Questions · 9 so far

Things worth asking about

We read Chapple's financial reports and meeting minutes, and compared its numbers with 29 similar Ontario towns. These are the things that stood out.

What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Worth asking

Worth asking

There may well be a good reason. It is still worth asking what it is.

Worth askingRecord-keeping

Why do the summary pages and the detail pages of Chapple's 2025 budget book give different 2024 results?

$242,897.88gap between two 2024 roads totals in the same budget book (worked out by us)

The 2025 budget book shows 2024 figures twice: once on its summary page and once in the line-by-line pages. They do not match. The summary says roads spending in 2024 was $600,659.52. The roads detail page says $843,557.40, a gap of $242,897.88 (worked out by us). The summary says 2024 capital works (buying and building long-lasting things) cost $889,302.56. The capital project list says $88,274.83. The summary says 2024 revenue was $3,749,678.93. The detail pages say $4,110,951.43. The whole revenue gap, $361,272.50 (worked out by us), sits in property tax: $2,356,103.07 on the summary and $2,717,375.57 on the tax page. The 2024 budget column also differs (for example roads: $1,037,514.46 and $1,038,514.46).

Found by reading the town's own documents · 7 sources

Worth askingHow decisions are made

Why was Chapple's 2025 budget adopted on June 17, 2025, almost half way through the year, and where is the 2026 budget?

June 17, 2025date Council adopted the 2025 budget by-law

A budget is the plan for the year's spending and taxes. The audited statements say Council adopted the 2025 financial plan by by-law on June 17, 2025. By then more than five months of the year had passed. The Township's finance page lists budgets for 2019 to 2025 but we did not find a 2026 budget there on October 10, 2026, with the year about three quarters over.

Found by reading the town's own documents · 2 sources

Worth askingMoney health

Why did Chapple borrow $566,550 at 6.85% in 2024 while it held $1,931,013 in cash and $3,178,339 in investments?

$566,550borrowed in 2024 at 6.85%; $442,504 still owed at the end of 2025

In 2024 the Township borrowed $566,550 from CAT Financial, an equipment lender, at 6.85% a year, repayable at $11,178 a month until September 2029. The 2025 budget book calls the yearly payment of $134,139.72 the payment on a "2024 Motor Grader". At the end of 2025 $442,504 was still owed, and interest on the debt was $34,064, up from $10,790. At the same time the Township held cash and investments of $5,338,826 at the end of 2025 (worked out by us: $2,232,762 and $3,106,064). Most of that is set aside: of the cash, $1,222,923 was restricted by Council resolution and $199,469 by funding agreements, leaving $810,370 unrestricted. In 2025 investment income was $359,564.

Found by reading the town's own documents · 6 sources

Good to know

Good to know

Background that helps make sense of the rest.

Good to knowMoney health

Why did Chapple's 2025 budget plan to take $1,035,858.11 from savings, when its reserves fell by $292,567 and it ended the year with a surplus?

$1,035,858.11planned draw on reserves and earlier surpluses in the 2025 budget

Reserves are savings set aside for named purposes. The 2025 budget balanced itself by drawing $1,035,858.11 from reserves and from earlier surpluses, of which $358,121.00 was labelled "Surplus". The audited statements agree: they print a planned deficit of $358,121 and transfers from reserves of $677,737, and the budget book's lines for reserves add to the same amounts. In the end the reserve funds fell from $4,622,247 to $4,329,680, which is $292,567 (worked out by us). The year closed with an annual surplus of $434,997 against a budgeted $196,397. The Township bought $774,803 of capital assets against a planned $1,026,894.

Found by reading the town's own documents · 4 sources

Good to knowMoney health

How will Chapple pay for $435,887 of landfill closure costs when its landfill closure reserve holds $190,295?

$435,887landfill closure obligation (worked out by us), against a $190,295 reserve

A landfill has to be closed and looked after when it is full. The Township's statements record this future cost as a debt-like item called an asset retirement obligation. For its two landfills it is $199,495 (Richardson) and $236,392 (Shenston), together $435,887 (worked out by us). Counting buildings, the obligation is $515,869. The estimated total future cost, not reduced to today's value, is $350,000 and $575,000 for the two landfills. The Township's reserve for landfill closures is $190,295. The statements expect the work to be spread over 37 and 35 years.

