Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you Read by hand. We read Champlain's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.
Questions · 9 so far
Things worth asking about
We read Champlain's financial reports and meeting minutes, and compared its numbers with 46 similar Ontario towns. These are the things that stood out.
What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer
Needs an answer
These are unusual enough that residents deserve a clear answer from council.
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Champlain had $4.8M saved at the end of 2025, up from $4.0M in 2019. That is 34% of one year's spending. None of the 46 similar towns had less, compared with what they spend.
Found automatically from the town's financial reports · 4 sources
Worth asking
Worth asking
There may well be a good reason. It is still worth asking what it is.
$7,160,783spent on contracted services in 2023, against a budget of $5,103,470
"Contracted services" is money paid to outside companies to do work for the Township, such as running water systems or collecting garbage. In 2023 the budget was $5,103,470 and the audited statements show $7,160,783. In 2024 the budget was $5,246,290 and the statements show $6,467,025. In 2025 the budget was $5,115,407 and the statements show $5,514,915. The gap was about $2.06 million in 2023, $1.22 million in 2024 and $0.40 million in 2025 (worked out by us). It is shrinking, but it has been over every year. We did not find the Township's own explanation, because its budget reports are behind a browser check we do not get around.
Found by reading the town's own documents · 3 sources
$1,528,653spent on planning and zoning in 2023, against a budget of $280,281
Planning and zoning covers land-use decisions such as rezoning requests. In 2023 the budget was $280,281 and the audited statements show $1,528,653. In 2024 the budget was $338,573 and the statements show $1,021,452. In 2025 the budget was $263,731 and the statements show $402,904. That is about 5.5 times the budget in 2023 and 3 times in 2024 (worked out by us), then a much smaller gap in 2025. The statements do not say what the extra money paid for.
Found by reading the town's own documents · 4 sources
$1,834,524landfill closure liability at the end of 2025, up from $652,811
The Township opened a landfill in September 2006 and must, by law, close it and look after it for years afterwards. The statements carry that future cost as a liability (money owed later). It stood at $652,811 at the end of 2024 and $1,834,524 at the end of 2025. Almost all of the rise, $1,152,860, is labelled "Remeasurement", meaning the Township re-estimated the cost. The statements also show $1,586,676 of it as "unfinanced", meaning no money has been set aside or raised for it yet (it was $433,816 a year earlier).
Found by reading the town's own documents · 2 sources
$289,527moved into reserves in 2025, against a budget of $967,706
Reserves are savings set aside for later needs, such as trucks or repairs. The 2025 budget planned net transfers to reserves of $967,706 and an end-of-year balance of $5,482,046. The audited result was $289,527 and $4,807,729. The fire department reserve fell from $253,287 to $41,005 over the same year. In 2025 the Township spent $1,441,787 on vehicles, which may be part of the reason.
Found by reading the town's own documents · 3 sources
$1,892,195negative "unfinanced operation" balance at the end of 2025, up from $734,366 at the end of 2022
In its list of what makes up the Township's accumulated surplus (its net worth on paper), one line is a negative number called "Unfinanced operation". It was $734,366 negative at the end of 2022, $1,352,042 at the end of 2023, $1,745,550 at the end of 2024 and $1,892,195 at the end of 2025. We found no note in the statements that says what it contains.
Found by reading the town's own documents · 3 sources
$2,856,150surplus in the 2025 budget, against $870,443 in the audited result
A surplus is what is left when a year's revenue is more than its spending. The 2025 budget in the statements planned a surplus of $2,856,150. The audited result was $870,443. Most of the gap is explained by one line: the budget column shows no amount for amortization (the yearly wearing out of buildings, roads and vehicles), while the actual column shows $1,995,502. Without amortization, actual spending was about $14.21 million against a budget of $14,307,326 (worked out by us), so day-to-day spending came in a little under budget. Total revenue was $17,080,814 against a budget of $17,163,476. Note 14 says budget figures are presented "on a basis consistent with the presentation of actual figures", yet the amortization line is blank in the budget column.
Found by reading the town's own documents · 2 sources
$3,859,135from the province in 2023, down to $1,828,123 in 2025
Transfers are money other governments pay the Township. The province paid $3,859,135 in 2023, $2,549,327 in 2024 and $1,828,123 in 2025. "Other municipalities" paid $1,702,874 in 2023, $603,156 in 2024 and $445,928 in 2025. Together that is about $5.56 million in 2023 and about $2.27 million in 2025 (worked out by us). Total revenue fell from $20,828,711 to $17,080,814 over the same two years. The 2023 statements also show a "Social and family services" expense of $1,705,309, close to the 2023 payment from other municipalities. That line is not in the 2024 or 2025 statements.
