Not the full picture. Built from public records, which leave things out.Read by hand, Oct 2026DetailsThis is built from public records, which leave a lot out, and some of it may be wrong or out of date. Check the sources, and tell us if you spot a mistake. What this site can't tell you
Read by hand. We read Charlton-Dack's own documents for this site in October 2026; the Sources page lists which ones. The comparisons with other places still come from the Province's yearly reports.

Questions · 10 so far

Things worth asking about

We read Charlton-Dack's financial reports and meeting minutes, and compared its numbers with 24 similar Ontario towns. These are the things that stood out.

What these are, and what they are not. A question here means a number or practice is unusual, or harder to see than it should be. It does not mean anyone did anything wrong. Most unusual numbers turn out to have ordinary explanations, and every question lists some. The only way to know is to ask.
Needs an answer

Needs an answer

These are unusual enough that residents deserve a clear answer from council.

Needs an answerRising costs

Why did Charlton-Dack's property tax go up 14% in 2025?

+14%town property tax, 2024 to 2025

In 2025, Charlton-Dack collected $108K more in its own property tax than in 2024. That is a 14% jump, while prices went up about 2.1%. Only 1 of 24 similar towns raised theirs by more.

Found automatically from the town's financial reports · 3 sources

Needs an answerMoney health

Why are so many property taxes unpaid?

$216Kowed in unpaid property tax, end of 2025

At the end of 2025, $216K of property tax had been billed but not paid. That is 21% of everything billed. Only 2 of 24 similar towns had a higher share. A year earlier it was $218K.

Found automatically from the town's financial reports · 2 sources

Worth asking

Worth asking

There may well be a good reason. It is still worth asking what it is.

Worth askingOpenness

Why are the Municipality's audited financial statements after 2021 not on its website?

2021the newest year of audited statements we found posted, against a June 2026 council approval of the 2025 statements

Audited financial statements are the yearly report card on a municipality's money, checked by an outside accountant. The Municipality's Financial Statements page links nine years, 2013 to 2021. The newest has an auditor's report dated June 6, 2022. Council's minutes of June 1, 2026 show that council received and approved the 2025 audited financials that day. We did not find the 2025 statements, or the ones for 2022, 2023 and 2024, on the website.

Found by reading the town's own documents · 3 sources

Worth askingOpenness

Where can residents read the 2026 budget that council approved on June 1, 2026?

3.75%tax increase approved on June 1, 2026, with no budget document that we could find

A budget is the plan for what the Municipality will spend and collect in a year. Council was shown a draft 2026 budget on April 13, 2026. On May 4, a motion to approve a budget with the tax increase left blank was deferred. On June 1, 2026, council approved the 2026 budget "with a tax increase of 3.75%", higher water charges, and tax rates were set on July 6. We did not find the budget itself, draft or adopted, on the website. The agendas list "2026 Draft Budget (attachment)", but the posted agenda files hold only the list of items.

Found by reading the town's own documents · 4 sources

Worth askingSpending level

How was the $238,000 Grant Road repair priced, and how will the Municipality pay for it?

$238,000Grant Road repair awarded on July 6, 2026

On July 6, 2026 council awarded the Grant Road repair to Curran Contracting for $238,000, after a request for quotes (an RFQ, where the Municipality asks contractors for a price). One month earlier, on June 1, the minutes list the roads for maintenance in 2026 as Brentha Road, River Road and the Charlton grindings. Grant Road was not on that list. We did not find how many quotes came in, what the other prices were, or which budget or grant pays for the work.

Found by reading the town's own documents · 3 sources

Worth askingOpenness

Where do residents find the results of the Municipality's requests for quotes?

2022the year of the newest tender listed on the RFP and Tenders page

A request for quotes is how a municipality asks contractors to price a job. The 2026 minutes and agendas name several: the Grant Road repair, sand shed repairs (a quote for $85,500.00 was approved on April 13) and a Winter Sand RFQ on the September 2 agenda. The Municipality's RFP and Tenders page lists two items, both gravel tenders from 2022, and nothing newer.

Found by reading the town's own documents · 4 sources

Worth askingRising costs

Why are costs at the Charlton water plant rising, and who is paying for them?