Found by reading the town's own documents · 4 sources

Good to knowMoney health

How much of Chapple's waste-site income in the 2025 budget was one-time cleanup money from a train derailment?

$226,250of the 2025 waste-site budget the Township says came from derailment cleanup

The 2025 budget plans $306,250 of waste-site revenue, against a 2024 budget of $80,000 and 2024 actual income of $207,287.76. The Township's own comment beside the line says "$226,250 rc'd from CN - potash/Emo Train Derailment". The budget book also notes the $226,250 difference from the 2024 budget. The audited statements show user fees of $470,636 in 2025, against a budget of $440,750 and $367,869 in 2024. The Township has explained where the money came from. What is not shown is how much of it was one-time, and what happens to it.

Found by reading the town's own documents · 4 sources

Good to knowRising costs

Why does Chapple's 2025 budget set aside $75,000 for auditors and $72,500 for legal and survey costs?

$147,500audit ($75,000) plus legal and survey ($72,500) in the 2025 budget (worked out by us)

In the 2025 budget, "Audit Administration" is $75,000, up from a 2024 budget of $65,000, after the 2024 spending reached $73,177.66. The Township's comment says "auditors - MNP". "Legal/Survey" is $72,500, up from a 2024 budget of $50,000 and 2024 actual spending of $2,237.53. The comment says $7500 is for legal costs for the Brigham Road south extension and $65,000 is for an Assessment Review Board matter. Together these lines are $147,500 (worked out by us). In the audited statements, general government spending in 2025 was $518,480 against a budget of $559,579.

Found by reading the town's own documents · 3 sources

Good to knowHow decisions are made

Did the water treatment plant work that Chapple budgeted in 2024 and again in 2025 go ahead?

$184,115.01water treatment plant capital in the 2025 budget, after $194,982.70 budgeted and unspent in 2024

The 2024 budget set aside $194,982.70 for the water treatment plant and none was spent that year. The 2025 budget set aside $184,115.01 for the plant, paid by a federal infrastructure grant (ICIP). The revenue budget counts $156,674.79 of ICIP Green Stream grant for "WTP projects in Capital". The audited statements show only $20,736 (federal) and $17,278 (provincial) of ICIP Green Stream money recognized in 2025, and $43,736 added to water mains and networks.

Found by reading the town's own documents · 4 sources

Each question in full

Worth askingFound by reading the town's documents

Why do the summary pages and the detail pages of Chapple's 2025 budget book give different 2024 results?

$242,897.88gap between two 2024 roads totals in the same budget book (worked out by us)

The 2025 budget book shows 2024 figures twice: once on its summary page and once in the line-by-line pages. They do not match. The summary says roads spending in 2024 was $600,659.52. The roads detail page says $843,557.40, a gap of $242,897.88 (worked out by us). The summary says 2024 capital works (buying and building long-lasting things) cost $889,302.56. The capital project list says $88,274.83. The summary says 2024 revenue was $3,749,678.93. The detail pages say $4,110,951.43. The whole revenue gap, $361,272.50 (worked out by us), sits in property tax: $2,356,103.07 on the summary and $2,717,375.57 on the tax page. The 2024 budget column also differs (for example roads: $1,037,514.46 and $1,038,514.46).

Why it matters

A budget book is how residents see what last year really cost before they judge next year's plan. When two pages of the same book disagree by hundreds of thousands of dollars, a reader cannot tell which one to trust, and the 2025 budget was built on those numbers.

It could be because…

  • The summary page may have been filled in from the accounts at one date and the detail pages at another, before and after year-end entries.
  • Part of the capital gap may be a purchase that sits outside the capital project list. The audited 2025 statements show $754,305 of machinery and equipment added in 2024, and the 2025 budget carries a payment on a 2024 motor grader.
  • The summary page may be built on a different basis (for example, leaving out items paid from restricted funds) and the book does not say so.
  • The audited statements are the final word on 2024; the budget book's "2024 Actual" column may simply be an early draft.