Found by reading the town's own documents · 2 sources
Each question in full
Needs an answerFound automatically from financial reports
Towns keep savings (called reserves) to pay for new trucks, roof repairs and surprises. Champlain had $4.8M saved at the end of 2025, up from $4.0M in 2019. That is 34% of one year's spending. None of the 46 similar towns had less, compared with what they spend.
Does Champlain have enough saved for repairs and emergencies?
$0$1.0M$2.0M$3.0M$4.0M$5.0M
$4.8M
2019202020212022202320242025
Show as a table
Year
Savings (reserves)
2019
$4.0M
2020
$4.0M
2021
$4.7M
2022
$4.9M
2023
$4.6M
2024
$4.5M
2025
$4.8M
Why it matters
With little saved, a broken bridge or a storm has to be paid for with a sudden tax increase or a loan. Low savings can also mean past budgets were balanced by spending savings instead of facing the real cost.
It could be because…
The town spent savings on purpose, on projects that were planned and saved up for.
Some savings were used to match grant money, which brings in more than it costs.
The town has a plan to rebuild its savings.
Questions you could ask
Does the town have a written reserve policy with a target amount?
What were the savings spent on between 2019 and 2025?
What is the plan to rebuild them, and by when?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
Schedule 3: reserves and reserve funds at the end of 2025, budget 5,482,046, actual 4,807,729; net transfers to reserves budget 967,706, actual 289,527.
$7,160,783spent on contracted services in 2023, against a budget of $5,103,470
"Contracted services" is money paid to outside companies to do work for the Township, such as running water systems or collecting garbage. In 2023 the budget was $5,103,470 and the audited statements show $7,160,783. In 2024 the budget was $5,246,290 and the statements show $6,467,025. In 2025 the budget was $5,115,407 and the statements show $5,514,915. The gap was about $2.06 million in 2023, $1.22 million in 2024 and $0.40 million in 2025 (worked out by us). It is shrinking, but it has been over every year. We did not find the Township's own explanation, because its budget reports are behind a browser check we do not get around.
Why it matters
A budget is the promise made to taxpayers about what a year will cost. Outside contracts are the Township's biggest spending line, bigger than salaries and benefits, so a repeated overrun matters.
It could be because…
Some of the work may have been paid for by provincial or federal grants that arrived during the year and were not in the budget. Provincial transfers in 2023 were $3,859,135 against a budget of $3,576,006.
The Township says it has contracts for water operation, garbage collection and disposal, and water supply (Note 8). Prices on those contracts may have risen more than the budget allowed.
Repair or study work that was not planned in the budget may have been done by outside firms.
The 2023 statements also show a "Social and family services" line of $1,705,309 that is not in 2024, so part of the early gap may be a service that moved elsewhere.
Questions you could ask
What work made up the contracted services spending in 2023, 2024 and 2025, and which jobs went over budget?
How much of each year's overrun was paid for by grants that were not in the budget?
Has the 2026 budget for contracted services been set closer to what the Township has actually spent?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Note 11, Expenses by object, 2023: "Contracted services" budget 5,103,470, actual 7,160,783 (2022 actual 5,742,231).
Note 10, Expenses by object, 2025: "Contracted services" budget 5,115,407, actual 5,514,915 (2024 actual 6,467,025). Note 8 lists contracts: solid waste collection, estimated disbursements over the next five years total $2,922,000; Ontario Clean Water Agency water operation, $684,000 over the next year.
$1,528,653spent on planning and zoning in 2023, against a budget of $280,281
Planning and zoning covers land-use decisions such as rezoning requests. In 2023 the budget was $280,281 and the audited statements show $1,528,653. In 2024 the budget was $338,573 and the statements show $1,021,452. In 2025 the budget was $263,731 and the statements show $402,904. That is about 5.5 times the budget in 2023 and 3 times in 2024 (worked out by us), then a much smaller gap in 2025. The statements do not say what the extra money paid for.
Why it matters
Planning costs can rise with growth, and some of them are paid back by developers' fees. But a line that is several times its budget two years running is a sign the budget is not tracking what the Township actually does.
It could be because…
Fees paid by people applying for rezoning or severances may have covered much of the cost. User fees were above budget in each of the three years.
Outside planners or lawyers may have been hired for large applications. The Township announced a closed meeting on December 18, 2025 about an appeal to the Ontario Land Tribunal on a rezoning application, so legal costs may be part of the story. We cannot tell from the statements whether they were.
The Township may have taken on a one-time planning project, such as an official plan update.
Questions you could ask
What did the $1,528,653 spent on planning and zoning in 2023 and the $1,021,452 in 2024 pay for?
How much of it was paid back through planning fees, and how much came from taxes?