$20,000approximate bill for "extras" at the Charlton water plant by February 2, 2026

On February 2, 2026, staff told council that both lift pumps (the pumps that move water through the plant) at the Charlton water plant were having issues, although both were less than a year old, and that a bill for "extras" of approx. $20,000 had already come in for 2026. Staff were to meet the local MPP about the rising costs of running the plant. On June 1, council raised the charge for vacant lots on the water system from $50 to $75 and user fees for Charlton water system users by $50 each. A Charlton Water Plant report is listed as an attachment on the September 2 agenda, and we could not read it.

Found by reading the town's own documents · 4 sources

Good to know

Good to know

Background that helps make sense of the rest.

Good to knowSpending level

What did the sand shed fire cost, and how much of it will insurance cover?

$85,500.00repair quote approved on April 13, 2026 and rescinded on May 4 after the fire

On April 13, 2026 council approved a quote of $85,500.00 from Carved in Stone for sand shed repairs. On May 4 the public works report said a plow truck caught fire, which damaged the sand shed, and that insurance was now involved. That day council rescinded (cancelled) the April approval "as the asset has since been damaged in a fire". The July 6 minutes say sand shed quotes were being obtained, and a Winter Sand RFQ is on the September 2 agenda. We did not find what the new repair will cost or what insurance will pay.

Found by reading the town's own documents · 3 sources

Good to knowMoney health

Is money being set aside to close the landfill, as the Municipality's statements say it expects?

$28,798landfill liability at December 31, 2021, described as unfunded

A landfill must be capped and watched for years after it closes, and the cost is counted as a debt that builds up as the site fills. The 2021 statements record a landfill closure and post-closure liability of $28,798, out of an estimated future total of $100,431. The note says the liability "is currently unfunded and is expected to be funded through budget allocations to a landfill reserve". The list of reserves in note 13 has no landfill reserve. The statements for later years are not posted, so we could not check whether one has been started.

Found by reading the town's own documents · 2 sources

Each question in full

Needs an answerFound automatically from financial reports

Why did Charlton-Dack's property tax go up 14% in 2025?

+14%town property tax, 2024 to 2025

In 2025, Charlton-Dack collected $108K more in its own property tax than in 2024. That is a 14% jump, while prices went up about 2.1%. Only 1 of 24 similar towns raised theirs by more.

Why did Charlton-Dack's property tax go up 14% in 2025?
$894K
Show as a table
YearTown property tax
2019$636K
2020$636K
2021$686K
2022$715K
2023$744K
2024$786K
2025$894K

Why it matters

A big one-year jump usually means something changed: a new cost, a service that grew, savings being rebuilt, or a problem from earlier years being paid for now. Residents should be able to see exactly which. Spread across every home, it is about $386 more each year.

It could be because…

  • Costs the town cannot control went up, such as policing, insurance or county charges.
  • The town kept taxes too low in earlier years and is catching up.
  • The town is rebuilding savings or paying for a big project like a bridge or equipment.

Questions you could ask

  1. What were the three biggest reasons for the 2025 increase, in dollars?
  2. Is a similar increase planned for next year?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Town property tax: $786,131 in 2024, $894,190 in 2025.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 10, line 9940 · archived copy

  2. Typical increase among 24 similar Ontario towns: 4.4%. Charlton-Dack ranks 2nd highest.

    Ontario Financial Information Return (FIR), 2025, 24 similar municipalities · Schedule 10, line 9940 · archived copy

  3. Prices (inflation) rose 2.1% over the same year.

    Statistics Canada CPI, table 18-10-0005-01 · archived copy

↑ All questions

Needs an answerFound automatically from financial reports

Why are so many property taxes unpaid?

$216Kowed in unpaid property tax, end of 2025

At the end of 2025, $216K of property tax had been billed but not paid. That is 21% of everything billed. Only 2 of 24 similar towns had a higher share. A year earlier it was $218K.

Why are so many property taxes unpaid?
$216K
Show as a table
YearUnpaid property tax at year end
2019$148K
2020$120K
2021$89,175
2022$128K
2023$193K
2024$218K
2025$216K

Why it matters

When taxes go unpaid, everyone else carries the cost, and the town may borrow to cover the gap. The Province's financial indicators treat 10% to 15% as a moderate risk and more than 15% as a high risk. Collection is the town's job, so a rising number is worth asking about.

It could be because…

  • The final tax bill was due late in the year, so some payments simply arrived in January.
  • A few large properties are in dispute or being sold for back taxes.
  • Hard times for residents, which the town may be handling with payment plans.

Questions you could ask

  1. How much is more than one year overdue, and from how many properties?
  2. Are the rules for chasing unpaid taxes applied the same way to everyone?
  3. Has the town registered tax arrears certificates on properties about two years behind? If still unpaid a year after that, Ontario law lets the town sell the property.