Questions you could ask

  1. Which 2024 roads total is right: $600,659.52 or $843,557.40, and which 2024 property tax total: $2,356,103.07 or $2,717,375.57?
  2. Why does the 2024 capital column on the summary ($889,302.56) differ from the capital project list ($88,274.83)?
  3. Will the 2026 budget book tie its summary pages to its detail pages and to the audited statements?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. 2025 Budget Summary, operating expenditures: "Transportation" 2024 Budget 1,037,514.46, 2024 Actual 600,659.52, 2025 Budget 1,315,730.24. "Capital Works" 2024 Budget 1,408,504.47, 2024 Actual 889,302.56, 2025 Budget 1,026,893.94. "Total of Operating Budget" 5,182,291.49, 3,785,480.97 and 5,202,603.19.

    Township of Chapple, 2025 Final Budget · 2025 Budget Summary, PDF page 1

  2. "Total Public Works Operating Budget": 2024 Budget 1,038,514.46, 2024 Actual 843,557.40, 2025 Budget 1,315,730.24. The same page lists "2024 Motor Grader (principle + interest payment for 2025)" 134,139.72, with the comment "CAT lease Annual payment $134,139.72".

    Township of Chapple, 2025 Final Budget · Public Works operating budget, last page of the section, PDF page 16

  3. Capital: "Total of Capital Projects" 2024 Budget 370,982.70, 2024 Actual 88,274.83, 2025 Budget 1,026,893.94.

    Township of Chapple, 2025 Final Budget · Capital project list, PDF page 2

  4. 2025 Budget Summary, revenues: "Taxation" 2024 Budget 2,501,852.42, 2024 Actual 2,356,103.07, 2025 Budget 2,671,975.16. "Total of Revenues" 3,637,684.50, 3,749,678.93 and 4,166,745.08.

    Township of Chapple, 2025 Final Budget · 2025 Budget Summary, PDF page 1

  5. Revenue budget, "Total Revenues": 2024 Budget 3,757,571.50, 2024 Actual 4,110,951.43, 2025 Budget 4,166,745.08.

    Township of Chapple, 2025 Final Budget · 2025 Revenue Budget, last page of the revenue section, PDF page 30

  6. Taxation page, "Total Taxation Revenues": 2024 Budget 2,621,739.42, 2024 Actual 2,717,375.57, 2025 Base 2,598,623.72, at 3.50% 2,671,975.16.

    Township of Chapple, 2025 Final Budget · Taxation, PDF page 31

  7. Note 8, Tangible capital assets, 2024 additions (scanned page): "Machinery and equipment" 754,305; total additions 1,536,877.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 8, Tangible capital assets, PDF page 17 (image; the 2024 additions column adds to 1,536,877)

↑ All questions

Worth askingFound by reading the town's documents

Why was Chapple's 2025 budget adopted on June 17, 2025, almost half way through the year, and where is the 2026 budget?

June 17, 2025date Council adopted the 2025 budget by-law

A budget is the plan for the year's spending and taxes. The audited statements say Council adopted the 2025 financial plan by by-law on June 17, 2025. By then more than five months of the year had passed. The Township's finance page lists budgets for 2019 to 2025 but we did not find a 2026 budget there on October 10, 2026, with the year about three quarters over.

Why it matters

Until a budget is adopted, residents cannot see what Council has agreed to spend, and Council has less to measure spending against.

It could be because…

  • Many small northern townships wait for the Province's grant announcements and the final tax assessment before setting rates. We did not check whether Chapple says so.
  • Council may have approved an interim tax bill earlier in the year to cover the first months. We did not find one.
  • The 2026 budget may have been adopted and not yet posted on the website.

Questions you could ask

  1. What date did Council adopt the 2026 budget, or when will it?
  2. Why was the 2025 budget adopted in June, and what spending authority did the Township use before then?
  3. Will the 2026 budget be posted before the October 26, 2026 election?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Note 18, Budget Reconciliation: "The Financial Plan (Budget) By-Law adopted by Council on June 17, 2025 was not prepared on a basis consistent with that used to report actual results (Public Sector Accounting Standards)."

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 18, Budget Reconciliation, PDF page 21 (printed page 16, image)

  2. The Municipal Budgets list on the finance page shows "2025 Budget" and "2024 Budget" as its newest entries. We found no 2026 budget on the page when we read it on October 10, 2026.