How much has the Township spent on outside lawyers and planners for appeals to the Ontario Land Tribunal?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Statement of operations, 2023: "Planning and zoning" budget 280,281, actual 1,528,653 (2022 actual 667,480).
The Township's notice of December 15, 2025 says council will hold a special meeting on December 18, 2025 for closed meeting discussions regarding a "Litigation – Appeal to the Ontario Land Tribunal" about a rezoning application.
$1,834,524landfill closure liability at the end of 2025, up from $652,811
The Township opened a landfill in September 2006 and must, by law, close it and look after it for years afterwards. The statements carry that future cost as a liability (money owed later). It stood at $652,811 at the end of 2024 and $1,834,524 at the end of 2025. Almost all of the rise, $1,152,860, is labelled "Remeasurement", meaning the Township re-estimated the cost. The statements also show $1,586,676 of it as "unfinanced", meaning no money has been set aside or raised for it yet (it was $433,816 a year earlier).
Why it matters
A future bill that nearly triples shows up as a larger number on the books but not as a larger tax bill. When the work has to be done, taxpayers or fee payers will have to cover it, so the plan for paying it matters now.
It could be because…
Closure costs for landfills often go up when the estimate is redone with current prices, so a one-time jump after updating the estimate is common.
The statements say the work happens over 25 years, so the money may not be needed for a long time.
The Township may plan to pay for it through the garbage fees or a future reserve. We did not find a landfill reserve in the list of reserves in the 2025 statements.
Questions you could ask
What new estimate caused the $1,152,860 remeasurement, who prepared it, and when does the Township expect to close the landfill?
Does the Township plan to set aside money each year for closure, and from what source?
Is the cost of closing the landfill included in the garbage fees residents pay?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Note 5: "Liability for asset retirement obligation (ARO)" 1,834,524 in 2025 (652,811 in 2024). Table: balance, beginning of year 652,811; "Remeasurement" 1,152,860; "Increase of the liability for ARO" 28,853; balance, end of year 1,834,524. The note says the Township "opened a landfill site in September 2006".
$289,527moved into reserves in 2025, against a budget of $967,706
Reserves are savings set aside for later needs, such as trucks or repairs. The 2025 budget planned net transfers to reserves of $967,706 and an end-of-year balance of $5,482,046. The audited result was $289,527 and $4,807,729. The fire department reserve fell from $253,287 to $41,005 over the same year. In 2025 the Township spent $1,441,787 on vehicles, which may be part of the reason.
Why it matters
A town that saves less than it planned has less to fall back on when a roof fails or a truck wears out, and it may have to borrow instead.
It could be because…
Some reserves may have been used on purpose to pay for vehicles or other projects, which is what reserves are for.
A planned transfer may not be made when the year's income comes in lower than the budget. Total revenue was $17,080,814 against a budget of $17,163,476.
The Township may have decided to borrow for projects and keep savings in place.
Questions you could ask
Why were transfers to reserves about $678,000 lower than budgeted in 2025, and which transfers were not made?
What did the fire department reserve pay for in 2025?
What reserve balance does the Township aim for, and when does it expect to reach it?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Schedule 3, Reserves and Reserve Funds: "Net transfers to reserves" budget 967,706, actual 289,527 (2024 actual (55,497)). Reserves and reserve funds, end of year: budget 5,482,046, actual 4,807,729 (2024: 4,514,340).
$1,892,195negative "unfinanced operation" balance at the end of 2025, up from $734,366 at the end of 2022
In its list of what makes up the Township's accumulated surplus (its net worth on paper), one line is a negative number called "Unfinanced operation". It was $734,366 negative at the end of 2022, $1,352,042 at the end of 2023, $1,745,550 at the end of 2024 and $1,892,195 at the end of 2025. We found no note in the statements that says what it contains.
Why it matters
A growing negative balance can mean costs that have been recorded but not yet paid for by taxes or fees. If so, they will have to be covered by future budgets.
It could be because…
It may be costs the accounting rules require the Township to record, such as amortization (the yearly wearing out of buildings and roads), that the budget does not tax for.
It may include benefits earned by staff that are paid in later years.
The Township may be covering these costs gradually on purpose.
Questions you could ask
What costs make up the unfinanced operation balance?
Does the Township plan to cover it through future budgets, and over how many years?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Schedule 2: "Unfinanced operation" (1,892,195) in 2025, (1,745,550) in 2024. In the same list "Decrease in taxation" 1,650,365 (1,575,995 in 2024).
Champlain spent about $2,987 per home on long-term debt in 2025. The typical similar town spent $1,066. Only 5 of 46 similar towns spent more.