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Taxes receivable: 2019 $148K, 2020 $120K, 2021 $89,175, 2022 $128K, 2023 $193K, 2024 $218K, 2025 $216K. Of the 2025 total, $53,914 was from earlier years.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 70, lines 0610 to 0699 · archived copy

  2. Typical among similar towns: 9.4% of taxes billed.

    Ontario Financial Information Return (FIR), 2025, 24 similar municipalities · Schedules 26 and 70 · archived copy

↑ All questions

Worth askingFound by reading the town's documents

Why are the Municipality's audited financial statements after 2021 not on its website?

2021the newest year of audited statements we found posted, against a June 2026 council approval of the 2025 statements

Audited financial statements are the yearly report card on a municipality's money, checked by an outside accountant. The Municipality's Financial Statements page links nine years, 2013 to 2021. The newest has an auditor's report dated June 6, 2022. Council's minutes of June 1, 2026 show that council received and approved the 2025 audited financials that day. We did not find the 2025 statements, or the ones for 2022, 2023 and 2024, on the website.

Why it matters

The statements are the one place a resident can see the whole picture: what the Municipality owns, what it owes, what it saved and what it spent. Without the last four years, the newest picture a resident can read is five years old.

It could be because…

  • A small office may simply be behind on updating its website. The statements may be available at the office on request.
  • The 2025 statements were approved only on June 1, 2026, so they may not yet have been posted. That would not explain 2022 to 2024.
  • The Municipality may post them somewhere we did not look. We read the Financial Statements page and the site's sitemap.

Questions you could ask

  1. Will the Municipality post the audited statements for 2022, 2023, 2024 and 2025 before the October 26, 2026 election?
  2. Are the statements available at the municipal office in the meantime, and who asks for them?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. The Financial Statements page lists "2021 Financial Statements", "2020 Financial Statements", and so on back to "2013 Financial Statements". No later year is listed.

    Municipality of Charlton and Dack, Financial Statements page · list of nine links, read October 7, 2026

  2. Minutes of June 1, 2026, item 5: "THAT Council receive and approve the 2025 Audited Financials, and the signing of required documents." (motion 26-67, carried), after a presentation from the auditor's firm.

    Council Meeting Minutes, June 1, 2026 · page 1, item 5, Guests, Delegations, Petitions

  3. The newest posted statements are for December 31, 2021. The auditor's report is dated June 6, 2022.

    Financial Report, December 31, 2021 · PDF page 6, end of the Independent Auditor's Report

↑ All questions

Worth askingFound by reading the town's documents

Where can residents read the 2026 budget that council approved on June 1, 2026?

3.75%tax increase approved on June 1, 2026, with no budget document that we could find

A budget is the plan for what the Municipality will spend and collect in a year. Council was shown a draft 2026 budget on April 13, 2026. On May 4, a motion to approve a budget with the tax increase left blank was deferred. On June 1, 2026, council approved the 2026 budget "with a tax increase of 3.75%", higher water charges, and tax rates were set on July 6. We did not find the budget itself, draft or adopted, on the website. The agendas list "2026 Draft Budget (attachment)", but the posted agenda files hold only the list of items.

Why it matters

The budget is what residents pay tax for. A percentage alone does not say how many dollars it raises, what it pays for, or what it was compared with. The budget was approved in the sixth month of the year, so part of it had already been spent.

It could be because…

  • Small municipalities often wait for assessment and other figures from outside bodies before setting tax rates, which can push the budget into the summer.
  • The attachments may be given to council and kept at the municipal office, and the Municipality may share them on request.
  • The posted agenda PDFs may simply leave attachments out, and a fuller package may exist in the council members' log-in area, which we cannot read.

Questions you could ask

  1. Will the Municipality post the adopted 2026 budget, showing the dollars to be raised by taxes and water charges?
  2. What was the reason for approving the budget on June 1 rather than earlier in the year?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Minutes of June 1, 2026, item 8.2: "THAT Council hereby approves the 2026 Budget with a tax increase of 3.75%, an increase in water charges for vacant lots from $50 to $75, and an increase in user fees for Charlton water system users by $50 each." (motion 26-71, carried).

    Council Meeting Minutes, June 1, 2026 · page 2, item 8.2 Draft Budget

  2. Minutes of May 4, 2026, item 8.2: "THAT Council hereby approves the 2026 Budget with a tax increase of ____ %" (motion 26-58), marked "deferred".