    Township of Chapple, Finance page · Budgets list, read October 10, 2026

↑ All questions

Worth askingFound by reading the town's documents

Why did Chapple borrow $566,550 at 6.85% in 2024 while it held $1,931,013 in cash and $3,178,339 in investments?

$566,550borrowed in 2024 at 6.85%; $442,504 still owed at the end of 2025

In 2024 the Township borrowed $566,550 from CAT Financial, an equipment lender, at 6.85% a year, repayable at $11,178 a month until September 2029. The 2025 budget book calls the yearly payment of $134,139.72 the payment on a "2024 Motor Grader". At the end of 2025 $442,504 was still owed, and interest on the debt was $34,064, up from $10,790. At the same time the Township held cash and investments of $5,338,826 at the end of 2025 (worked out by us: $2,232,762 and $3,106,064). Most of that is set aside: of the cash, $1,222,923 was restricted by Council resolution and $199,469 by funding agreements, leaving $810,370 unrestricted. In 2025 investment income was $359,564.

Why it matters

Borrowing costs interest. If savings sit in the bank while a loan runs at 6.85%, residents may ask whether the savings could have paid for the purchase, or whether they earn more than the loan costs. Much of the savings are restricted, so the answer may be sound, but the documents do not say.

It could be because…

  • Much of the cash and investments back reserve funds, and Council may not want to spend them on equipment it can pay for over five years.
  • The Township's investments may earn about as much as the loan costs. Investment income was $359,564 in 2025, but we could not tell the rate from the notes.
  • At the end of 2024 only $306,750 of the cash was unrestricted, so borrowing may have kept the day-to-day account from running low.
  • The loan may have carried a lower payment than a lump sum would have cost in lost investment income.

Questions you could ask

  1. Why did Council choose a 6.85% loan over paying from reserves or investments, and was the choice put to a vote?
  2. What rate do the Township's investments earn, compared with 6.85%?
  3. Could the loan be repaid early, and what would that cost?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Statement of cash flows, financing activities: "Proceeds from issuance of long-term debt" 2025 nil, 2024 566,550; "Repayment of demand debt" (100,076) in 2025, (107,120) in 2024.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Consolidated Statement of Cash Flows, PDF page 10 (printed page 5, image; cash end of year 2,232,762 equals the position statement)

  2. Note 5, Long-term debt: "CAT Financial loan with interest at 6.85%, equipment loan, repayable in monthly installments of $11,178 principal and interest, maturing September 2029." Balance 442,504 (2024 542,581). Repayments 2026 to 2029: principal 442,504, interest 60,519, total 503,023. "Interest on long-term debt amounted to $34,064 (2024 - $10,790)."

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 5, Long-term debt, PDF page 15 (printed page 10, image; the four principal amounts add to 442,504)

  3. Statement of financial position: "Cash and temporary investments" 2,232,762 (2024 1,931,013); "Investments" 3,106,064 (2024 3,178,339); "Long-term debt" 442,504 (2024 542,581).

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Consolidated Statement of Financial Position, PDF page 6 (printed page 1, image; financial assets add to 5,580,149)

  4. Note 2, Cash and cash equivalents: "Unrestricted" 810,370 (2024 306,750); "Restricted by Council resolution" 1,222,923 (2024 1,367,803); "Restricted by funding agreement" 199,469 (2024 256,460); total 2,232,762 (2024 1,931,013).

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 2, PDF page 13 (printed page 8, image; the three lines add to 2,232,762)

  5. Note 3, Investments: total 3,106,064 (2024 3,178,339). "The income from investments for the year was $359,564 (2024 - $312,728)."

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 3, Investments, PDF page 14 (printed page 9, image; the four lines add to 3,106,064)

  6. Public Works budget line "2024 Motor Grader (principle + interest payment for 2025)" 134,139.72, comment "CAT lease Annual payment $134,139.72".

    Township of Chapple, 2025 Final Budget · Public Works operating budget, PDF page 16

↑ All questions

Good to knowFound by reading the town's documents

Why did Chapple's 2025 budget plan to take $1,035,858.11 from savings, when its reserves fell by $292,567 and it ended the year with a surplus?