Why it matters
Spending more than neighbours is not wrong by itself. It might buy better service. But it is the first place to look for costs that could be lower, such as contracts that were not competitively bid.
It could be because…
Geography: more roads, more snow, a bigger area or a landfill of its own.
Accounting: some towns record the same cost in a different category.
A one-time cost in this year.
Questions you could ask
What makes this cost higher here than in similar towns?
When were the main contracts in this area last put out to competitive tender?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Long-term debt per home: Champlain $2,987; typical similar town $1,066; ranked 6th highest of 47.
Note 6, Debts: 12,498,897 at the end of 2025 (12,245,893 in 2024). By who repays it: general taxation 4,514,210, user charges 7,984,687. Principal due in 2026 is 730,603.
Note 4: the Township has "pre-authorized loans for tangible capital assets for a total of $6,500,000", of which $5,345,772 ($3,333,765 in 2024) was unused at year-end.
Item 13.4, By-law 2026-14, "a by-law to authorize the borrowing of monies to finance the Vankleek Hill Arena Rehabilitation Project", was passed on February 26, 2026 (Resolution 2026-087). The minutes do not give an amount, and the by-law file is behind a browser check we did not get around.
$2,856,150surplus in the 2025 budget, against $870,443 in the audited result
A surplus is what is left when a year's revenue is more than its spending. The 2025 budget in the statements planned a surplus of $2,856,150. The audited result was $870,443. Most of the gap is explained by one line: the budget column shows no amount for amortization (the yearly wearing out of buildings, roads and vehicles), while the actual column shows $1,995,502. Without amortization, actual spending was about $14.21 million against a budget of $14,307,326 (worked out by us), so day-to-day spending came in a little under budget. Total revenue was $17,080,814 against a budget of $17,163,476. Note 14 says budget figures are presented "on a basis consistent with the presentation of actual figures", yet the amortization line is blank in the budget column.
Why it matters
Anyone comparing budget with actual by service will see large overruns that are partly just amortization the budget never included. Comparing by service (for example roads or environmental services) is not fair until that is known.
It could be because…
Councils in Ontario often budget on a cash basis and leave out amortization, then the auditors add it back. The statements show the Township follows that pattern.
The Township may publish a fuller budget-to-actual report that sets amortization out line by line. We could not read its budget documents.
Questions you could ask
Does the Township budget for amortization anywhere, and how much does it set aside each year to replace what wears out?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Statement of operations, 2025: total revenues budget 17,163,476, actual 17,080,814; total expenses budget 14,307,326, actual 16,210,371; "Annual surplus" budget 2,856,150, actual 870,443.
Note 10, Expenses by object: "Amortization of tangible capital assets" budget "-", actual 1,995,502 (2024 actual 1,896,644). Note 14 says: "budget figures have been presented on a basis consistent with the presentation of actual figures".
$3,859,135from the province in 2023, down to $1,828,123 in 2025
Transfers are money other governments pay the Township. The province paid $3,859,135 in 2023, $2,549,327 in 2024 and $1,828,123 in 2025. "Other municipalities" paid $1,702,874 in 2023, $603,156 in 2024 and $445,928 in 2025. Together that is about $5.56 million in 2023 and about $2.27 million in 2025 (worked out by us). Total revenue fell from $20,828,711 to $17,080,814 over the same two years. The 2023 statements also show a "Social and family services" expense of $1,705,309, close to the 2023 payment from other municipalities. That line is not in the 2024 or 2025 statements.
Why it matters
If grants are one-time, spending that depended on them may not be repeated, and the Township may need more from taxes or borrowing for the same work.
It could be because…
The 2023 total is likely to include a service the Township ran for other municipalities and that has since moved. The matching sizes of the $1,705,309 expense and the $1,702,874 payment point that way, but the statements do not say so.
Provincial grants often come in lumps for specific projects, so the amount can swing from year to year.
New grants may arrive in later years. We did not find a published list of funding the Township has been promised.
Questions you could ask
Which services or projects did the 2023 provincial and municipal payments cover, and are they continuing?
What provincial funding has the Township been promised for 2026 and 2027?
You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.
Speak for Champlain?Send us your answer and we will publish it with this question.
The evidence
Statement of operations, 2025: Province of Ontario budget 2,418,196, actual 1,828,123 (2024 actual 2,549,327); Other municipalities budget 560,053, actual 445,928 (2024 actual 603,156); total revenues actual 17,080,814.
Statement of operations, 2023: Province of Ontario actual 3,859,135; Other municipalities actual 1,702,874; total revenues actual 20,828,711; "Social and family services" expense actual 1,705,309.
Can we count your visit? With your OK, we use Google Analytics to see which pages help people. It sets cookies and sends visit data to Google. Nothing loads unless you say yes. Privacy