    Council Meeting Minutes, May 4, 2026 · page 2, item 8.2 Draft Budget (attachment) - Motion

  3. Minutes of April 13, 2026, item 8.2: "2026 Municipal Draft Budget presented, staff will come back with examples for tax rates".

    Council Meeting Minutes, April 13, 2026 · page 3, item 8.2 Draft Budget (attachment)

  4. The June 1, 2026 agenda lists item 8.2 as "2026 Draft Budget (attachment) -Motion". The agenda file is a list of items and does not contain the attachment.

    Council Agenda, June 1, 2026 · page 1, item 8.2

↑ All questions

Worth askingFound by reading the town's documents

How was the $238,000 Grant Road repair priced, and how will the Municipality pay for it?

$238,000Grant Road repair awarded on July 6, 2026

On July 6, 2026 council awarded the Grant Road repair to Curran Contracting for $238,000, after a request for quotes (an RFQ, where the Municipality asks contractors for a price). One month earlier, on June 1, the minutes list the roads for maintenance in 2026 as Brentha Road, River Road and the Charlton grindings. Grant Road was not on that list. We did not find how many quotes came in, what the other prices were, or which budget or grant pays for the work.

Why it matters

This is a large job for a municipality this size. In 2021 the Municipality's total expenses were $1,786,154, and it added $88,531 of roads that year. Spending of this size should have a clear price comparison and a clear source of money.

It could be because…

  • Grant Road may have been damaged or failed after the June list was made, so the repair became urgent.
  • Several contractors may have quoted, and Curran Contracting may have been the lowest.
  • The work may be paid for by a provincial or federal grant, or by reserves, which the minutes do not say.
  • The June list may only name the roads for routine maintenance, and Grant Road may be a separate capital project.

Questions you could ask

  1. How many quotes did the Municipality receive for the Grant Road repair, and what were they?
  2. Which budget line, reserve or grant pays for it?
  3. Why was Grant Road not on the June 1 list of roads for 2026?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Minutes of July 6, 2026, item 6.2 Grant Rd Repair RFQ: "THAT Council approves Grant Rd repair is awarded to Curran Contracting in the amount of $238,000." (motion 26-78, carried). The minutes give no other quotes and no funding source.

    Council Meeting Minutes, July 6, 2026 · page 2, item 6.2

  2. Minutes of June 1, 2026, item 6.2 Roads for maintenance in 2026: "Brentha Road, from River Rd west", "River Rd, from Sprucegrove to bridge", "Charlton grindings".

    Council Meeting Minutes, June 1, 2026 · page 2, item 6.2

  3. Context from the newest posted audited statements, for 2021: total expenses 1,786,154. Tangible capital asset note: roads, additions during 2021, 88,531. Worked out by us, the July 2026 award is more than double that year's road additions.

    Financial Report, December 31, 2021 · PDF page 8 (Statement of Operations, Total expenses) and PDF page 23 (note 12, Roads row)

↑ All questions

Worth askingFound by reading the town's documents

Where do residents find the results of the Municipality's requests for quotes?

2022the year of the newest tender listed on the RFP and Tenders page

A request for quotes is how a municipality asks contractors to price a job. The 2026 minutes and agendas name several: the Grant Road repair, sand shed repairs (a quote for $85,500.00 was approved on April 13) and a Winter Sand RFQ on the September 2 agenda. The Municipality's RFP and Tenders page lists two items, both gravel tenders from 2022, and nothing newer.

Why it matters

Publishing who was asked, who bid and who won is how residents can see that public money was spent at a fair price.

It could be because…

  • Small jobs may be quoted by phone under the Municipality's purchasing policy, which we did not find online.
  • The page may be out of date rather than a sign that nothing is being tendered.
  • Results may be in council's reports, which the posted agendas name but do not include.

Questions you could ask

  1. Will the Municipality post the invitation, the bids received and the winner for each RFQ over a set dollar amount?
  2. Is there a purchasing policy that says when quotes are required, and can it be posted?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. The RFP and Tenders page lists "2022 Gravel Tenders": "2022-03- Municipality of Charlton and Dack" and "2022-04- Township of Chamberlain". No other item is listed.