$1,035,858.11planned draw on reserves and earlier surpluses in the 2025 budget

Reserves are savings set aside for named purposes. The 2025 budget balanced itself by drawing $1,035,858.11 from reserves and from earlier surpluses, of which $358,121.00 was labelled "Surplus". The audited statements agree: they print a planned deficit of $358,121 and transfers from reserves of $677,737, and the budget book's lines for reserves add to the same amounts. In the end the reserve funds fell from $4,622,247 to $4,329,680, which is $292,567 (worked out by us). The year closed with an annual surplus of $434,997 against a budgeted $196,397. The Township bought $774,803 of capital assets against a planned $1,026,894.

Why it matters

A budget that plans to spend savings looks like a township living beyond its means. If the planned draw is much bigger than the real one, the budget may be asking taxpayers for more than needed, or it may be set too high for projects that slip. Under-spending is not a problem in itself, but residents should know whether the plan matches what the Township expects to do.

It could be because…

  • Projects planned for 2025 may have slipped to 2026, for example the water treatment plant work (see the separate question on it).
  • Budgets set in June (see the separate question on timing) are written with best guesses, and income such as interest and waste fees came in above plan.
  • The audited statements are on a different basis from the budget: they include amortization (the yearly wearing-out of assets) which the budget leaves out, so the surplus and the planned deficit are not directly comparable.

Questions you could ask

  1. Which of the 2025 reserve draws were actually made, and which projects slipped to 2026?
  2. How does Council decide how much of a planned draw on reserves to put in a budget?
  3. Will the 2026 budget show last year's planned draw next to the amount actually used?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Summary - 2025 Contributions into Budget from Reserves: "Surplus" 358,121.00; "Wood Gundy Renaissance HISA" 270,000.00; "Assessment at Risk Reserve" 32,000.00; "OCIF - HISA Reserve" 160,429.55; "Roads Reserve" 103,841.69; "Gas Tax Reserve" 37,480.43; "NORDS Fund Reserve" 73,985.44. "Contributions into Budget from Reserves" 1,035,858.11 (2024 Budget 679,500.21, 2024 Actual 370,327.98). "Contributions to Reserves" in the expenses table: 195,874.84.

    Township of Chapple, 2025 Final Budget · 2025 Budget Summary, PDF page 1

  2. Note 18, Budget Reconciliation: "Financial plan (budget) by-law deficit for the year" (358,121); "Transfers to reserves" 195,875; "Transfers from reserves" (677,737); "Budgeted capital additions" 1,026,894; "Budget surplus per consolidated statement of operations" 196,397. The column adds to 196,397.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 18, Budget Reconciliation, PDF page 21 (image; the column adds to 196,397)

  3. Note 9, Accumulated surplus: "Reserve funds" total 4,329,680 (2024 4,622,247), made of "Replacement of capital assets" 2,973,906 (2024 3,407,536), "Landfill closures" 190,295, "Other" 403,231, "Sick leave" 45,413 and "Chapple Community Development Fund" 716,835. The 2025 reserve lines add to 4,329,680.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 9, Accumulated surplus, PDF page 18 (image; the reserve lines add to 4,329,680 and the whole note to 14,170,834)

  4. Statement of operations: "Annual surplus" budget 196,397, actual 434,997 (2024 676,570). Note 8: 2025 additions to tangible capital assets 774,803.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Consolidated Statement of Operations, PDF page 7 (printed page 2, image; revenue 3,924,861 less expenses 3,489,864 is 434,997); Note 8, PDF page 17

↑ All questions

Good to knowFound by reading the town's documents

How will Chapple pay for $435,887 of landfill closure costs when its landfill closure reserve holds $190,295?

$435,887landfill closure obligation (worked out by us), against a $190,295 reserve

A landfill has to be closed and looked after when it is full. The Township's statements record this future cost as a debt-like item called an asset retirement obligation. For its two landfills it is $199,495 (Richardson) and $236,392 (Shenston), together $435,887 (worked out by us). Counting buildings, the obligation is $515,869. The estimated total future cost, not reduced to today's value, is $350,000 and $575,000 for the two landfills. The Township's reserve for landfill closures is $190,295. The statements expect the work to be spread over 37 and 35 years.

