for water, wastewater and fire are overdrawn and are borrowing from the roads account: the budget estimates $4,617,386 owed between the accounts at the end of 2026. The development charge reserves held $3,936,353 at the end of 2024 and are planned to fall to $1,462,241 in 2026. The Township explains this and has begun a new growth plan.
$788,446wastewater operating reserve overdrawn at the end of 2025 (revised estimate), in the 2026 budget
Wastewater is the sewer system, paid for by sewer rates rather than property tax. The 2026 budget's reserve table shows the "Wastewater - Operating" reserve overdrawn by $788,446 at the end of 2025 (revised estimate) and $608,446 at the end of 2026, and the "Wastewater - Capital" reserve overdrawn by $120,245 at the end of 2026. The budget says the Township "has also experienced large operating deficits in the water and wastewater operating budgets" and says reserves improved. The rates document raises the wastewater operating contingency contribution to $320,000, but the reserve table shows a 2026 contribution of $180,000. The rates document prints the 2026 wastewater rate as 3.97, up from 3.72.
+11%town property tax, 2023 to 2024
In 2024, Woolwich collected $1.6M more in its own property tax than in 2023. That is a 11% jump, while prices went up about 2.4%. Only 6 of 42 similar towns raised theirs by more. Almost all of it came from a higher tax rate (up 8% for homes); the value of homes on the tax roll grew only 2.9%.
+47%parks, arena and library, 2019 to 2024
Woolwich spent $5.0M on parks, arena and library in 2019 and $7.4M in 2024. Prices only went up about 18% in that time. Only 8 of 42 similar towns had faster growth here.
+108%water, sewers and garbage, 2019 to 2024
Woolwich spent $1.6M on water, sewers and garbage in 2019 and $3.3M in 2024. Prices only went up about 18% in that time.
$1,411,643total estimated tax increase for 2026 (7.8%), of which the base budget is $516,737 (2.9%)
The 2026 budget was the first "strong mayor" budget in Woolwich. The Mayor says the base increase is "about $3.05 per month for the average household or 2.9%". After new requests, fixing past under-budgeting, new reserve contributions and a 1% infrastructure levy, the printed total is a 7.8% increase, or $1,411,643. The Township explains each piece. Among them: $273,294 to correct labour and equipment cost allocation that, in the last three years, left the engineering administration line $315K, $420K and $342K over. Staff reported a tax supported operating deficit of $426,738 for 2025, after a surplus of $216,544 for 2024. This is an explained question: the open part is whether the new numbers will hold.
$100 million10-year infrastructure gap the Township's asset management identified
The Township sets money aside each year for roads, bridges and buildings through the infrastructure levy, a part of the tax bill. The 2026 budget says a 2012 study found "a levy of between 3-4% per year was required", and that the Township's asset management "identified a 10-year infrastructure gap of over $100 million". The 2026 budget adds a 1% increase, about $180,000, to reach $2.54M. The budget also says some projects were cut or cannot go ahead: the road conversion program estimate fell from $6.5M, and a $2,500,000 arena project has "Insufficient funding". The Township is open about this and says only the first year of its 10-year plan is "adequately vetted and funded".
October 10, 2025date of the auditor's report on the 2024 statements, the latest posted on October 5, 2026
Audited financial statements are the check, by an outside accounting firm, on the Township's books. KPMG LLP signed its opinion on the 2024 statements on October 10, 2025, and on the 2023 statements on November 20, 2024. Both opinions say the statements "present fairly" the Township's position. On October 5, 2026, the Township's financial reporting page listed 2020 to 2024 audited statements and no 2025 statements. The 2026 budget was prepared in autumn 2025, before the 2025 books were closed, so it used estimates for the end of 2025.