    Municipality of Charlton and Dack, RFP and Tenders page · whole page, read October 7, 2026

  2. Agenda of September 2, 2026, item 6.2: "Winter Sand RFQ -Motion".

    Council Agenda, September 2, 2026 · page 1, item 6.2

  3. Minutes of July 6, 2026, item 6.2 Grant Rd Repair RFQ: awarded to Curran Contracting in the amount of $238,000.

    Council Meeting Minutes, July 6, 2026 · page 2, item 6.2

  4. Resolution 26-39b: "That Council approves quote from Carved in stone in the amount of $85,500.00 for Sand Shed repairs." "carried"

    Council Meeting Minutes, April 13, 2026 · page 2, resolution 26-39b

↑ All questions

Worth askingFound by reading the town's documents

Why are costs at the Charlton water plant rising, and who is paying for them?

$20,000approximate bill for "extras" at the Charlton water plant by February 2, 2026

On February 2, 2026, staff told council that both lift pumps (the pumps that move water through the plant) at the Charlton water plant were having issues, although both were less than a year old, and that a bill for "extras" of approx. $20,000 had already come in for 2026. Staff were to meet the local MPP about the rising costs of running the plant. On June 1, council raised the charge for vacant lots on the water system from $50 to $75 and user fees for Charlton water system users by $50 each. A Charlton Water Plant report is listed as an attachment on the September 2 agenda, and we could not read it.

Why it matters

A small water system is paid for by the few households connected to it. If its costs rise, those households pay more. The Municipality's own 2021 statements show a very small saved balance for the Charlton water system.

It could be because…

  • New equipment often has early faults that the supplier fixes under warranty.
  • The extra bill may be for repairs, testing or operator time that the pumps' faults caused, and may be recovered.
  • Provincial rules for drinking water keep adding cost for small systems. That is likely why staff asked to meet the MPP.
  • The 2021 reserve figures are five years old, and the Municipality may have added to them since.

Questions you could ask

  1. Are the two lift pumps under warranty, and has the supplier been asked to pay for the repairs and the extras?
  2. What did the Charlton water system cost to run in 2025, and how much of that did users pay?
  3. Could the Municipality post the Charlton Water Plant report that went to council on September 2?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Minutes of February 2, 2026, item 6.1: "issues at Water Plant in Charlton, both lift pumps are having issues and both are less than a year old. Also we have received a bill for "extras" of approx.. $20,000 already for 2026" and "staff to arrange meeting with MPP to discuss rising costs of operating/maintaining the plant".

    Council Meeting Minutes, February 2, 2026 · page 2, item 6.1 Public Works Report

  2. Minutes of June 1, 2026, item 8.2: water charges for vacant lots from $50 to $75, and user fees for Charlton water system users up by $50 each (motion 26-71).

    Council Meeting Minutes, June 1, 2026 · page 2, item 8.2

  3. Agenda of September 2, 2026, item 6.4: "Charlton Water Plant (attachment)". The attachment is not in the posted file.

    Council Agenda, September 2, 2026 · page 1, item 6.4

  4. Context from the 2021 statements, note 13, special purpose reserves: "Charlton water" 3,049 at the end of 2021 (6,038 at the end of 2020).

    Financial Report, December 31, 2021 · PDF page 24, note 13 Accumulated Surplus

↑ All questions

Worth askingFound automatically from financial reports

Why did the cost of water, sewers and garbage grow 53% in 6 years?

+53%water, sewers and garbage, 2019 to 2025

Charlton-Dack spent $187K on water, sewers and garbage in 2019 and $287K in 2025. Prices only went up about 21% in that time.

Why did the cost of water, sewers and garbage grow 53% in 6 years?
+53%
Show as a table
YearWater, sewers and garbagePrices (inflation)
2019+0%+0%
2020+18%+1%
2021+19%+4%
2022+20%+11%
2023+24%+16%
2024+43%+18%
2025+53%+21%

Change since the first year shown. The grey line is how much prices rose overall, for comparison.

Why it matters

When one area grows much faster than prices, it is either doing more (which may be great) or paying more for the same thing. Residents deserve to know which.

It could be because…

  • The town added a service, a building or staff that residents asked for.
  • Costs were moved from another area, so the total did not really change.
  • Accounting rules changed how costs are sorted.
  • Large one-time costs, like a study, lawsuit or repair, landed in one year.