Why it matters

A reserve set up for a future cost lets today's ratepayers share it. If the reserve stays far below the cost, the bill moves to later taxpayers, or other savings have to cover it. The Township's accumulated surplus note lists the whole $515,869 as a deficit it must fund.

It could be because…

  • The costs fall decades from now, and the reserve and investment income may grow before then.
  • Other reserves, such as the $2,973,906 reserve for replacing capital assets, could be used when the time comes.
  • The waste site may keep bringing in revenue that the Township plans to add to the reserve (see the separate question on waste-site income).

Questions you could ask

  1. Does Council have a plan to build the landfill closure reserve toward the estimated cost, and by when?
  2. Is any part of waste-site income set aside for closure each year?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Note 6, Asset retirement obligations: Richardson Landfill balance end of year 199,495 (2024 187,496); estimated total undiscounted future expenditures $350,000 "to be incurred over 37 years". Shenston Landfill balance 236,392 (2024 222,172); undiscounted $575,000 "over 35 years". Buildings balance 79,982 (2024 75,172); undiscounted $125,170.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 6, Asset retirement obligations, PDF page 16 (printed page 11, image; 199,495 plus 236,392 plus 79,982 is 515,869, the amount on the position statement)

  2. Statement of financial position: "Asset retirement obligations" 515,869 (2024 484,840).

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Consolidated Statement of Financial Position, PDF page 6 (printed page 1, image)

  3. Note 9, reserve funds: "Landfill closures" 190,295 (2024 184,070); "Replacement of capital assets" 2,973,906. Other allocated deficits: "Asset retirement obligation" (515,869).

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 9, Accumulated surplus, PDF page 18 (printed page 13, image; the note adds to 14,170,834)

  4. Budget "Summary - 2025 Contributions into Budget from Reserves": "Landfill Closure Reserve (waste)" shown as nil for 2024 Budget, 2024 Actual and 2025 Budget.

    Township of Chapple, 2025 Final Budget · 2025 Budget Summary, PDF page 1

↑ All questions

Good to knowFound by reading the town's documents

How much of Chapple's waste-site income in the 2025 budget was one-time cleanup money from a train derailment?

$226,250of the 2025 waste-site budget the Township says came from derailment cleanup

The 2025 budget plans $306,250 of waste-site revenue, against a 2024 budget of $80,000 and 2024 actual income of $207,287.76. The Township's own comment beside the line says "$226,250 rc'd from CN - potash/Emo Train Derailment". The budget book also notes the $226,250 difference from the 2024 budget. The audited statements show user fees of $470,636 in 2025, against a budget of $440,750 and $367,869 in 2024. The Township has explained where the money came from. What is not shown is how much of it was one-time, and what happens to it.

Why it matters

One-time income can make a year look healthier than it is. If a budget counts on it as normal revenue, a gap opens when the cleanup ends. It also fills landfill space, which matters because the Township owes $435,887 for closing its two landfills (199,495 for Richardson plus 236,392 for Shenston, worked out by us).

It could be because…

  • The Township may use the money to pay for waste-site costs, upgrades or the closure reserve; we did not find where it went.
  • The budget may show the amount in one year only because it was a one-off, which is what the comment suggests.
  • Income from one-time cleanup waste can help to keep ordinary fees low.

Questions you could ask

  1. How much cleanup income did the Township receive in 2024, 2025 and 2026, and is more expected?
  2. Where was the money put: operating, the landfill closure reserve, or something else?
  3. How much landfill space did the cleanup waste use?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Waste Disposal Services revenue, "REVENUE WASTE DISPOSAL SITE": 2024 Budget 80,000.00, 2024 Actual 207,287.76, 2025 Budget 306,250.00, with the comment "$226,250 rc'd from CN - potash/Emo Train Derailment". The next line, "Waste Disposal - Penalty & Interest", carries the comment "2024 includes contaminated - Couchiching Cleanup".

    Township of Chapple, 2025 Final Budget · 2025 Revenue Budget, Waste Disposal Services, PDF pages 29 and 30

  2. "Total Waste Revenues" 80,000.00, 207,287.76 and 306,250.00; a difference line of (226,250.00) "difference in waste revenues budget from 2024".