Questions you could ask

  1. What did the extra $99,397 a year pay for?
  2. Why did the dump (landfill) go from $18,172 to $74,583?
  3. Was each increase approved by council as a separate decision, or did it happen through the yearly budget?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Water, sewers and garbage: 2019 $187K, 2020 $221K, 2021 $223K, 2022 $226K, 2023 $231K, 2024 $268K, 2025 $287K.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 40 · archived copy

  2. Biggest driver: The dump (landfill), from $18,172 to $74,583.

    Ontario Financial Information Return (FIR), 2019 to 2025 · Schedule 40 · archived copy

↑ All questions

Good to knowFound by reading the town's documents

What did the sand shed fire cost, and how much of it will insurance cover?

$85,500.00repair quote approved on April 13, 2026 and rescinded on May 4 after the fire

On April 13, 2026 council approved a quote of $85,500.00 from Carved in Stone for sand shed repairs. On May 4 the public works report said a plow truck caught fire, which damaged the sand shed, and that insurance was now involved. That day council rescinded (cancelled) the April approval "as the asset has since been damaged in a fire". The July 6 minutes say sand shed quotes were being obtained, and a Winter Sand RFQ is on the September 2 agenda. We did not find what the new repair will cost or what insurance will pay.

Why it matters

A fire is an insured loss, so the final cost to taxpayers depends on the claim. The shed stores road sand and salt for winter, so the timing of the repair matters before snow.

It could be because…

  • The insurance claim may still be open, so no final figure exists yet.
  • Cancelling a repair quote after a fire is the sensible step, because the earlier scope no longer fits the damage.
  • Insurance may cover most of the cost, leaving only a deductible to taxpayers.

Questions you could ask

  1. What is the estimated cost to repair or replace the sand shed, and what has the insurer agreed to pay?
  2. Will the Municipality report the final cost to council in open session?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Minutes of April 13, 2026, item 7.1 (motion 26-39b): "That Council approves quote from Carved in stone in the amount of $85,500.00 for Sand Shed repairs."

    Council Meeting Minutes, April 13, 2026 · page 2, item 7.1

  2. Minutes of May 4, 2026, item 6.1: "plow truck caught fire, resulting in damage to the sand shed. Insurance is now involved." Item 10 (motion 26-62): "THAT Council hereby rescinds Resolution 26-39b regarding sand shed repairs, as the asset has since been damaged in a fire."

    Council Meeting Minutes, May 4, 2026 · page 1, item 6.1, and page 4, item 10

  3. Minutes of July 6, 2026, item 6.1: "Sand Shed quotes being obtained".

    Council Meeting Minutes, July 6, 2026 · page 2, item 6.1 Public Works Report

↑ All questions

Good to knowFound by reading the town's documents

Is money being set aside to close the landfill, as the Municipality's statements say it expects?

$28,798landfill liability at December 31, 2021, described as unfunded

A landfill must be capped and watched for years after it closes, and the cost is counted as a debt that builds up as the site fills. The 2021 statements record a landfill closure and post-closure liability of $28,798, out of an estimated future total of $100,431. The note says the liability "is currently unfunded and is expected to be funded through budget allocations to a landfill reserve". The list of reserves in note 13 has no landfill reserve. The statements for later years are not posted, so we could not check whether one has been started.

Why it matters

If the site closes without savings set aside, the cost lands on whoever pays taxes then. The amounts are small now, but they grow as the site fills.

It could be because…

  • The Municipality says it plans to fund the liability over the remaining life of the landfill, which it puts at about 39 years, so there is no rush.
  • A reserve may have been started after 2021. The later statements would show it.
  • The amount is small compared with the Municipality's working capital reserve, so the Municipality may be treating that as the backstop.

Questions you could ask

  1. Has the Municipality started a landfill reserve since 2021, and how much does it hold?
  2. Will the 2025 statements show the landfill liability and how it is funded?

You can ask during the public part of a council meeting, by writing to the clerk, or by contacting your councillors. How to reach council.

Speak for Charlton-Dack? Send us your answer and we will publish it with this question.

The evidence

  1. Note 11: "The recorded liability is $28,798 (2020 - $21,545) based on a total estimated liability in the future of $100,431 (2020 - $94,753)" and "The liability is currently unfunded and is expected to be funded through budget allocations to a landfill reserve over the remaining life of the landfill."

    Financial Report, December 31, 2021 · PDF page 22, note 11 Landfill Closure and Post-Closure

  2. Note 13, special purpose reserves at the end of 2021 include Bradley subdivision water 2,333, Cemetery 32,204, Fire department 40,186, Working capital 439,608 and a total of 600,400. No landfill reserve is listed.

    Financial Report, December 31, 2021 · PDF page 24, note 13 Accumulated Surplus