    Township of Chapple, 2025 Final Budget · 2025 Revenue Budget, Total Waste Revenues, PDF page 30

  3. Statement of operations: "User fees" budget 440,750, actual 470,636 (2024 367,869).

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Consolidated Statement of Operations, PDF page 7 (printed page 2, image; revenue lines add to 3,924,861)

  4. Note 6, Asset retirement obligations: Richardson Landfill "Balance, end of year" 199,495 (2024 187,496); Shenston Landfill "Balance, end of year" 236,392 (2024 222,172).

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 · Note 6, PDF page 16 (printed page 11, scanned image)

↑ All questions

Good to knowFound by reading the town's documents

Did the water treatment plant work that Chapple budgeted in 2024 and again in 2025 go ahead?

$184,115.01water treatment plant capital in the 2025 budget, after $194,982.70 budgeted and unspent in 2024

The 2024 budget set aside $194,982.70 for the water treatment plant and none was spent that year. The 2025 budget set aside $184,115.01 for the plant, paid by a federal infrastructure grant (ICIP). The revenue budget counts $156,674.79 of ICIP Green Stream grant for "WTP projects in Capital". The audited statements show only $20,736 (federal) and $17,278 (provincial) of ICIP Green Stream money recognized in 2025, and $43,736 added to water mains and networks.

Why it matters

Grant money usually has to be spent on a named project by a deadline, or it may be lost. If a project is budgeted two years in a row and spending lags, residents will want to know that the plant is being looked after and that the grant is not at risk.

It could be because…

  • Work on a plant often takes more than one year to design, tender and build, and grant money is claimed as costs are paid.
  • The grant may have been approved late, so the work started in 2026.
  • Some water work may be in other lines, such as the $43,736 added to water mains and networks.

Questions you could ask

  1. How much of the $184,115.01 was spent on the water treatment plant in 2025, and what is left to do?
  2. When does the grant money have to be used by?
  3. Is the Township planning to put the unspent amount into the 2026 budget?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Capital: "Water Treatment Plant" 2024 Budget 194,982.70, 2024 Actual nil, 2025 Budget 184,115.01. Project table: "Water Treatment Plant", source of funds "ICIP Grant Federal Funding", 184,115.01.

    Township of Chapple, 2025 Final Budget · Capital project list, PDF page 2

  2. Grants: "PROVINCIAL GRANTS - ICIP GREEN STREAM" 2024 Budget nil, 2024 Actual nil, 2025 Budget 156,674.79, comment "grant for WTP projects in Capital".

    Township of Chapple, 2025 Final Budget · 2025 Revenue Budget, Grants, PDF page 28

  3. Note 10 (federal) "ICIP Green Stream" 20,736 in 2025, nil in 2024. Note 11 (provincial) "ICIP Green Stream" 17,278 in 2025, nil in 2024.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Notes 10 and 11, Government transfers, PDF page 19 (printed page 14, image; the federal column adds to 46,655 and the provincial one to 704,725)

  4. Note 8, 2025 additions: "Water mains/networks" 43,736 (2024 177,744); total additions 774,803.

    Township of Chapple, Consolidated Financial Statements, December 31, 2025 (MNP LLP, June 17, 2026) · Note 8, Tangible capital assets, PDF page 17 (image; the 2025 additions column adds to 774,803)

↑ All questions

Good to knowFound automatically from financial reports

Why does Chapple spend more than most similar towns on snow ploughing?

$438per home on snow ploughing, 2025

Chapple spent about $438 per home on snow ploughing in 2025. The typical similar town spent $117. Only 1 of 29 similar towns spent more.

Why it matters

Spending more than neighbours is not wrong by itself. It might buy better service. But it is the first place to look for costs that could be lower, such as contracts that were not competitively bid.

It could be because…

  • Geography: more roads, more snow, a bigger area or a landfill of its own.
  • Accounting: some towns record the same cost in a different category.
  • A one-time cost in this year.

Questions you could ask

  1. What makes this cost higher here than in similar towns?
  2. When were the main contracts in this area last put out to competitive tender?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Chapple? Send us your answer and we will publish it with this question.

The evidence

  1. Snow ploughing per home: Chapple $438; typical similar town $117; ranked 2nd highest of 30.

    Ontario Financial Information Return (FIR), 2025, 29 similar municipalities · Schedule 40 and Schedule 2 · archived copy